Presentation is loading. Please wait.

Presentation is loading. Please wait.

Activities Status and Plan for the week D. Giugni Monday Meeting 2012-10-15 1.

Similar presentations


Presentation on theme: "Activities Status and Plan for the week D. Giugni Monday Meeting 2012-10-15 1."— Presentation transcript:

1 Activities Status and Plan for the week D. Giugni Monday Meeting 2012-10-15 1

2 Plan of the week 2D. GiugniMonday Meeting 2012-10-01

3 Plan of the week 3 Hex’s Production Completed! Week Plan Some marginal leak checking on the pipes extensions Finish up the spares

4 Plan of the week 4 Final assembly completed !!! Plan of the week Some PP1 wrapping Survey D. GiugniMonday Meeting 2012-10-08

5 EoB Main assemblies activities are COMPLETED: 8 nSQP’s are in hands. Survey requires some wrapping re-do and fixes that will take place before the E- boards installation Env. Sensors production is well advanced. Sensor installation will take place as a side activity. I would skip this meeting next Monday and reconvene in two weeks. Now it’s time to congratulate with all the people that have been working at the project. Looks like the ‘Mission Impossible” has been accomplished. THANKS EVERY BODY … Let us cross the fingers and look forward to the E-Board Loading. D. GiugniMonday Meeting 2012-10-015


Download ppt "Activities Status and Plan for the week D. Giugni Monday Meeting 2012-10-15 1."

Similar presentations


Ads by Google