Presentation is loading. Please wait.

Presentation is loading. Please wait.

Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status.

Similar presentations


Presentation on theme: "Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status."— Presentation transcript:

1 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status FAC – November 2008 Schedules Scope of Undulator Controls Module Installation Status Mechanical interface Controls hardware Software infrastructure Utilities UCM EPICS Module Checkout Status

2 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 2 Re-establish e  to SL2 LTU/UndComm. First Light in FEE First Light in FEH NEH Ops & Commissioning JJFFMMAAMMJJJJAASSDDJJFFMMAAMMJJJJAASSOONNDDJJFFMMAAMMJJJJ ON A A 2008 2009 2010 2008 2009 2010 Down PPS Linac/BC2 Commissioning FEL/FEECommissioning Nov. 3, 2008 Install Undulators M M D D LCLS Installation and Commissioning Time-Line LTU/Und Install PEP-II run ends FEE/NEH Install PPS Cert. LTU/Dump CD-4 (7/31/2010) X-Rays in NEH now D D Down? FEH Hutch BO

3 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 3 Schedule Stuart Metcalfe’s Schedule Undulator Controls module must be ready for the commissioning of the LTU-UND complex, ~December 15, 2008

4 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 4 Undulator Controls Module Scope Beam Finder Wire actuation Girder motion, five cams Undulator motion, two translation stages Temperature monitoring, twelve RTDs.

5 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 5 Mechanical Status All 33 girders in place Translation stages fiducialized at CMM lab Translation stages tested for proper motion Undulator roll-in test performed at CMM lab Girder linear pots installation almost complete Linear pot brackets, modification, installation Linear pot girder interface plates, fabrication, installation Linear pot range adjustments Linear pot cap installation

6 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 6 Controls Hardware Status All controls hardware has been delivered by Argonne, and has been installed at SLAC Mini rack VME crate and modules Undulator Controls Module Interface Undulator Module Power and Interlock Interconnect cables Electronics Interface Assembly

7 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 7 Software Infrastructure Status RTEMS RTEMS 4.9 running on the MVME3100 for the last couple of months RTEMS 4.9 running on production EPICS 3.14.10 built again RTEMS 4.9, and running in production All necessary EPICS modules built and running in production

8 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 8 Utilities Status Power 120V AC online Network All IOC’s online Compressed air Installation in progress

9 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 9 UCM App Status Version 1.0 delivered by Argonne in July Running in production Displays integrated into lclshome Argonne currently working on some upgrades

10 Arturo Alarcon Undulator Controls Module Status alarcon@slac.stanford.edu 11/12/2008 SLAC National Accelerator Laboratory 10 Checkout Status Preliminary checkout complete Purpose is to discover basic problems quickly Detailed checkout in progress Procedure Calibration in progress Procedure Physicists checkout plan Physicists checkout plan


Download ppt "Arturo Alarcon Undulator Controls Module Status 11/12/2008 SLAC National Accelerator Laboratory 1 Undulator Controls Module Status."

Similar presentations


Ads by Google