1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8511702084070247 L12pd0002084070247.

Similar presentations


Presentation on theme: "1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8511702084070247 L12pd0002084070247."— Presentation transcript:

1 1 UCSB Module Assembly Week of 5/16-5/20

2 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu8511702084070247 L12pd0002084070247 L12su0002084070249 L12sd0002084070249 L34pu85117020840768/60~1002 L56p0144015743541~1002 R5N103222pr248 pr080 R5S65022pr248 pr080 R602240106pr0255 R700540173pr0198

3 3 US Module Assembly Weekly Cumulative ABFABF% A or B L12pu0001110100.0% L12pd0000000.00% L12su0000000.00% L12sd0000000.00% L34p1200367130100.00% L56p1421176529998.9% R5N6007320100.00% R5S300721297.2% R63009090100.00% R70000000.00% Total166111378551199.2%

4 4 UCSB Module Assembly Problems Past Week –Minor problem with one glue dispenser. Will test and switch to back-up. Can then modify current one. –200 storage plates assembled. 200 more plates machined, but are waiting to see need before assembling. –Replaced one of out 2 curing pumps with a larger one. Will enable us to cure up to 10 plates at a time.

5 5 Wirebonding This Week –A few TOB modules require up to 10 - 15 rebonds on the PA. Problem seems to come and go. –Bonding has kept up with module assembly.