Presentation is loading. Please wait.

Presentation is loading. Please wait.

Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.

Similar presentations


Presentation on theme: "Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3."— Presentation transcript:

1 Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3

2 A lot of activity! It’s a fake!

3 PC farm room Jura Saleve Old System Router

4 PC farm room The first two PC (Mainz PC) are installed  problem for remote configuration in the old NA48 network The 4 additional PCs have been ordered three days ago, due to a burocratic problem Jonas will arrive the 2/7 Mainz PCs

5 PC farm room In the twiki you can find a proposal for IP numbering for each switch and sub-net The network is working! The configuration will be completed soon (before the end of the week)

6 PC Farm Room: Questions What is the status of the Merger PC HW? When it will be installed? What is the status of the CDR (HW and SW)? What about the “light version” of the Jonas program? It’s easy to do or it’s better to resume the old TELL1 DAQ software? …

7 Control Room

8

9 DCS User Interface PC ready 11 monitors ordered 3 PC for DAQ ordered (delivery foreseen next week) The furniture will be installed next week HVAC, power, etc. will be finish for the beginning of the Dry Run: no activity foreseen at the moment in the 918 during the dry run.

10 Control Room A CAD PC will be installed in the CR. Some doubt about the possibility to access to the licenses server Workaround: use the CAD software on centralized Virtual Machine Instructions on twiki

11 Control Room July 10 th we will do a first test for the run Control The run control will run on a PC in the CCR: some issue about the interaction of the TN with our config network will be fixed in the next days. Online Monitor: Antonio is working, but still we need the Merger PC to run the Online Monitor.

12 Control Room: Questions Proposal for ELOG? …

13 Infrastructure Optical splitters Choke/error panel Patch panels DSS Switch STRAW-02 CEDAR-01

14 Infrastructure LAV-03LAV-01

15 Infrastructure The path cords, patch cables and remaining parts will arrive this week (and will be installed next week) Small issue with the power in the racks RICH-01 IRC-01

16 Infrastructure Not all the optical splitters have been installed The switches have been installed and will be tested in the next days

17 Infrastructure EB36 StarPoint

18 Infrastructure L0TP primitive cables: almost done Choke/error cables: almost done TTC fibers: almost done Network fibers: almost done

19 Infrastructure: Questions What is the status of the CHEF board? Choke/error adaptor? When the Can Bus will be available?

20 Electronics Barrack

21 Marian already prepared a crate with all the LTU we need Next Friday Andrea will install the LKR/L0 TEL62 crate The TALK board will be installed in the week of July 9. We had a HW problem with the TIMING PC. We have a new PC ready to be tested (Riccardo)

22 Electronics Barrack: Questions When and where the CCPC server will be installed? Which kind of preliminary test are you planning before the dry run with the TALK board? Is the clock already installed? …

23 Detectors

24 Detectors TEL62 & TDCB documentation already available on twiki Information about the hardware status are available on twiki (for instance the cables)

25 Detectors The TEL62 cables support prototype will be build by Tonio in the next days

26 Detectors: Questions TEL62: – Which is the status of the TEL62 HW? – Which is the status of the TEL62 FW? TDCB: – Which is the status of the TDCB HW? – Which is the status of the TDCB FW?

27 Detectors: Questions CEDAR: – Which is the status of the test for the NINO boards? CHANTI: – Which is the status of the Chanti board? – When are you planning to install the detector? LAV: – Are you planning to help the other detectors for the board installation?

28 Detectors: Questions CHOD: – When are you planning to install the FE electronics? LKr: – Which is the status of the SLM readout? – Which is the status of the trigger distribution system? MUV2 & MUV3 – Which is the status of the TRAM board? – When the CFD will be installed? – How the cabling of the MUV2/3 will influence the dry run?

29 Detectors: Questions STRAW: – The VME readout will be installed during the dry run? – When? SAC – When the SAC cabling will be done? – Since the SAC electronics is in “common” with the MUV electronics, how the resources sharing will be “managed” during the dry run?

30 Next meetings 4 July: no meeting 11 July: Summary Useful numbers: Gianluca: 163714 Riccardo: 160619


Download ppt "Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3."

Similar presentations


Ads by Google