City of San Jacinto 7th Street Pavement Repairs

Slides:



Advertisements
Similar presentations
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
Advertisements

2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Professional Engineering Procurement Services Division Solicitation No. 15-5RFP5004 Donella Drive Improvements Project Status Presented By: Kyle Gass,
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Implementing the MWD Water Supply Allocation Plan for Sub Agencies Elizabeth Lovsted, PE Sr. Civil Engineer.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Newport Beach City Council Meeting January 22, 2013 Agenda Item No. 16.
PROJECT SELECTION RIGHT TOOLS, RIGHT TIME, RIGHT PROJECT Presented by Joe Ririe, PE PAVEMENT ENGINEERING INC. September 9, 2015.
City of Woburn – City Council Committee on Water Update on Water and Sewer System Improvements Projects City Council ChambersJune 1, :00 pm City.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
Pier Partial GMP Proposal for Marine Structural June 1, 2017
TVRWRF 23 MGD Expansion Disinfection System Conversion
Water Booster Station Improvement Study
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Special Assessments John T. Shockley, Attorney Ohnstad Twichell, P.C.
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Village of east aurora sycamore street water improvements
Sun City Lift Station Odor Control Improvements
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Well 38 Drilling & Testing Amendment
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
OMI - THAMES WATER, INC ANNUAL SETTLEMENT STATEMENT CONTRACT YEAR 3
Perris Water Filtration Plant Membrane Upgrade – Phase I
District-Wide Well Maintenance, Rehabilitation, and Repair
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Sausalito Downtown Public Restroom
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
City of Bloomfield Hills
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Ad Hoc Advisory Group presentation, August 3, 2016
Voice Radio System Replacement Project
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Emphasis on Quality Rochester’s City Owner Contract Process
4th Annual Construction Law Summit
Project Scope of Work Project Contacts
General Grants Program Process
Issaquah-Fall City Road
City of Katy – Pine Forest Workshop Update
Construction Management & Engineering
Delta Water Supply Project
Walker Street Reconstruction Project 25% Design Public Hearing
Robincrest/Elmgate/ Linneman Improvements Welcome!
Ward Park Restroom Timeline
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
ACEC Designer Training
10 DAY PUBLIC NOTICE: Water Main
Athletic Field Improvements
Larimer County: engineering
Presentation transcript:

City of San Jacinto 7th Street Pavement Repairs Joe Mouawad, P.E. September 7, 2016

7th Street Pavement Repairs Uneven pavement and surface damage are visible along 7th Street between Sanderson Ave. and Ivy Crest Drive in City of San Jacinto Pavement condition is associated with District’s sewer project completed in 2008 District made repairs at select locations in 2010 and 2015 Additional repairs necessary

Evaluation of Pavement Conditions Areas repaired by the District Distressed pavement areas No curb/gutter District retained Inland Foundation Engineering (IFE), the soil engineer on the sewer project, to evaluate the sewer backfill and to develop a solution IFE conducted additional field investigation (CPT test) at five locations along the sewer alignment to study the subsurface soil conditions

Soil Investigation Findings Backfill material was compacted to 90% level or higher during construction However, potential settlement in the pipe zone may have weakened the backfill zone above the pipe Continued settlement in the backfill zone is likely resulting in pavement distress Poor surface drainage and storm water infiltration increases settlement potential

Recommended Repair Solution Improved Pavement Section: Bottom soil layer compacted to 90% level Three layers of aggregate base/geogrid 4-inch Asphalt concrete City of San Jacinto and the District identified 900-feet of roadway to be repaired District will continue to monitor the pavement for surface depressions Repair Areas Note: Remaining distressed pavement areas will be monitored

Bid Process Five on-call contractors were invited to bid on July 28, 2016 Two bids received on August 11, 2016 Apparent Low bidder, Hemet, Mfg. Co. Inc. Low bid in the amount of $410,796 Contractor has performed similar work for the District

Schedule Board Consideration/Award Sept. 2016 Notice to Proceed Sept. 2016 City Council Meeting (traffic control plan approval) Oct. 2016 Contractor Mobilization Nov. 2016 End of Construction Jan. 2017

Recommendation Acceptance of the lowest responsive bid of Hemet Mfg. Co. Inc. of Hemet, California, for Request of Proposal No. BL-2843 Execution by the General Manager of the District's standard form of contract with Hemet Mfg. Co. Inc. in the amount not to exceed $410,796 Execution by the General Manager of the District's standard form of contract with Inland Foundation Engineering, Inc. for soil testing services in the amount not to exceed $16,905 Additional appropriation of $520,700

Contact Information Joe Mouawad, P.E. Senior Director of Engineering (951) 928-3777 Ext. 4463 Email: mouawadj@emwd.org