1 Activities Status and Plan for the week
D. Giugni / INFN Milano Monday Meeting D. Giugni

2 Harnesses Stacking Status
Set 1 C34 (X0) Done Set 2 No change since last week General Keep using set as Harnesses “replacement” Status All usable Harnesses “Prepared” and tested Open Issues Need several repairs. Not started yet Set 3, 4, 5, 6, 7, 8 All done except OSP LV stack Set 9 General : Set assigned to A78 ISP HV-NTC and OSP HV-NTC stacked. Need to stack the rest Need to terminate with LEMO connectors IPS-3 and OPS-5. D. Giugni Monday Meeting

3 Mechanics and parts for soldering
Stiffened and bonded PP0 boards ISP C-side: All done ISP A-Side: A34 done A12 almost done (needs to bond alu blocks) OSP: None Open issue: problem with the bonding tool. All resistors on T1 broken during . Modification of the tool is in progress. Corrugated panels: ISP: 8 out of 16 delivered OSP: None out of 16 Open issue: SLA Parts delivered on Friday!!! D. Giugni Monday Meeting

4 To do list for the week Stacking (week goal is to finish all Sets except Set 2 and Set 9) Full speed on finishing stacking: OPS LV 3, 4, 5, 6, 7, 8 [Valery, Olga, Jan] Start repairing the Set 2 harnesses. Mount LEMO connector on ISP LV and OSP LV Set 9 (Needed by Friday) Corrugated panel bonding: URGENT!: Verify the modification on the bonding tool [Valery] URGENT!: 4 panels needed by Friday (EndOfBuisness) for A34 and A12 [Valery, Mito] Trim and prepare the SLA parts and keep bonding all the other ISP’s PP0 boards stiffening and Alu Block bonding URGENT!: Repair the T1 resistors on A3, A4, A1, A2 [Olga] URGENT!: Bond the mounting block on A2 (needed by Fri EOB) [Valery, Mito] Continue to bond (at lower priority ) the rest of the ISP A side boards. BackBone  Start C34 Backbone bonding (low priority)

5 To do list for the week (cont’ed)
Soldering Start Soldering A34 (need to load ISP HV-NTC Set 6 on the table [Valery on Mo/Tue]) Start soldering A12 (need to load ISP HV-NTC Set 7 on the table [Valery on Mo/Tue]) Finish up ISP C56 Post Soldering Assembly Final Assembly Trial (X-1) Waiting for: info about which rows to load with the e-boards Waiting for e-boards Start designing the ER_Bundle take up at PP1 [Hans] Piping (Bg 16) URGENT!: ship the first production welding batch (25 HeX) [Michal] Qualify the new delivered fittings [Eric] Keep preparing parts for the next welding batch