09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.

Similar presentations


Presentation on theme: "09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta."— Presentation transcript:

1 09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta

2 DT setup for Magnet test
Subsystems centrally controlled HV LV Minicrates (DAQ and trigger) RunControl 09/02/2006 HV, LV systems status for Magnet Test

3 Magnet test and cosmic challenge
We plan to have 3 DT sectors in 2 wheels (YB+2 and YB+1) ~ total of 14 DTs. HV needs: 1 SY1527, 5 A876 and 14 A877. We are ready to use a version of HV DCS which is completely integrated with the DCS of CMS (done in January 2005). This version uses FSM and Configuration and Condition DBs. We can access our data also from Oracle with ROOT. LV Needs: 2 A3486, 1 A1676A, 5 A3009, 8 A3050, 2 A3100. We just received part of this material and have developed the PVSS control project for this EASY equipment. 09/02/2006 HV, LV systems status for Magnet Test

4 HV, LV systems status for Magnet Test
HV Hardware setup Global HV+ Global HV- LV A877  powers 1 DT A876 HV THETA HV PHI1 HV PHI2 MacroChannels (Set ON/OFF, RuP,…) HV LAYER1 OutputChannels (Set V0, i0…) Wires1 Wires0 Cathodes Strips 09/02/2006 HV, LV systems status for Magnet Test

5 HV, LV systems status for Magnet Test
HV Magnet Test YB+1 HV +,- (x5) Counting room 1 Kerpen LV (x5) SY1527 A877 A877 A877 A877 A877 Patch panel A876 A876 A876 A876 A876 5 A876 Comm. (x2) 1 LV Novacavi 5 A877 HV- HV+ LV 1 Comm. Novacavi Comm. YB+2 HV +,- (x9) A877 Comm. (x3) Patch panel Patch panel A877 A877 A877 A877 A877 A877 A877 A877 1 Kerpen 1 Comm. Novacavi 2 LV Novacavi 1 A876 = 1 Comm. 4 LV 4 HV+ 4 HV- LV (x9) 9 A877 09/02/2006 HV, LV systems status for Magnet Test

6 HV, LV systems status for Magnet Test
LV Magnet Test (solution 1a) Counting room Comm. Comm. EASY 3000 A3486 A1532 A1676 Serv. Serv. CH0 48 V Power Comm. 48V Comm. EASY 3000 IN OUT Serv. A3486 Serv. CH0 CH1 EASY 3000 Comm. IN Patch panel ? Serv. 48 V Power 09/02/2006 HV, LV systems status for Magnet Test

7 HV, LV systems status for Magnet Test
LV Magnet Test (solution 1b) Counting room Comm. Comm. EASY 3000 A3486 A1532 A1676 Serv. Serv. CH0 48 V Power Comm. 48V Comm. EASY 3000 IN OUT Serv. A3486 Serv. CH0 CH1 EASY 3000 Comm. IN Patch panel ? Serv. 48 V Power 09/02/2006 HV, LV systems status for Magnet Test

8 HV, LV systems status for Magnet Test
HV Sector Test HV+ x 4 HV- x 4 4 A877 A876 A877 A877 A877 A877 SY1527 LV x 4 Comm. 1 A876 = 1 Comm. 4 LV 4 HV+ 4 HV- 09/02/2006 HV, LV systems status for Magnet Test

9 HV, LV systems status for Magnet Test
LV Sector Test LV Rack 48 V Serv. (cable missing) A1676 48 V Serv. SY1527 Comm. EASY 3000 Comm. (flat 50 pins) (cable missing) A3486 48 V Power A1676 can be housed in the same SY1527 also used for the A876 (HV) 09/02/2006 HV, LV systems status for Magnet Test

10 HV, LV systems status for Magnet Test
HV hardware SY A876 5 A Crates 3 HV cables Patch panels Counting room 2 Patch panels Wheels 2 Kerpen cables ~ 100 m 2 Novacavi LV cables ~ 100 m 3 Novacavi communication cables 2 Cables in counting room HV cables (SHV connectors) ~ 2 m 28 LV cables ~ 2 m 14 Communication cables ~ 2 m 5 Cables on wheels HV cables (SHV connectors) ? m 28 LV cables ? m 14 Communication cables ? m 5 Communication cables ~ 10 cm 9 09/02/2006 HV, LV systems status for Magnet Test

11 HV, LV systems status for Magnet Test
LV hardware SY A1676A 1-2 A EASY A A A Now Missing A A Easy A A LV Cables Communication Cables SCEM ~ 100 m 2 Cables SCEM ~ 2-3 m 2-3 48V Service Cables (connectors PP75 -> PP45) ~ 100 m 2 Cable (banana plug -> PP45) ~ 3 m 1 Cables (connectors PP45 -> PP45) ~ 2-3 m 3 48V Power Cables (connectors PP75 -> PP75) ~ 2-3 m 3 09/02/2006 HV, LV systems status for Magnet Test

12 Magnet test and cosmic challenge
We want to test the complete HV chain using the final Kerpen and Novacavi cables, and the patch panels which connect the A876 boards located in the control room to the A877 boards located in the racks on the detector balconies. We have to prepare the cables (material is available) and the patch panels. Will use 2 rack mounted PCs: 1 for the HV control and one for the DT supervisor and the LV control. 09/02/2006 HV, LV systems status for Magnet Test

13 Some slides from PVSS HV control software running at SX5 control room
09/02/2006 HV, LV systems status for Magnet Test

14 HV, LV systems status for Magnet Test
09/02/2006 HV, LV systems status for Magnet Test

15 HV, LV systems status for Magnet Test
09/02/2006 HV, LV systems status for Magnet Test

16 HV, LV systems status for Magnet Test
09/02/2006 HV, LV systems status for Magnet Test

17 HV, LV systems status for Magnet Test
09/02/2006 HV, LV systems status for Magnet Test

18 HV, LV systems status for Magnet Test
09/02/2006 HV, LV systems status for Magnet Test

19 HV, LV systems status for Magnet Test
Conclusions For the magnet test we plan to power a total of 14 DTs in sector 10 of wheel YB+1 and sectors 10 and 11 of wheel YB+2. The HV system used will be the final one manufactured by CAEN. PVSS project with FSM integrated with the central CMS DCS will be available for both HV and LV systems. First prototype PVSS project already running at SX5. We are missing some EASY modules. We did not order 1 A3009 and 1 A3050. Want to use final cables, patch panels, etc. which so far we are missing for both HV and LV. 09/02/2006 HV, LV systems status for Magnet Test