Hybrid & Module Testing Status

Similar presentations


Presentation on theme: "Hybrid & Module Testing Status"— Presentation transcript:

1 Hybrid & Module Testing Status
Week of 5/9-5/15

2 UCSB Hybrid Testing Status
Weekly Cumulative Pass Fail % Pass L12pd 0.00% L34p 369 6 98.40% L56p 37 1 424 4 99.07% R5N 75 3 96.15% R5S 17 108 100.00% R6 9 97 97.00% R7 Total 63 2 1073 16 98.53%

3 UCSB Hybrid Testing Failures
This Week 1 with shorts in PA Lithography errors-fixable 1 with complete failure Cumulative 2 with Shorts in PA 1 Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds Repairable 6 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 2 with unknown failure

4 UCSB Hybrid Testing Issues
Need to finish validation of new software Bruno contacted about bugs/features

5 UCSB ARCS Testing Status
Weekly Cumulative A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 34 120 1 99.18% L56p 10 340 3 99.13% R5N 22 60 98.39% R5S 21 38 100.00% R6 6 94 R7 Total 93 652 5 99.24%

6 UCSB LT Testing Status Weekly Cumulative Pass Fail % Pass L12pu 0.00%
Pass Fail % Pass L12pu 0.00% L12pd L12su L12sd L34p 17 101 100.00% L56p 18 336 R5N 4 44 R5S 36 R6 12 100 R7 Total 87 617