John N. Galayda LCLS Facility Advisory November 11, 2008 1 LCLS Update November 11, 2008 Construction Status LCLS Instruments.

Similar presentations


Presentation on theme: "John N. Galayda LCLS Facility Advisory November 11, 2008 1 LCLS Update November 11, 2008 Construction Status LCLS Instruments."— Presentation transcript:

1 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 1 LCLS Update November 11, 2008 Construction Status LCLS Instruments Charge to the Committee

2 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 2 Construction(TEC) >87% complete

3 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 3 LCLS Injector 100% Complete LCLS Linac >96% Complete Commissioning Complete 3/2008 Commissioning Complete 9/2007 Undulator >97% complete Beam to the Dump by 12/19

4 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 4 Laser Performance Reliability has been excellent: 99% availability Laser Performance Reliability has been excellent: 99% availability  FWHM  6.5 ps Oscillator Cathode spot size control Diode Pump Laser

5 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 5 dualfeed RF Gun Successful Cathode Change

6 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 6 Beam Transport Hall Near Completion

7 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 7 ANL Work 98% Complete Quadrupole Vacuum Chamber OK- EVAC flanges making up, with some effort Undulator Segment Temperature change induces mechanical creep somewhere, resulting in K change RF Cavity BPM- Difficulties encountered, OK now Girder

8 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 8 Undulator Hall First electrons 12/2008 Install Undulators 3/2009 Challenge: begin FEL commissioning w/XR diagnostics 3/2009

9 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 9 Linac-to-Undulator (227m) X-ray Transport (200m) Undulator Hall (175m) Beam Dump (40M) Front End (29m) Near Expt’l. Hall Near Experimental Hall 1.9 Conventional Facilities >87% complete Turner Construction Co. >95% complete Far Expt’l. Hall 64.6 m 14 m

10 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 10 Near Experiment Hall Hutch 3

11 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 11 Far Experimental Hall south rib Installing re-bar in the Far Experimental Hall Far Experimental Hall Structural Shell

12 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 12 Solid Attenuator Gas Attenuator Slit Start of Experimental Hutches 5 mm collimator Muon Shield Hard X-Ray Offset mirror system Pulse Energy Thermal Detector Gas Detector e-e- Direct Imager Hard x-ray Monochromator (K Spectrometer) Soft X-Ray Offset mirror system LLNL WBS 1.5 is >80% complete Front end X-ray optics being assembled All mirrors delivered; mirror figures meet spec Most diagnostics under assembly at LLNL X-Ray Transport/Optics/Diagnostics

13 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 13 Re-establish e  to SL2 LTU/UndComm. First Light in FEE First Light in FEH NEH Ops & Commissioning JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A 2008 2009 2010 2008 2009 2010 Down PPS Linac/BC2 Commissioning FEL/FEECommissioning Nov. 3, 2008 Install Undulators M M D D LCLS Installation and Commissioning Time-Line LTU/Und Install PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump CD-4 (7/31/2010) X-Rays in NEH now D D Down? FEH Hutch BO

14 John Galayda galayda@slac.stanford.edu LCLS Facility Advisory Committee November 11, 2008 14 Atomic Physics (LCLS) Atomic Molecular and Optical Physics 8/2009 Plasma and Warm Dense Matter Materials/matter under Extreme Conditions Nanoscale Dynamics Coherent scattering at the in Condensed matter (LUSI) nanoscale (XCS) 3/2012 Structural Studies on Single Nano-particle and single Particles and Biomolecules molecule (non-periodic) (LUSI) imaging (CXI) 4/2011 Femtochemistry Pump/probe diffraction (LUSI) dynamics (XPP) 12/2010 Soft X-Ray Imaging & Spectroscopy (SXR) 12/2009 FEL Science/Technology Program developed by international team of scientists working with accelerator and laser physics communities SLAC Report 611 “ First Experiments” Realized within Concepts LCLS and LUSI Science with LCLS 4/2010 7/2011 ? 2010 ?

15 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 15 Envisioned Placement of Experiments LUSI LCLS DESY Hamburg-LBNL SLAC LBNL-LLNL SLAC-UK

16 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 16 Find out what will be Schematic of AMO Instrument Build/buy and assemble – Jul-Dec 2008 Assembly & Testing – Feb-Jun 2009 Ready for first light – Jul 2009 July 2010

17 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 17 Commissioning Status See Paul Emma’s presentation Commissioning has gone beautifully Still a lot to learn about the undulator system but The beam at end of linac is in excellent shape Linac availability is quite good already Well-positioned to provide good performance in early operations next summer

18 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 18 AMO Experiment Proposals for August 2009 Run 28 Proposals >200 Individual Signatories (82 from US) Proposal Review Panel will meet 2-Dec-08 Selections by end of December Scheduling February-March for August run

19 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 19 PROJECT SAFETY EXPERIENCE Through October 2008 Total Project Hours 2,045 M Hours worked SubContractors 579 K Hours worked DART Rate 3.1 (9 Incidents) TRC Rate 4.1 (3 Incidents) LCLS Collaboration 1,466 K Hours worked DART Rate 0.27 (2 Incidents) DART Rate Injury rates based on 200 K hours (100 man years) of effort. DOE/SC Goal is a Reportable Case (TRC) rate of < 0.25 and a Days Away, Restricted, or Transferred (DART) rate < 0.65 per 100 FTEs.

20 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 20 LCLS Online Information LCLS Web Page http://lcls.slac.stanford.edu/ Instrument Descriptions and Specifications http://lcls.slac.stanford.edu/Instruments.aspx Proposal Submission https://oraweb.slac.stanford.edu/apex/slacprod/f?p=188:1 FAC Website http:// www-ssrl.slac.stanford.edu/lcls/FAC/2008-November/Index.HTML

21 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 21 Charge to FAC Electron Beam: Review/assess commissioning strategy Right balance of priorities? Commissioning to meet Project goals Support the summer’s scientific program Review/assess readiness for ARR Review/assess progress toward controls/applications to support operations Review/assess civil construction closeout Lessons learned discussion

22 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 22 Charge to FAC Photon Beam: Review/assess installation and commissioning strategy approach to achievement of early science with AMO Review/assess LUSI instruments, scope & schedule Physics requirements Engineering design Plans to validate design (reviews, prototypes, etc.) Plans for acquisition (vendor selection and oversight)

23 John N. Galayda LCLS Facility Advisory Committeegalayda@slac.stanford.edu November 11, 2008 23 Presentation Materials Thanks to: SLAC ANL LLNL Jess Albino Geoffrey Pile Richard Bionta John Arthur Bill Berg Donn McMahon Paul Emma Marion White Tom Fornek David Saenz David Schultz End of Presentation


Download ppt "John N. Galayda LCLS Facility Advisory November 11, 2008 1 LCLS Update November 11, 2008 Construction Status LCLS Instruments."