Hybrid & Module Testing Status

Similar presentations


Presentation on theme: "Hybrid & Module Testing Status"— Presentation transcript:

1 Hybrid & Module Testing Status
Week of 5/2-5/6

2 UCSB Hybrid Testing Status
Weekly Cumulative Pass Fail % Pass L12pd 0.00% L34p 368 5 98.66% L56p 19 385 98.72% R5N 9 1 74 3 96.10% R5S 41 88 96.70% R6 87 98.86% R7 Total 69 4 1002 17 98.62% Failing Hybrids Over-counted

3 UCSB Hybrid Testing Failures
This Week 4 with shorts in PA Lithography errors-fixable Cumulative 7 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds 2 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 2 with unknown failure

4 UCSB Hybrid Testing Issues
Need to finish validation of new software Bruno contacted about bugs/features Need to add automatic upload of data to new software Hybrids with shorts need repairing Once repaired need to keep bookkeeping straight

5 UCSB ARCS Testing Status
Weekly Cumulative A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 85 1 98.86% L56p 54 331 2 99.40% R5N 38 97.50% R5S 17 100.00% R6 20 88 R7 Total 91 560 3 4 99.29%

6 UCSB ARCS Testing Failures
This Week None Fixed 1 module Found the problem with another Fixable, need to ship to FNAL for solder repair Cumulative 1 with >2% Bad Channels Debris on sensor 1 Bad DCU Fixable, soldering problem 1 HV Shorted to CF Frame FIXED!! 2 with >20 mA Bias Current 1 leaky pinhole 1 scratched sensor

7 FNAL ARCS Testing (2005) Weekly Cumulative A B F % A or B L12pu 0.00%
A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p 48 113 1 100.00% L56p 15 217 99.5% R5N R5S R6 R7 Total 63 330 2 99.7%

8 FNAL ARCS Testing (from 12/2004)
Weekly Cumulative A B F % A or B L12pu 11 1 91.6% L12pd 0.00% L12su L12sd L34p 48 209 99.5% L56p 15 241 99.6% R5N R5S R6 R7 Total 63 461 2 3 99.4%

9 FNAL ARCS Testing Failures
This Week ( ) one unexpected pinhole - pulled (mod 8140 # 3) 8 PHL-: 8138 (#92), 8139(#430), 8144(#438), 8146 (#58), 8152(#78), 8153(#645), 8154(#650), 8167(#119) 1 SHT ARCS 8.0 has been installed and is being tested; looks ok so far Cumulative ( ) 2 grade “B” (mishandling; missing bonds on p/a) breakdown current Total of 11 pinholes Cumulative ( ) 2 grade “F” mishandling

10 UCSB LT Testing Status Weekly Cumulative Pass Fail % Pass L12pu 0.00%
Pass Fail % Pass L12pu 0.00% L12pd L12su L12sd L34p 84 100.00% L56p 59 318 R5N 1 40 R5S R6 45 88 R7 Total 105 530

11 FNAL LT Testing Issues Modules – 8100 were tested during May 3-May 10 period. Modules were retested. All modules successfully passed LT with grade A. All runs were performed with 2 CCU6’s. Currently working on configuring 2 CCU25’s (0x14 and 0x11).

12 FNAL LT Testing Status Cumulative Weekly 99.62% 1 266 47 Total 0.00%
47 Total 0.00% R7 R6 00 R5S R5N 100.00% 104 10 L56p 99.33% 9150 37 L34p L12sd L12su 12 L12pd L12pu % Pass fFail Pass Fail Cumulative Weekly