1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.

Slides:



Advertisements
Similar presentations
FIRE STATION NUMBER 2 Pre-Proposal Conference & Site Visit RFP FR August 27, 2013.
Advertisements

1 Water and Wastewater System Information. 2 PWCSA Water Purchase Key Points From April 21, 2008 Meeting With PWCSA PWCSA is willing to re-open discussions.
Country Club Creek Trail Preliminary Engineering Report Public Outreach Jessica V. Salinas COA Project Manager December 9, 2014.
TPO CONFIRMATION OR REJECTION OF RECOMMENDED FIRM.
Server Virtualization: Navy Network Operations Centers
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
Agenda August 5, Introduction – Natalie Robottom 2.Background and History – Rob Delaune 3.Present Conceptual Engineering Design Proposed Tasks -
Low-flow Intake Technical Analysis Zaffar Eusuff Ph: (916) Bay-Delta Office California Department of Water Resources.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
Proposed Retail Rate Change Effective January 1, 2008.
INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY.
Time is money. Use yours wisely. Bryan McCabe, PE | Pender County Utilities J. Ray Cox, PE | Highfill Infrastructure Engineering.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
Village of Naples and Hazlitt 1852 Vineyards Sewer Feasibility Study.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
EASTERN MUNICIPAL WATER DISTRICT San Jacinto Groundwater Basin Numerical Flow Model Update Brian Powell Director of Planning March 17,
City Council Meeting Tuesday, October 22, Background March 5, 2013: Marinship 101 to Council May 7, 2013: Council formed Steering Committee to work.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
EASTERN MUNICIPAL WATER DISTRICT Two-Year Agreements for As-Needed Environmental Services 1 Jayne Joy, P.E. Director of Environmental and.
1 Hiring a Program Manager Construction Management Task Force January 2008.
RESIDENTIAL RAINWATER HARVESTING PROJECT ALTITUDE ENGINEERING, INC. PRESENTERS: HAYLIE BREWER, ERICA KIESOW,& BRETT HIGHTOWER DATE: APRIL 28 TH,
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
TVRWRF 23 MGD Expansion Disinfection System Conversion
Water Booster Station Improvement Study
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Electrical Distribution Design Services
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
Management of Placement Area at Bayport Container Terminal (RFQ-147)
PROPOSED MARCH LANE / HOLMAN ASSESSMENT DISTRICT
Voice Radio System Replacement Project
Phase 3 Solar Feasibility Study Findings and Recommendations
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
Cohasset Town Hall Renovation Advisory Committee (THRAC)
Educational Information System Replacement Plan Overview
Architectural Services RFQ
Delta Water Supply Project
Pre-Submittal Meeting As Needed Environmental Services RFQ
White Flint North Entrance Feasibility Study
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016

2 | emwd.org Background Central Moreno Valley Storage Deficiency – 2060 Pressure Zone – Existing Nominal Storage – 0.5 MG – Ultimate Storage Need – 3.0 MG Proposed Project – Preliminary Design – Property Acquisition Tank Site and Pipeline Easements – Hydraulic Analysis Identify existing pipeline bottlenecks Identify possible upgrades at booster stations – Schedule Complete Preliminary Design by November, 2016 Project Vicinity Proposed Tank

3 | emwd.org Conceptual Layout

4 | emwd.org Engineering Services – Scope of Work Data Collection and Analysis Hydraulic Evaluation – Piping Alternatives – Pump Stations Efficiency/Energy Costs Emergency Genset Options Storage Site Evaluation Investigations – Geotechnical / Survey – Corrosion Preliminary Design – Tank Configuration & Materials – Site Drainage – Preliminary Design Report – Cost Estimate and Schedule Existing North Country Booster Station

5 | emwd.org Selection Process Received Proposals – January 14, 2016 Selection Panel – Operations, Field Engineering, and Engineering Evaluation Criteria – Past Performance and qualifications of the proposed team – Familiarity with project and capacity to handle all aspects of the work – Ability to commence work immediately and complete project within proposed time frame – Proposed project approach, scope, manner, and thoroughness in which it is presented in the proposal – Firm’s experience, staff availability, stability, financial responsibility, and past performance on similar project – Fee Proposal

6 | emwd.org Consultant Selection Summary Notes: (1) Albert A. Webb Associates negotiated scope & fee including optional tasks. (2) Best and Final Fee Proposal. Subconsultants to Albert A. Webb Associates: – Converse Consultants of Temecula, CA– Geotechnical services – Design West Engineering of San Bernardino, CA – Electrical engineering services – Inland Aerial Surveys of Riverside, CA – Photogrammetry services – RF Yeager Engineering of Lakeside, CA – Corrosion engineering services

7 | emwd.org Recommendation Approve and Authorize an Agreement with Albert A. Webb Associates of Riverside, California ($160,765) for Preliminary Design of the MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Project, and Appropriation in the Amount of $290,200. Authorize staff to initiate property acquisition negotiation and open escrow. Existing Casey Court Tank

8 | emwd.org Schedule Board Award – April 6, 2016 Kick-off Meeting – April 2016 Completion of Preliminary Design – November 2016

9 | emwd.org Contact Information Joe Mouawad Senior Director of Engineering Phone Number (951) Ext