03.09.2014V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara, 03.09.2014.

Slides:



Advertisements
Similar presentations
HV-LV DCS Workshop – 16/03/2004 G. De Cataldo, A. Franco, A.Tauro - INFN Bari Progress report on the HMPID LV System Cabling and LV sectorsCabling and.
Advertisements

LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
Status of the LAV electronics G. Corradi, C. Paglia, D. Tagnani F. Gonnella, M. Raggi INFN LNF F. Gonnella, M. Raggi INFN LNF Photon Veto WG CERN 13/12/2011.
LAV firmware status Francesco Gonnella Mauro Raggi 10 th October 2012 TDAQ Working Group Meeting.
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
LAV firmware status Francesco Gonnella Mauro Raggi 23 rd May 2012 TDAQ Working Group Meeting.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Status of the digital readout electronics Mauro Raggi and F. Gonnella LNF Photon Veto WG CERN 13/12/2011.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
MDT PS DCS for ATLAS Eleni Mountricha
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Readout electronics for the MUV detectors R. Fantechi 28/3/2012.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Cluster Finder Report Laura Sartori (INFN Pisa) For the L2Cal Team Chicago, Fermilab, Madrid, Padova, Penn, Pisa, Purdue.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
Remapping of 48V generators in US15 – Load Balancing Much better balanced load between chan A and chan B outputs More even load between generators, avoiding.
“TDAQ for 2012 runs” Gianluca Lamanna (CERN) Annual review meeting
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
TELL-1 and TDC board: present status and future plans B. Angelucci, A. Burato, S. Venditti.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
Matthew Moulson for the LAV Working Group NA62 Photon Veto Working Group Meeting CERN, 09 June 2015 LAV preparations for restart.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Florida Institute of Technology, Melbourne, FL
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
Preparation of chamber training g. passaleva. Gaps to be trained We have O (100) gaps that have tripped at least once since June At a quick glance they.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Talk board status R. Fantechi, D. Gigi, G.Lamanna TDAQ meeting, Mainz
FW and HW Status TDAQ WG 10/6/2015. Hardware MPOD: ◦ HV was NOT floating   Sensibility of current limit to external devices  Particularly for chamber.
TDAQ news and miscellaneous reports M. Sozzi NA62 TDAQ WG meeting CERN – 13/7/2011.
DESY TestBeam preparation CERN ) Michele Bianco, Marcin Drozdwa Byszewski, Givi Sekhniaidze, Joerg Wotshack.
TDAQ Working group meeting Mainz – 8/9/2011 Where do we stand? Where do we go?
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
Many LAV stations in digital trigger Francesco Gonnella Photon-Veto Working Group CERN – 03/02/2015.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
LAV electronics status report Mauro Raggi and Francesco Gonnella TDAQ meeting NA62 Collboration Meeting 1-5 September 2014 Ferrara.
Faculty of Physics, University of Belgrade Collaboration meeting, Budapest 15 th of May, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Requested hardware for Clermont-Ferrand in the test beam 2015 September 23 Roméo Bonnefoy and François Vazeille This material is provided by LPC and Collaboration:
PC-based L0TP Status Report “on behalf of the Ferrara L0TP Group” Ilaria Neri University of Ferrara and INFN - Italy Ferrara, September 02, 2014.
MobiDick4 progress report Carlos Solans. Introduction MobiDICK is a complete test bench for super-drawers Will be used during the maintenance in the long.
V.Duk, INFN Perugia1 CHOD TDAQ status and rates Viacheslav Duk, INFN Perugia On behalf of the CHOD working group.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
INSIDE in-beam PET system assembly and test at INFN Torino
LAV front-end and readout status
Jean-Sebastien Graulich, Geneva
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
T1 Electronic status Conclusions Electronics Cards:
M. Sozzi NA62 TDAQ WG meeting CERN – 20/10/2010
RPC HV&LV status Introduction HV power supply tender
Pierluigi Paolucci & Giovanni Polese
ZDD status BESIII Collaboration Meeting, September 2012
Presentation transcript:

V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,

V.Duk, INFN Perugia outline 1.HV 2.HV DCS 3.FE 4.FE DCS 5.DAQ 6.Trigger 7.Software 8.Message for the New CHOD 9.Conclusions 2

CHOD/NHOD HV V.Duk, INFN Perugia CHOD: CAEN SY403 old system 2 mainframes x 4 modules x 16 channels = 128 channels NHOD: CAEN SY403 old system 1 mainframe x 2 modules x 16 channels = 32 channels Status: CHOD frames, modules and cables installed and tested NHOD frame installed, cables to be installed and tested 3

HV DCS (standalone mode) V.Duk, INFN Perugia NHOD CHOD H CHOD V Linux PC (control room) Linux PC (ECN3) usb RS232 Ethernet, SSH minicom Status:  PC (ECN3) bought  Connectors bought  Preliminary tests with CHOD done 4 spare (DB9)

connectors V.Duk, INFN Perugia USB → 2 x RS232 (DB9 male) DB9 female → DB25 male 5

V.Duk, INFN Perugia CHOD/NHOD FE CHOD: 4 LAV FEE boards 4 x 32 = 128 channels, 256 channels in the TEL62 (2 TDCBs) NHOD: 1 LAV FEE board 32 channels (1 dead), 64 channels in the TEL62 (1/2 TDCB) Status:  4 LAV FEE boards are provided by LAV people  Threshold offsets for 4 LAV FEE boards to be measured in September  The 5 th LAV FEE board will be provided by LAV people  Cabling (patch panel to LAV FEE, LAV FEE to TEL62) to be done in September, all cables ready 6

V.Duk, INFN Perugia FE DCS (standalone mode) LAV FEE Linux PC (control room) Linux PC (ECN3) USB interface Ethernet, SSH LAV FEE Status:  The same PC will be used for HV and FE DCS  USB interface to be bought in September  Software will be provided by LAV people 7

V.Duk, INFN Perugia DAQ CHOD+NHOD: Standard Wiener crate 1 TEL62, 3 TDCBs (2 equipped by CHOD and ½ by NHOD) 8 Status:  Ingredients ready  Mounting in September

V.Duk, INFN Perugia CHOD L0 trigger 9 Hardware trigger ( σ ~ 2-3 ns) : Q1 can be implemented using LAV FEE ORs and NIM modules NHOD trigger: in the same way Firmware trigger ( σ ~ 0.5 ns) : CHOD firmware is based on the RICH firmware (input sorting, clustering) Impact point correction added (algorithm developed by Cristiano Santoni) L0 trigger primitive types and codes presented by Mauro Piccini in April Status:  Hardware trigger to be done in September (straightforward)  Firmware tests in progress (C. Santoni, Luigi Marzocchella)

V.Duk, INFN Perugia software 10 Status:  CHOD/NHOD reconstruction ready  CHOD/NHOD monitor to be implemented in September  New CHOD can be easily added

V.Duk, INFN Perugia Message for the New CHOD 11 itemPossible help from old CHOD HV HV DCSAccess to Linux PC FEPlace(s) in the 9U Wiener crate FE DCSAccess to Linux PC DAQ64 channels available, but one should think about cables from FE to TDCB SoftwareTR reconstruction available and can be modified We (Perugia group) can help but we need the detailed information as soon as possible

V.Duk, INFN Perugia conclusions 12 % readyHVHV DCSFEFE DCSDAQL0 triggersoftware CHOD100%80% 50%90%80%100% NHOD90%80% 50%90% 100% CHOD/NHOD are in a good shape