FNAL Module Testing Status

Slides:



Advertisements
Similar presentations
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
Advertisements

TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Anthony AffolderUS CMS Meeting 12/3/02Previous Burn-in Experience CDF Burn-in Experience Hybrid Burn-in à 4 days with extensive tests at start/end à ~9.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
CMS Week, CERN, September Sep 2003CMS Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 16 Sep.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Hybrid & Module Testing Status
US Module Production Status
UCSB Testing 3 Stereo Modules Tested 1 SS6 Module Tested
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
Unexpected Failures of Modules on Rods
US Module Production Quality
Vienna Module Production
Module Failures on RODs
Module Failures on RODs
FNAL Module Testing Status
Module Production Status in Florence
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
UCSB Qualification Module Grading
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
FNAL Hybrid Testing Status
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
-.&- ·Af& Q 0 "i'/
Status of 44 ARCS tested TOB modules, June 24, 2004
A. Kaminskiy, CMS Tracker week , Apr 2004
FNAL Hybrid Testing Status
Is Increased Bias Current and CMN Correlated?
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
FNAL Hybrid Testing Status
FNAL Hybrid Testing Status
Università di Catania and INFN – Sezione di Catania
FNAL Hybrid Testing Status
Presentation transcript:

FNAL Module Testing Status Week of 04/12-04/18

FNAL ARCS Testing Status Weekly Cumulative   A B F % A or B L12pu 0.00% L12pd L12su L12sd L34p L56p 46 2 152 1 3 98.1% R5N R5S R6 6 R7 Total

FNAL ARCS Testing Failures This Week (7949-7996) one unexpected pinhole - pulled (mod 7955 # 768) 7972 – no readout (does not find APVs) 7970 - breakdown current behavior @430V (see plots) Cumulative (7835-7996) 1 grade “B” (mishandling) 2 HV or high current problems 1 – no readout Total of 7 pinholes so far

IVs for module 7970 Test 1: 19mA Graded as “A” 23mA Test 2: Graded as “F” Unstable current beyond 400 V No high noise channel found Graded “A/F”