1 City of Woburn – City Council Committee on Water Update on Water and Sewer System Improvements Projects City Council ChambersJune 1, 2009 7:00 pm City Council Chambers – June 1, 2009 7:00 pm

2 Meeting Outline u Water Treatment Plant Addition u Rag Rock Tank Replacement u SRF Funding u Year 4 Cleaning and Lining u Lowell St. and Sendick Rd. 12” main u Beach St. 12” Main u Commercial Water Meter program u Private Source Removal program u Area 3 Design u Arlington Road u Horn Pond Intrerceptor

3 Rag Rock Mountain Tank Update u Contaminated soils cleanup completion ~ 6/4 u New Tank u MEPA Approval ~ 5/8 u Advertised for bids ~ 5/14 u Bids due ~ 6/11 u Estimated award ~ 7/1 u Complete construction ~ December 2010 u Article 97 Conversion

4 Horn Pond Water Treatment Plant Update u Rec’d final DEP comments on 3/31 u Final submittal (with revisions) to DEP on 5/8 u Advertised for contractor qualifications (RFQ) on 4/8 u Received Statements of Qualifications (SOQs) on 4/29 u City has prequalified: u 10 General Contractors u Multiple subcontractors in each of the following “trades” – masonry, miscellaneous metal, roofing & flashing, glazing, field painting, plumbing, HVAC, and electrical

5 Horn Pond Water Treatment Plant Update (continued) u Plans/specifications available ~ June 10 u Receive filed subbids (“trades”) ~ July 8 u Receive general bids ~ July 29 u Award contract ~ September 15 u Complete construction ~ March 2011

6 Project Funding Update u Governor Patrick announcement May 1 u DEP has confirmed City’s water project eligible for stimulus funding

7 Year 4 Cleaning and Lining Contract  Bid Opening June 11, 2009 – One Year Construction u Nashua St. u Porter St. u Warren Rd. u Lawrence St. u Sturgis St. u Beacon St. u Evans St. u Reed St. u Monroe St. u Morse St. u Foster St. u Water St

8 Lowell St. and Sendick Rd. 12” Main Bid Opening June 11, 2009 One Year Construction Period Project extends 4,600 feet from Wyman Street to Sendick Rd. to Route 95 New 12” water main will replace an existing unlined 6” cast iron pipe The project will provide a loop to the northerly side of Route 95 at Pearl st.

9 Beach Street 12” Main Bid Opening June 18, 2009 One Year Construction Period Project extends 2,800 feet from Salem Street to Mishawum Rd. The new 12” water main will replace an existing unlined 6” cast iron pipe The project will provide a support loop to the Kennedy Jr. High School

10 Jefferson Ave. 8” Water Main  Bid Opening June 25, 2009  One year construction contract  The project will replace approximately 1,000 feet of unlined cast iron pipe with new 8” ductile iron pipe.  The project will be constructed between Prospect St. and High Street  The project includes drainage work for Prospect Street.

11

12 Private Inflow Removal u Bids opened February 26, 2009 u 70 of 125 right of entry forms returned u 24 property visits by Contractor/DPW u Building Inspection Letter – Summer 2009 u Funding – December 2008 Sewer Bank Appropriation

13 Area #3 u 75% Design Complete u Construction Fall 2009 u Cost Estimate $1,500,000 u $1,020,000 - December 2008 Sewer Bank Appropriation u Funding Shortfall - $530,000 (Construction & Construction Services) u Post Construction Flow Evaluation - $15,000 (September 2010)

14 Arlington Road u Infiltration Investigation Complete u Report to DEP on March 31, 2009 u Smoke/Dye Testing – Summer 2009 u Rehabilitation Design – Fall 2009 u Construction – Winter 2009/2010 u Funding Shortfall - $540,000 (Construction/Construction Services)

15 Horn Pond Interceptor u Television Inspection of two remaining segments – Summer 2009 u Funding - December 2008 Sewer Bank Appropriation u Potential Interceptor Repairs

16 Funding Summary u Area #3 - $545,000 u Arlington Road - $540,000 u Horn Pond Interceptor - $200,000 u MWRA Phase 6 Funding ($685,500) – Application Deadline July 15, 2009 u Potential MWRA Phase 7 Funding ($1,040,000) u MWRA MMDT Interest


Download ppt "City of Woburn – City Council Committee on Water Update on Water and Sewer System Improvements Projects City Council ChambersJune 1, 2009 7:00 pm City."