Jess Albino Session 5 Conventional November 11, 2008 1 Facility Advisory Committee LINAC Coherent Light Source Project.

Similar presentations


Presentation on theme: "Jess Albino Session 5 Conventional November 11, 2008 1 Facility Advisory Committee LINAC Coherent Light Source Project."— Presentation transcript:

1 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 1 Facility Advisory Committee LINAC Coherent Light Source Project Conventional Facilities Overview and Status

2 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 2 Conventional Facilities Turner contract close-out and claims Close out process Contract requirements catalogued and monitored for each trade contract. Weekly status meeting. Progress reported at weekly Owner meeting. Construction Claim Settlement terms negotiated. Terms under review by Turner and SLAC.

3 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 3 Previous Review Lessons Learned Initial report on Safety. Clear Expectations. Double Standards. Consistent Enforcement. Similar report for Pre-construction, Bid Phase, Construction and Close-out to follow. Early participation by Construction consultant. Reliable Engineer’s Estimate. Proper selection of field staff. Knowledge of project history.

4 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 4 Previous Review Walk-downs (acceptance Testing) Commissioning Plan specified. Commissioning Agent contract. Commissioning Reports. SLAC participation. Inspections/Punch Lists

5 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 5 Previous Review Punch Lists Initiated by CM/GC. Input from stakeholders. Maintained, managed by Conventional Facilities Executed by Turner and trade contractors. Verified and closed by Conventional Facilities. Status BTH – EBD CUP – NEH XTOD - FEH

6 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 6 Previous Review As-built and red-lines Trade contractors maintaining red lines. Red lines required to close-out contract. Turner to consolidate all red lines from trades. Turner to submit consolidated red lines to SLAC. SLAC to process red lines into single set of as-built markup. SLAC to forward to Jacobs for processing. Jacobs to prepare As-builts (estimate for delivery – April 2009).

7 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 7 Previous Review Warranties and Spares Warranty and repair periods defined in Certificate of Substantial Completion. Spares are to be inventoried and forwarded to SLAC stores. Construction debris will be removed from the site and recycled.

8 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 8 Previous Review Construction clean-up Demobilization to be completed by end of calendar year. Site plan under preparation Identify temporary facilities and/or utilities to remain. Identify final condition of the project site. Acceptance criteria defined. Construction site returned to Laboratory.

9 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 9 Previous Review Sealing and Painting All paved surfaces finished. All painting completed. Sealing remains in the access tunnel segment. Floor sealing in Beam Dump area removed from Turner contract due to installation work.

10 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 10 Previous Review Construction Power Construction power provided by Laboratory. All downstream equipment (contractor-owned) to be removed. Limited power available within Access Tunnel. Conduits and cables will be removed, not abandoned.

11 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 11 Previous Review Transfer of Custody (of equipment) completed forms Project procedure developed for transition to operations phase. Chain of Custody defined for all key systems. Turner to Conventional Facilities. Conventional Facilities to Installation Group Conventional Facilities to Laboratory.

12 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 12 TCCo —> LCLS CF Status e-beam System (thru e–DUMP) Install. compl. Dwgs of Record Commiss. Test reports Final Punch List Final accepta nceCF Recip. Building/Housing shop dwgsn/a15-Nov-0830-Nov-08Saenz AC Pwr√shop dwgs√15-Nov-0830-Nov-08Sevilla Ch. W.√shop dwgs√15-Nov-0830-Nov-08Baclit/Sevilla Hot W.√shop dwgs√15-Nov-0830-Nov-08Baclit/Sevilla LCW√shop dwgs√15-Nov-0830-Nov-08Baclit/Sevilla HVAC√shop dwgs√15-Nov-0830-Nov-08Saenz C. Air√shop dwgs√15-Nov-0830-Nov-08Sevilla Fire System s√shop dwgs31-Oct-0815-Nov-0830-Nov-08Saenz Sump30-Novshop dwgs√15-Nov-0830-Nov-08Baclit/Sevilla Radion/a Phones√shop dwgsn/a15-Nov-0830-Nov-08Saenz Magnetsn/a Vacuumn/a Mag. Power spln/a Controlsn/a

13 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 13 Previous Review Roll-off (de-staffing) Plan Project transition to Operations includes new organization structure. Turner’s roll-off agreed to by Conventional Facilities. Trade contractors re-assigning workers, returning to halls.

14 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 14 Substantial Completion Dates Front End Enclosure Nov. 08 Central Utility Plant Nov. 08 Undulator Hall Nov. 08 Near Experimental Hall Nov. 08 Beam Dump Nov. 08 Beam Transfer Nov. 08 Xray/Diagnostics Nov. 08 Far Experimental Hall Nov. 08

15 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 15 Turner Construction Contract

16 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 16 BTH Headhouse looking west

17 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 17 BTH Headhouse looking west

18 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 18 BTH looking east

19 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 19

20 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 20

21 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 21

22 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 22 Finishing the Final Floor Slab in X-ray Tunnel

23 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 23 Installing re-bar in the Far Experimental Hall

24 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 24

25 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 25 Backfill operation over Beam Dump and FEE

26 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 26

27 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 27 Next 6 Months CONSTRUCTION Complete Site Restoration Complete Punch Lists De-mobilize Construction Site Close-out Trade Contracts Close-out Turner Contract (before March 2009) Initiate FEH Hutch build-out Initiate office space plan

28 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 28 Summary Substantial Completion for last segment November 2008 Interface with DOE, SLAC, Tech. Systems, CM/GC to transfer facility to Laboratory Last 10 months safety performance very good.

29 Jess Albino Session 5 Conventional FacilitiesAlbino@slac.stanford.edu November 11, 2008 29 End of presentation