David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction.

Slides:



Advertisements
Similar presentations
Jose Chan FAC- Undulator System Installation & Assembly 10/30/07 1 Undulator System Installation & Assembly Schedule Jose.
Advertisements

Workshop Issues Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center Diagnostics.
Jim Turner LCLS Accelerator Readiness Review December 2, LCLS Safety Systems Acceptance J. Turner, for the LCLS and SLAC.
Heinz-Dieter Nuhn, SLAC / LCLS Undulator Checkout and Startup Plans November 12, Undulator Checkout and Startup Plans Heinz-Dieter.
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project LCLS NEH ARR John Arthur LCLS Experimental Facilities Division August 11, 2009 Welcome.
Hal Tompkins FEE/FEL June 16, FEE/FEL Commissioning Overview By Hal Tompkins Photon Beam Systems Deputy.
1 John Arthur 1 FEH Status CXI Review June 3, 2009 FEH Layout, Status John Arthur – LCLS Expt’l Facilities Div June 3, 2009.
Jess Albino Session 5 Conventional November 11, Facility Advisory Committee LINAC Coherent Light Source Project.
FAC 4/20/06 D. Schultz 1 The SAD and ARR for Commissioning The Status of the SAD Being written as a part of the SLAC Linac SAD The Status of the ARR Design.
David Schultz Accelerator Nov. 12, ‘08 SLAC National Accelerator Laboratory 1 Accelerator Readiness ARR scheduled for Dec.
1 Roger Erickson 1 Coordination with Accelerator Systems NEH Accelerator Readiness Review Coordination with Accelerator Systems.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Jose Chan and Kathleen Ratcliffe FAC Review- LTU/DUMP installation Status & 6/16/08 1 Linac Installation Status, Schedule.
John N. Galayda LCLS Facility Advisory November 11, LCLS Update November 11, 2008 Construction Status LCLS Instruments.
Kathleen Ratcliffe LTU Installation October 30, LTU Installation Coordination Kathleen Ratcliffe.
John Arthur X-ray November 11, 2008 SLAC National Accelerator Laboratory 1 X-ray Overview LCLS Directorate structure.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project The Instrument Readiness Review Process John Arthur LCLS Experimental Facilities Division.
Richard M. Boyce FAC April 16, LCLS Installation & Planning Integration process – IMT 2007 Installation Planning BTH.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
David Saenz CF Oct 30, CF MEP Commissioning.
LCLS Transition to Science DOE Status Review of the LUSI MIE Project NEH status and XFD operations Hal Tompkins, John Arthur LCLS Experimental Facilities.
Richard M. Boyce FAC October 29-31, Installation Planning Integration process – IMT update Installation Planning &
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
John N. Galayda LCLS Facility Advisory 29 October 2007 Linac Coherent Light Source Overview 29 October 2007  Project.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
Richard M. Bionta X-Ray Transport, Diagnostic, & Commissioning September 22, 2004 UCRL-PRES Two Problems... LCLS Diagnostics.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Opening Comments and Charge 19 January 2004 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear.
John Arthur X-ray April 20, 2006 X-Ray Beamline and Experiment Layout John Arthur LCLS Photon Systems Manager.
Hal Tompkins Photon October 30, LCLS Photon Systems Installation and Commissioning Presentation to Facility Advisory.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
John Seeman LCLS December 2, Conduct of LCLS Accelerator Operations John Seeman Assistant Director LCLS Directorate.
David Saenz Readiness for Oct 12, 2006 # Meeting of the LCLS Facilities Advisory Committee LCLS Conventional Facilities.
John N. Galayda LCLS Accelerator Readiness December 2, LCLS Overview December 2, 2008 Project Construction Status.
John N. Galayda DESY October 8, LCLS Commissioning in 2008 J. Galayda, for The LCLS Construction/Commissioning.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
Experimental Facilities Planning
Hal Tompkins – Photon Beam Systems Deputy June 8, 2009
LTU/Undulator Installation Status
Linac Ops Budget Review LCLS Overview / Org Structure / Legacies
e-Beams Systems Update
Electron Beam Systems ETC and Methodology
Project Status Review May 13-15, 2008.
Electron Beam Systems Wrap-up
Conventional Facilities Status
Shutdown Planning & Installation Schedule
E-Beams Systems Manager
LTU/Undulator Installation Status
Hal Tompkins – Photon Beam Systems Deputy May 14, 2009
LCLS Operation in 2009 Roger A. Erickson
Installation Status & Operational Readiness Process
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
CF Scope, Management & Organization
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
LCLS e- Beams Systems Manager
Presentation transcript:

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 1 Undulator Complex Status LCLS Introduction Layout Responsibilities Schedule Undulator Complex Status Outstanding issues

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 2 Linac Coherent Light Source at SLAC Injector (35º) at 2-km point Far Experiment Hall (underground) Near Experiment Hall (underground) New e  Transfer Line (340 m) X-ray Transport Line (200 m) Undulator (130 m) X-Ray Transport/Optics/Diagnostics Existing 1/3 Linac (1 km) (Commissioned in )

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 3 Commissioning responsibilities Beam operations Accelerator Systems Division (John Seeman) Operates the Main Control Room Operations adhere to the Beam Authorization Sheet Schedules maintenance and repair Manages the facilities Commissioning Goals(Paul Emma) LCLS Project Physics group Schedules and organizes commissioning efforts to meet goals. Radiation Safety measurements(Sayed Rokni) Radiation Physics group Performs measurements to confirm shielding efficacy LCLS Project provides funding for commissioning activities

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 4 Re-establish e - to SL2 LTU/Und Comm. First Light in FEE First Light in FEH NEH Ops & Commissioning J J F F M M A A M M J J J J A A S S D D J J F F A A M M J J J J A A S S O O N N D D J J F F M M A A M M J J J J ON A Down PPS Linac/BC2 Commissioning FEL/FEE Commissioning Nov. 3, 2008 Install Undulators D LCLS Installation and Commissioning Time-Line LTU/Und Install PEP-II run ends FEE/NEH Install CD-4 (7/31/2010) X-Rays in NEH now D Down? FEH Hutch BO M

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 5 SAD and ASE SLAC-I _lafase_text_r001 SLAC-I _lclsundcomplexsad_text_r000

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 6 LCLS beam limits from the ASE 1680 W is 1 nC at 14 GeV at 120 Hz, Typical 2009 commissioning will be at ~100 W These are the power levels used in shielding design calculations.

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 7 LCLS New Construction Far Exp. Hall Near Exp. Hall Undulator Complex SLAC Linac Front End Enclosure (FEE) Undulator Hall Photon Systems e - Beam Dump Beam Transport Hall

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 8 Beam Transport Hall

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 9 Undulator Hall

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 10 Undulator Magnet Installed

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 11 Electron Beam Dump Area

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 12 Undulator Complex Status Installation complete Vacuum, Magnets, Diagnostics, Safety Systems Final alignment this week. Systems’ checkout Controls and Physics checkout is underway. Safety Systems Initial Acceptance Tests PPS, BCS Initial Acceptance Tests this week.

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 13 Outstanding Issues ( ) Fire safety check-off Fire systems commissioning through 11/26 Final shielding Final elements to be installed this week Punch list closeout (a copy is on the web) Some items need pre-start completion Preparedness document sign-off Final signatures are last-minute, inc. ASD Beam Authorization Sheet (BAS) sign-off (ASD, RP) is the final link before operations

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 14 LCLS New Construction Far Exp. Hall Near Exp. Hall SLAC Linac Front End Enclosure (FEE) Undulator Hall Beam Transport Hall e - Beam Dump Photon stoppers will be locked in until photon systems operations are authorized.

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 15 Dump-FEE safety system layout Photon stoppers

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 16 B4C Stoppers must be able to withstand the allowed beam power (x-rays) indefinitely. B4C is placed on stoppers face to withstand the FEL beam Damage threshold of B4C calculated to have a safety factor of ~10. Have a test apparatus to confirm viability, with a B4C sample placed in the photon beam, for testing at increasing beam power density. Detailed testing plan needed prior to installing Undulator magnets.

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 17 Summary The SAD and ASE for LCLS Undulator Complex commissioning are signed. The Undulator Complex technical systems are installed and are being checked. Safety systems are complete this week (some shielding installation and the IAT). Completion will be verified through the BAS. Accelerator Operations and maintenance will be done by experienced SLAC groups. Plans are in place for the beam commissioning program.

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 18 end

David Schultz Accelerator Readiness Dec. 2, ‘08 SLAC National Accelerator Laboratory 19 FEE e - Beam Dump (DLH) Plan view Elevation view Main dump NEH PEPII ring road Hutch1Hutch2 Main dump line Layout of DLH, FEE, and NEH BYDs – DC magnets Wall 2Wall1