1 Delta Water Supply Project
September 18, 2007 Agenda Item 8.02

2 Presentation Summary Acceptance of the Delta Water Supply Project Cost Study Award of the Staged Design-Build Contract with Camp Dresser & McKee (CDM Constructors, Inc.) Declaration of Intent to Reimburse Expenditures from Future Bond Proceeds

3 Project Location Diversion Site Treatment Plant Site

4 Background Project Information
Delta Water Supply Project New Supplemental Surface Water Supply Source Intake and Pump Station Raw Water Pipeline Water Treatment Plant Treated Water Pipelines Project approved in November 2005 Led by Council Project Committee Provides project oversight Meets monthly and also serves as Professional Services Selection Committee

5 Finance & Accounting

6 Background Financial Activities
Cost Study August 2006 – Contract approved with HDR to conduct Cost Study Cost Study is one of a number of financial activities currently underway Drawdown Schedule Surface Water Split Analysis Cal Water Agreement Rate and Fee Study Long-Term Debt Issuance Short Term Financing

7 Financial Activities Schedule
Draft Cost Study Jul. 2007 Draft Surface Water Split Analysis Sep. 2007 Secure Line of Credit Nov. 2007 Conditional Agreement with Cal Water Nov. 2007 Public Utilities Commission Review (Cal Water) Nov – Mar. 2008 Approve Intake Construction Contract Apr. 2008 Proposition 218 and Public Outreach Mar – Apr. 2008

8 Financial Activities Schedule (continued)
Start Intake Construction May 2008 Adopt Rates & Fees (Public Hearing) Jun. 2008 Issue Bonds Aug. 2008 Approve Design/Build Construction Contract Sep. 2008 Start Construction of Plant and Pipeline Oct. 2008

9 Cost Study Deliverables: Capital Cost Estimate
Intake, Plant and Pipelines Baseline Operations & Maintenance Cost Membrane and Conventional Options Membrane Option Most Applicable

10 Cost Study Intake & Pump Station
Design & Engineering Services $ 2,200,000 Third Party Construction Management $ 1,243,500 Construction $ 12,434,969 15% $ 1,865,245 Annual 5% $ 1,072,516 Subtotal (Intake & Pump Station) $ 18,816,230

11 Cost Study Raw & Treated Water Pipelines
Design-Build Engineering Fees $ 5,955,157 Engineering Services During Construction $ 1,488,789 Construction $ 64,729,966 15% $ 9,709,495 Annual 5% $ 5,582,960 Subtotal (Pipelines) $ 87,466,367

12 Cost Study Water Treatment Plant
Design-Build Engineering Fees $ 8,480,660 Engineering Services During Construction $ 2,826,887 Construction $ 56,537,734 10% $ 5,653,773 Annual 5% $ 4,664,363 Subtotal (Water Treatment Plant) $ 78,163,417

13 Cost Study Capital Cost Summary
Intake and Pump Station $ 18,816,230 Pipelines $ 87,466,367 Water Treatment Plant $ 78,163,417 Total Design & Construction $184,446,014

14 Cost Study Other Project Costs
$10.5 million expended to date $4.8 million in land acquisition $4.4 million environmental / professional services Additional $7.6 million anticipated in indirect project costs Project Administration Permitting Acquisition & Right of Way Other Services

15 Cost Study Operations & Maintenance Cost
Operations and Maintenance (Annual Estimate): Intake $ 260,601 Pipelines $ ,841 Water Treatment Plant $2,482,388 Total: $2,778,830 Assumes 16 full-time staff

16 Engineering & Construction

17 Treatment Plant & Pipelines
March 2007 – Request for Proposals issued for Design-Build Services Water treatment plant and pipelines Two proposals received Camp Dresser & McKee (CDM Constructors, Inc.) Black & Veatch Interviews held May 2007 Professional Services Selection Committee recommended staff to negotiate with CDM Constructors, Inc.

18 Design-Build Contract Treatment Plant & Pipelines
Stage 1 Facility design to approximately 65 percent Stage 2 lump sum construction cost Stage 2 Project construction Off Ramp Services (Optional) (A) = Complete design and prepare bid packages (B) = (A) + Provide Engineering Services during construction

19 Design-Build Contract Scope of Work
Water Treatment Process Selection Pipeline Alignment Evaluation Field Data Collection Water Treatability Testing Basis of Design Reports Value Engineering / Constructability Permitting Stage 1 Design Packages Stage 2 Proposal Optional Tasks (Allowances) Site Study (Optional Uses for City Property) Constructability Review

20 Design-Build Contract Summary of Fees
Stage 1 Services* Stage 2 Design and Engineering Services Stage 2 Construction Management Off-Ramp Services (Design to 100%) (Design Services During Construction) $6,279,961 5.5% of Stage 2 price, but not lower than $8,822,785 3.7% of Stage 2 price, but not lower than $5,901,783 $4,668,150 $5,118,057 *This is the only financial obligation at this time.

21 Design-Build Contract Summary of Terms
Award of the Design-Build Contract obligates us only through Stage 1 (Stage 2 Proposal) Stage 2 and Off-Ramp Fees are negotiable prior to amending the Contract Insurance and Bonding is defined for all Stages

22 Reimbursement Resolution

23 Reimbursement Resolution Summary
Debt issuance not scheduled until 2008 MUD continues to use enterprise fund revenues to fund project costs Provides ability to reimburse fund balance from future bond proceeds Recommended by Bond Counsel Reimbursement resolution does NOT obligate the City to spend funds or incur debt

24 Reimbursement Resolution Schedule of Costs
$5.7 million expended to date (non land acquisition related costs) $4.5 million in indirect costs anticipated during Fiscal Year 07-08 $6.3 million for Staged Design-Build Contract with CDM $19 million for Intake and Pump Station Facility

25 Recommendation (As Recommended by the Council Project Committee on 9/6/2007:)
Adopt a Resolution: Accepting the Delta Water Supply Project Cost Study Approving and authorizing the City Manager to execute a Staged Design-Build contract in the amount of $6,279,961 with CDM Constructors, Inc. for the preliminary design and development of a fixed price proposal for the water treatment plant and pipeline components of the Delta Water Supply Project Declaring the City’s intent to reimburse certain expenditures in an amount not to exceed $36 million from future bond proceeds for the Delta Water Supply Project