1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.

Similar presentations


Presentation on theme: "1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016."— Presentation transcript:

1 1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016

2 2 | emwd.org Background Central Moreno Valley Storage Deficiency – 2060 Pressure Zone – Existing Nominal Storage – 0.5 MG – Ultimate Storage Need – 3.0 MG Proposed Project – Preliminary Design – Property Acquisition Tank Site and Pipeline Easements – Hydraulic Analysis Identify existing pipeline bottlenecks Identify possible upgrades at booster stations – Schedule Complete Preliminary Design by November, 2016 Project Vicinity Proposed Tank

3 3 | emwd.org Conceptual Layout

4 4 | emwd.org Engineering Services – Scope of Work Data Collection and Analysis Hydraulic Evaluation – Piping Alternatives – Pump Stations Efficiency/Energy Costs Emergency Genset Options Storage Site Evaluation Investigations – Geotechnical / Survey – Corrosion Preliminary Design – Tank Configuration & Materials – Site Drainage – Preliminary Design Report – Cost Estimate and Schedule Existing North Country Booster Station

5 5 | emwd.org Selection Process Received Proposals – January 14, 2016 Selection Panel – Operations, Field Engineering, and Engineering Evaluation Criteria – Past Performance and qualifications of the proposed team – Familiarity with project and capacity to handle all aspects of the work – Ability to commence work immediately and complete project within proposed time frame – Proposed project approach, scope, manner, and thoroughness in which it is presented in the proposal – Firm’s experience, staff availability, stability, financial responsibility, and past performance on similar project – Fee Proposal

6 6 | emwd.org Consultant Selection Summary Notes: (1) Albert A. Webb Associates negotiated scope & fee including optional tasks. (2) Best and Final Fee Proposal. Subconsultants to Albert A. Webb Associates: – Converse Consultants of Temecula, CA– Geotechnical services – Design West Engineering of San Bernardino, CA – Electrical engineering services – Inland Aerial Surveys of Riverside, CA – Photogrammetry services – RF Yeager Engineering of Lakeside, CA – Corrosion engineering services

7 7 | emwd.org Recommendation Approve and Authorize an Agreement with Albert A. Webb Associates of Riverside, California ($160,765) for Preliminary Design of the MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Project, and Appropriation in the Amount of $290,200. Authorize staff to initiate property acquisition negotiation and open escrow. Existing Casey Court Tank

8 8 | emwd.org Schedule Board Award – April 6, 2016 Kick-off Meeting – April 2016 Completion of Preliminary Design – November 2016

9 9 | emwd.org Contact Information Joe Mouawad Senior Director of Engineering Phone Number (951) 928-3777 Ext. 4463 Email: mouawadj@emwd.org