Mountain Avenue West Recharge Basin Project

Slides:



Advertisements
Similar presentations
Orange County Board of County Commissioners Water Conserv II Operations Contract Renewal Utilities Department August 23, 2011 Utilities Department August.
Advertisements

Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
1 PLEASE NOTE: This information was presented during previous Economic Recovery Workshops. Since then, the information has been updated. Please refer to.
Regional Grant Funding Coordination for Implementation of Watershed Management Plans Project Clean Water Summit July 15, 2004 David W. Gibson SDRWQCB
South Orange Coastal Ocean Desalination (SOCOD) Project Dana Point/Doheny Beach, California November 2010 Status.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Everglades Protection Area Tributary Basins Long-Term Plan for Achieving Water Quality Goals Everglades Protection Area Tributary Basins Long-Term Plan.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Implementing the MWD Water Supply Allocation Plan for Sub Agencies Elizabeth Lovsted, PE Sr. Civil Engineer.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Proposed Revisions to the Administrative Code Elizabeth Lovsted, PE Sr. Civil Engineer July 8, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Development of a Comprehensive Modernization Project at Burroughs Middle School Community Meeting January 20, 2016.
Water Booster Station Improvement Study
DEVELOPER WORKSHOP October 17, :00 p.m.
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Update Kelley Gage June 15, 2016.
2015 Urban Water Management Plan Overview
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
December 2016.
Large scale development groundwater balance
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
Santa Ana River Conservation and Conjunctive Use Program- Prop 84 Grant Funding Contract Kelley Gage March 9, 2017.
Kelley Gage Sr. Director, Water Resources Planning April 7, 2016
CHINO BASIN WATERMASTER
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
Utah Water Conservation Forum – 5/12/2017
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
107th & 110th Avenue North Public Utilities Renewal Projects
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Solar Initiative – Next Phase Opportunity
Sustainable Groundwater Management Act
Dave Kuhn Assistant Commissioner
Phase 3 Solar Feasibility Study Findings and Recommendations
Policy Principles for the Allocation of Recycled Water
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Cyclic Storage Agreement with Metropolitan Water District and Rancho California Water District Kelley Gage October 12, 2017.
Santa Ana River Conservation and Conjunctive Use Program Update
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
City-wide LED Street Light Conversion Program
David Salazar, Chief Facilities Executive
Delta Water Supply Project
Salt/Nutrient Management Plans
On-Call Project Management Professional Services
PWO 13 Freeway Well Planning Project
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
California Water Commission
Chino Basin Water Bank Development
Presentation transcript:

Mountain Avenue West Recharge Basin Project Greg Kowalski, P.E. May 3, 2017

Mountain Ave. West Recharge Basin Site Background San Jacinto Valley Enhanced Recharge and Recovery Program (SJVERRP) Groundwater recharge, or “banking” of imported water Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) EMWD’s portion Objective of 6,500 acre-feet per year of groundwater storage Total: 19,500 acre-feet Mountain Ave. / Ramona Expy   Villines Avenue Mountain Ave. West Recharge Basin Site San Jacinto, CA   Esplanade Avenue

Scope of Work Project Coordination Hydrogeological Investigations Meetings and Workshops Hydrogeological Investigations Hydrogeological Drilling Geochemical Analysis Technical Memorandum Survey, Right-of-Way and Utility Research Operations and Safety Pre-Use Operational Control Strategy Safety Pre-Use Analysis Recharge Basin Final Design Electrical Design Corrosion Engineering Noise Evaluation / Mitigation Monitoring Well Design Landscaping / Visual Simulations Coordination with City of San Jacinto Plans and Specifications Bidding Assistance

Landscape Improvements Proposed Right-of-Way to be dedicated to the City of San Jacinto Water Use Efficient Landscaping Public Walking / Jogging Path 8-Foot Wrought Iron Fence Recharge and Conservation Message Boards Tree with Water Use Efficient Landscaping Existing Light Standard Wrought Iron Fence Water Use Efficient Landscaping Dirt Maintenance Road Mulch Esplanade Avenue Recharge Pond Existing Sidewalk Recharge and Conservation Message Boards Meandering Decomposed Granite Perimeter Path Existing Right of Way Proposed Right of Way Conceptual Profile with Berm

Consultant Selection Dudek Key Sub Consultants Competitively Selected for Preliminary Design Effort Successfully Completed Preliminary Design Report Knowledge of SJVERRP Facilities Requirements District’s Annual Contract List for Hydrological Design Similar Project Experience with North Trumble Pond Expansion Key Sub Consultants Cozad and Fox, Inc. of Hemet, California – Surveying Services Moraes Pham and Associates of Carlsbad, California – Electrical Engineering C Below Surface Imaging of Chino, California – Potholing Todd Groundwater of Alameda, California – Hydrogeology BC2 Environmental of Orange, California – Hydrogeological Drilling RF Yeager Engineering of Lakeside, California – Corrosion Engineer Negotiated scope and fee in the amount of $896,926 commensurate with level of effort required.

Schedule Kickoff Meeting Completion of Final Design Bid Award May 2017 Completion of Final Design July 2018 Bid Award September 2018 Anticipated Construction Completion March 2020 (18 Months)

Recommendations Execution by the General Manager, or his designee, of the District’s standard form of contract with Dudek of San Diego, California, for final design of the Mountain Avenue West Recharge Basin Project in the amount of $896,926; and Administrative award and execution by the General Manager, or his designee, of the District’s standard form of necessary contracts and agreements for final design of the Mountain Avenue West Recharge Basin Project. Board appropriated funds for this phase of the project in August 2016.

Contact Information Greg Kowalski, P.E. Senior Civil Engineer (951) 928-3777 Ext. 4466 Email: kowalskg@emwd.org