Memorandum of Understanding with GE Osmonics, Inc

Slides:



Advertisements
Similar presentations
Program Controls Systems & Processes Board of Trustees Workshop October 11, 2005.
Advertisements

LOS ANGELES UNIFIED SCHOOL DISTRICT JOB ORDER CONTRACTING Copyright © 2004 The Gordian Group, Inc. all rights reserved.
Stanislav Roth Preliminary Agreements in Tendering.
Contracting for Laboratory Services Ann Mullin Cleveland US Geological Survey Presented to the Environmental Protection Agency Science Advisory Board April.
Washington Metropolitan Area District Office SBA.
Financial Assistance Workshop Contract versus Grant.
The Department of Procurement & Contracts Purchasing Board Rule Changes effective November 1, 2004.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Public Works Department Presentation to: Consolidation of Services Study Commission, Purchasing Subcommittee September 19, 2005.
1 EASTERN MUNICIPAL WATER DISTRICT Risk Management and Insurance Program Doug Hefley Director of Safety, Risk and Emergency Management June.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Procurement & Strategic Sourcing
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Procurement & Strategic Sourcing
TVRWRF 23 MGD Expansion Disinfection System Conversion
Processes and Procedures for Contracting at UO
Joint Parking Task Force Update Procurement & Strategic Sourcing
Procurement & Strategic Sourcing Commercial Print Services
Pre-Bid/Proposal Meeting
Procurement Policy & Procedures Presented by Office of Purchasing.
Procurement & Strategic Sourcing
Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) Update Kelley Gage June 15, 2016.
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Light Rail Transit Project
Processes and Procedures for Contracting at UO
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Contract Award Procedures
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Contracts & Legally Binding Agreements
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Procurement & Strategic Sourcing Charter Bus Transportation Services
Perris Water Filtration Plant Membrane Upgrade – Phase I
Santa Ana River Conservation and Conjunctive Use Program- Prop 84 Grant Funding Contract Kelley Gage March 9, 2017.
Joint Parking Task Force Update Procurement & Strategic Sourcing
City of Norfolk Office of the Purchasing Agent
College II Tank Interior Recoating Award of Construction Contracts
Procurement & Strategic Sourcing (Law School Media Wall)
Solar Initiative – Next Phase Opportunity
Phase 3 Solar Feasibility Study Findings and Recommendations
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Procurement & Strategic Sourcing
Reach 4 Air Valve Replacements Award of Construction Contracts
Cyclic Storage Agreement with Metropolitan Water District and Rancho California Water District Kelley Gage October 12, 2017.
Santa Ana River Conservation and Conjunctive Use Program Update
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
BYU-IDAHO Contracts, Negotiations & Signing Authority
“How We Do Business”.
Procurement Policy & Procedures Presented by Office of Purchasing.
Architectural Services RFQ
Financial leadership lisd
Delta Water Supply Project
Kids Hope Alliance ORDINANCE E Board Workshop
Texas Woman’s University
Job Order Contracting:
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
CITY PROCUREMENT IN Prepared by Lawsikia J
Presentation transcript:

Memorandum of Understanding with GE Osmonics, Inc Memorandum of Understanding with GE Osmonics, Inc., for Procurement of AquaSel Brine Concentration Equipment Joe Mouawad, P.E. June 29, 2017

Background On May 18, 2016, Board awarded contract to CH2M to prepare construction plans for the AquaSel Demonstration Project and appropriated $290,700. On October 5, 2016, Board awarded contract to GE Water & Process Technologies to prepare specifications and other information needed by design consultant to complete the project and appropriated $213,000. The equipment package will be procured by the District’s selected contractor under a pre-negotiated equipment purchase agreement.

Sole Source Procurement of AquaSel Equipment The AquaSel brine concentration equipment is only available from GE Water & Process Technologies through their subsidiary GE Osmonics, Inc. The AquaSel equipment is in support of the proposed 100-gpm demonstration facility.

Memorandum of Understanding (MOU) MOU establishes scope of supply, delivery schedule, liquidated damages, responsibilities and liabilities, and other terms and conditions. Does not obligate the District to procure the equipment. Price of $1,349,544 has been negotiated with GE Water & Process Technologies, which includes a material discount of $150,000, as well as assistance during construction and start-up. District may assign the MOU and related terms and conditions to a contractor selected by the District through competitive bidding. GE has agreed to incentives to demonstrate their commitment to partner with the District to leverage advanced technologies to enhance potable water yields from existing local resources. MOU has been reviewed and approved by legal counsel.

Recommendation Authorize Execution by the General Manager of a Memorandum of Understanding with GE Water & Process Technologies, subject to non-substantive changes, for the procurement of the AquaSel brine concentration equipment.

Contact Information Joe Mouawad, P.E. Assistant General Manager - Planning, Engineering, and Construction (951) 928-3777 Ext. 4463 Email: mouawadj@emwd.org