Perris Water Filtration Plant Membrane Upgrade – Phase I

Slides:



Advertisements
Similar presentations
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
Advertisements

CONTRACTOR OUTREACH PROGRAM September 25, Disaster Recovery Program  $5.08 Billion HUD Funds to Mississippi in form of Community Development Block.
Brushy Creek Municipal Utility District Water Facility Project Status Update Presented at April 9, 2009 Board Meeting Joseph Jenkins, P.E., CH2M HILL.
How to Hit a Homerun Saving Energy and Updating Facilities Presented by Shirley McNutt.
Water System Planning Study
Cheri Cousens, P.E. – Executive Director September 15, 2010.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Jeff Ray, EIT Project Engineer, Treatment & Recycle Engineering Broadband Access Points & Programmable Logic Controllers Replacement – Phase 1 Project.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
Committed to providing safe, high quality water and related business services earning customer trust and confidence. Louisville Water Company Capital Program.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Water Supply Strategic Plan Brian Jack Powell, P.E. Director of Planning June 17, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
1 Highland Water District CAPITAL IMPROVEMENT PLAN.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Strength through History & Innovation City of Beaumont Salt Mitigation Feasibility Study Summary of Findings.
AquaSel Brine Concentration Pilot Project Update
TVRWRF 23 MGD Expansion Disinfection System Conversion
Camera PDR/CD1 Planning 19 September 2008
Water Booster Station Improvement Study
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Kings Bluff Raw Water System Parallel Raw Water Main Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Santa Ana River Conservation and Conjunctive Use Program- Prop 84 Grant Funding Contract Kelley Gage March 9, 2017.
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities, Phase 2 (ESCA II) Jayne Joy, P.E. July 18, 2017.
District-Wide Well Maintenance, Rehabilitation, and Repair
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
Capital Improvement Program Annual Report – 2016/17
Solar Initiative – Next Phase Opportunity
Voice Radio System Replacement Project
Phase 3 Solar Feasibility Study Findings and Recommendations
Enterprise Content Management Owners Representative Contract Approval
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Santa Ana River Conservation and Conjunctive Use Program Update
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
CITY OF MARSHALL CHLORIDE ISSUES September 26, 2017
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
City of Delphos Waste Water Treatment Plant
Brackish Water Desalination Project
Delta Water Supply Project
Coronado Elementary School Project Status
Authorizing ED to Reject Bid for Contract P01005C10
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

Perris Water Filtration Plant Membrane Upgrade – Phase I Joe Mouawad, P.E. April 28, 2016

Background Existing 500c Membranes 500d Membranes Installed in 2006 and approaching the end of useful life Increasing frequency of maintenance/repair activities Superseded by 500d module design 500d Membranes Support higher membrane integrity testing (MIT) pressures Will comply with EPA’s LT2 water quality testing standards Easier to maintain Investigation and Evaluation of Ancillary Equipment Investigate abrasive particles in raw water supply (sand and shell fragments) Identify potential upgrades to mitigate damage Screens and Reject Recovery Facility Evaluate products to replace fine screens Upgrades/modifications to existing blowers, pumps, and piping Telemetry and programming upgrades

PWFP Process Diagram

Scope of Work CH2M Hill Engineer of Record Proposed Scope Original Facility 20/24 MGD Expansions Proposed Scope Data Gathering and Analysis Site and Process Audit Sampling/Testing Plan Evaluate Options to Mitigate membrane integrity issues due to abrasive particles Project Report Support for Replacement of 500c Modules with 500d Develop bid documents

Project Components Pre-negotiate GE Proposal Review data from previous investigation of abrasive particles at Reject Recovery Facility performed by GE in 2015 Laboratory testing Water Quality data

Cost and Schedule CH2M Hill Investigation and Design Costs $198,196 Appropriation through Bidding Phase $288,196 Anticipated Bid Date October 2016 Anticipated Construction Completion May 2017 Construction Costs Estimated at approx. $4 Million

Recommendations Approve and authorize the following: Award contract with CH2M Hill of Santa Ana, California, for Engineering Design Services for the Project in the amount of $198,196; Administrative award of necessary contracts and agreements for support services for the implementation of the Project; and   Additional appropriation of $288,196 Perris Water Filtration Plant - Membrane Tanks Perris Water Filtration Plant - Reject Recovery Facility

Contact Information Joe Mouawad, P.E. Senior Director of Engineering Phone Number (951) 928-3777 Ext. 4463 Email: mouawadj@emwd.org