Module Testing Status Week of 6/14-6/20.

Slides:



Advertisements
Similar presentations
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 Faulty Channel Sources (TOB) Fault Sources (excluding cable breaks and CMN)  Hybrid-0.004%
Advertisements

1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
WEEK 1 You have 10 seconds to name…
Gantry meeting September 2003 Lenny Spiegel, FNAL 1 FNAL Bonding Statistics are shown for the last 17 modules (mini-production). Wire bonding has been.
PHL 323 Week 1 DQ 2 Are so-called bad apples the primary cause of ethical problems in organizations? Why or why not? To purchase this material click below.
PHL 323 Week 3 DQ 1 Why should managers practice the ethical behavior they expect from subordinates? To purchase this material click below link
PHL 323 Week 3 DQ 3 How should values and behavior at personal and professional levels differ, and how should they be similar? To purchase this material.
UCSB Hybrid Bonding & Testing
Hybrid & Module Testing Status
Update of US Testing Status
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Vienna Module Production
FNAL Module Testing Status
Module Production Status in Florence
On behalf of the US TOB testing group
TEC Module Production Overview
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
UCSB Qualification Module Grading
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Encapsulation Studies
Module Testing in Florence Carlo Civinini INFN-Florence
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
A. Kaminskiy, CMS Tracker week , Apr 2004
FNAL Hybrid Testing Status
Isolated Bad-CAC Strip at UCSB
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Bonding Since our last report we have built and bonded an additional 10 TOB 4-chip modules 3 RMT pitch adapters 7 Planar pitch adapters By adjusting.
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Presentation transcript:

Module Testing Status Week of 6/14-6/20

FNAL ARCS Testing Status Weekly Cumulative   A B F % A or B L12pu 12 0.00% L12pd L12su L12sd L34p 217 2 99.1% L56p 45 566 1 3 99.47% R5N R5S R6 R7 Total 795 5 99.38%

FNAL ARCS Testing Failures This Week (8459-8503) 16 PHL+ (!!!) - module 8499 - 7, module 8501 - 4 and module 8502 – 3 pinholes – bonding faults? 7 SHT Cumulative (7702-8503) 3 grade “B” (mishandling; missing bonds on p/a and 6 phls and shorts on mod 8417)) 2 grade “F” mishandling 1 grade “F” (7970) - breakdown current behavior @430V New grade F – (8284) problem with chip #2 (every 8th channel is identified as PHL-) High current 8289

FNAL ARCS Testing Results 803 Total Tested 795 Grade A 3 Grade B 5 Grade F This week: 39 of 34560 channels bad (0.11%)