Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting 2011-01-30 1.

Slides:



Advertisements
Similar presentations
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Advertisements

TRD Collaboration Meeting GSI Clemens Adler TRD Chamber production issues General Issues, Planning and Hd Status.
Plan for MRPC Production Yongjie Sun Center of Particle Science and Technology University of Science and Technology of China.
TRD Status meeting Alice week HdClemens Adler TRD Chamber Status News: New leak rate measurements Production is imminent Some material arrived Soldering.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
Walls crates cables gas chambers electronics CERN adb.
ER Bundle “final” design D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
Embedded Programming and Robotics Lesson 6 Mechanical Assembly 1.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
3X3X3 LED CUBE By JASON WU CET4711 FINAL PROJECT.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 ISP PP0 Board Bonding Procedure Type 1 Type 3 Type 4peek Type 4 Assembly Name: ISP ASM Parts.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
FE-I4a Single Chip Card issues V. Tyzhnevyi HEP group, University of Manchester.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
V. Cindro, Jožef Stefan Institute, Ljubljana, Slovenia DAQ, DCS, Power Supply and Cables Review CERN, March Electrical PP1 Basic features Electrical.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
I Wilmut CCLRC1 End-cap Engineering 8 September 2004 Ian Wilmut, RAL.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
NSQP X-1 ASSEMBLY Lessons learned Sébastien MICHAL January 30 rd 2012.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
03/07/2000Status at TRIUMF1 Module Production Status Production Changes Material Production Status Status of Module Shipping Frame QC Status.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
09/07/20021Muon Meeting Status of MWPC activities at CERN and PNPI Outline: Module 0 status and plans –M3R1 (CERN) –M3R2 (CERN) –M3R4 (PNPI) Tooling status.
Activities Status and Plan for the week D. Giugni Monday Meeting
SCTSG - 17 October 2006 A. Ciocio1 SCT Services Installation Update Recent Full Report: September ID week SCT Cables Web page:
D. Greenfield CLRC1 UK-V End-cap Engineering 15 July 2003 Debbie Greenfield, RAL.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
25 October 2005A. Ciocio - SCTSG1 Type II/III Cables and PP1 Status & Plan.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
AIDA FEE64 production report January 2011 Manufacturing Power Supply FEE64 revision A “3 hour test” 19th January
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Laminate the NTC-HV and PS harnesses Assembly Name: PP1 Penetration Tape Parts requires:
1. Take HV harnesses with label (IHV2) and transfer on the Stacking table. 1.1 Inspect HV harnesses visually. 2.1 Insulate HV Flex with 3M™ VHB™ Tape.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
NSQP MEETING Valery AKHNAZAROV January 20th 2011 Corrugated Panel Bonding Procedure Assembly Name: ISP Corrugated Panel ASM Parts.
Status of the TileMuon Digitizer Board Victor Ferraz.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Cathode Production Status Muon Week April10th 2003 A. Benvenuti INFN Bologna.
NSQP’s + design implications D. Giugni / INFN Milano D. Giugni nSQP's meeting 1.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
DBM status and path to the prototype D. Giugni / INFN Milano D. Giugni nSQP meeting
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Mauro Citterio - Mi meeting
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
News about the WA104 Programme
Activities Status and Plan for the week
Activities Status and Plan for the week
Controller Rework.
Radiation Laboratory Meeting
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
FPC panel 8in x 12in 28/09/2017.
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
After service guide for changing PCB
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

Activities Status and Plan for the week D. Giugni / INFN Milano D. Giugni Monday Meeting

Harnesses Stacking Status Set 1 C34 (X0) –Open Issues Need to repair the bend of the OSP stack at the tapes Set 2 –General Set has NOT been assigned yet. Decided to put in hold: too many faults. –Status All usable Harnesses “Prepared” and tested –Open Issues Need several repairs Set 3 –General Set assigned to C12 –Status done –Open Issues OSP LV to stack. Problems in the wire bends D. GiugniMonday Meeting Set 4 –General Set assigned to C78 –Status Done EXCEPT OSP LV STACK –Open Issues OSP LV STACK to fix. Set 5 –General Set assigned to C56 –Status Done EXCEPT OSP LV STACK –Open Issues Need testing Set 6 –General : only pre-tested

Soldering Agreed sequence : –ISP C34 (X0) almost finished –ISP C12 (X1) in the pipe line –ISP C78 (X2) Ready to go –ISP C56 (X3) Ready to go (but needs another week for training the last soldering team) D. GiugniMonday Meeting

Schedule for this week Stacking –Keep going with SET 6 and the others. –Activity will be slowed down by 50% due to the ELCO connector pins removal (not quite an issue) Corrugated panel bonding: Delay in the SLA parts. 2 panels done for the C34 already assembled in the panel. –Restart the production this week as soon as parts are delivered (parts have been shipped). BackBone  Not at high priority this week. PP0 boards stiffening and Alu Block bonding Done C5, C6, C7 and C8. C Side has been finished. Actually we are not working on the OSP. –Priority on the ISP A side boards. Not foreseen this week for stiffening. Soldering –Keep going with the ISP C34 (X0) HV routing. –Load the C12 PS  PS soldering –Kick off the C78  HV-NTC Post Soldering Assembly Final Assembly Trial (X-1) –Low priority in loading the OSP 3 and ISP 3 on the trial. Needs ER_bundles!! 4