Presentation is loading. Please wait.

Presentation is loading. Please wait.

Village of east aurora sycamore street water improvements

Similar presentations


Presentation on theme: "Village of east aurora sycamore street water improvements"— Presentation transcript:

1 Village of east aurora sycamore street water improvements

2 Introductions Clark Patterson Lee Village of East Aurora
26 Mississippi Street, Suite 300 Buffalo, NY Steven R. Tanner, P.E. – Senior Associate, Phone: (716) Kim Vongries, P.E. – Project Engineer, Phone: (716) Village of East Aurora Matt Hoeh – Superintendent, Department of Public Works phone: (716) Bryan Gazda – Village Administrator phone: (716) Introductions

3 Project area Linden Ave. Oakwood Ave. Sycamore St. South St.

4 Project components New 8” Class 52 Ductile Iron Pipe and Fittings
New water services to the Right-of-way, including new curb stop and curb box, and connect to existing service lines Services under the road shall be directionally drilled to limit street disturbance Install new fire hydrants and removal of old Removal of 5 trees as recommended by independent arborist hired by the village Tunneling under remaining trees along the alignment Some areas of sidewalk to be replaced Driveway aprons to be replaced if impacted

5 Project schedule Advertise to bid: second week of February
Bid opening: March 10, 2017 Village award of bid: March 20, 2017 Estimated start of construction: Mid-April, 2017 Project substantially complete: end of July, 2017 Restoration complete and ready for final payment: end of august, 2017

6 During construction Driveway access may be limited from time to time - contractor will be required to notify residents in advance. There will be dust. Contractor is required to minimize this, however, construction work is dirty work. Water should only be shut down when the contractor switches the service from the old main to the new main, and notifications will be made. Shut down should last no longer than 4 hours. Accidents do happen. contractor can hit unmarked or incorrectly located services. They will notify residents if home and proceed with repairs.

7 Project drawings

8 Project drawings

9 Project drawings

10 Project drawings

11 Project drawings

12 contacts During construction
Clark Patterson Lee Kim Vongries, P.E. – Project Engineer Phone: (716) Steve Tanner, P.E. – Senior Associate Phone: (716) Clerk of the Works: To be Determined Village of East Aurora Matt Hoeh – Superintendent, Department of Public Works phone: (716) Bryan Gazda – Village Administrator phone: (716) contacts During construction

13 Questions?


Download ppt "Village of east aurora sycamore street water improvements"

Similar presentations


Ads by Google