DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency Introductions; Objectives and Scope of the Course Tr aining course on Authorization and Inspection of Uranium Mining.
Advertisements

UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
International Atomic Energy Agency Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for.
Nuclear Infrastructure Development Evaluation: Perspectives from the United States Dr. Marc A. Humphrey Office of Nuclear Energy, Safety and Security U.S.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
AEEC Meeting Brussels Tomasz Jackowski, Poland Department of Nuclear Energy Ministry of Economy Perspective of Nuclear Energy in Poland.
Role of Independent Regulatory Body for Safe Operation of NPPs Zia Hussain Shah Director, Centre for Nuclear Safety Pakistan Nuclear Regulatory Authority.
Nuclear program of Lithuania Dr. Vidas Paulikas, Radiation Protection Department VATESI Visaginas, 29 June 2009.
IAEA International Atomic Energy Agency Human Resources Development for Nuclear Safety J. Bastos NSNI/RAS.
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
Thailand NUCLEAR POWER PROGRAM INFRASTRUCTURE AND STATUS OF IMPLEMENTATION: Regulatory Body Prof. Dr. Chaivat TOSKULKAO Secretary General Office of Atoms.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: Kazakhstan.
LEGAL FRAMEWORK & REGULATORY SYSTEM f or introduction of NPP into Vietnam Le Chi Dung (VARANS, Vietnam) Vienna, December 2008.
Tom MAZOUR IAEA, Division of Nuclear Power
IAEA Activities Related to Bidding and Bid Evaluation
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Republic of Moldova.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
GROUP 3:Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru, IAEA consultant Reporter:
Human Resources Development for Sudan Nuclear Power Programme Presented by Prof. F.I.Habbani Technical Committee For Sudan NPP Ministry of Energy and Mining.
JRC Information Day – May 11, 2006, Bucharest 1 Valică GOREA President of Nuclear Agency GOVERNMENT of ROMANIA Romanian Nuclear Programme Medium and Long.
1 THE INTRODUCTION OF THE FIRST NPP IN TUNISIA PROJECT STATUS Jomaâ Souissi Souad Baccouche Société Tunisienne d’Electricité et du Gaz Centre National.
Human Resources Development TM/WS Infrastructure Development 9-12 February 2010 Breakout session – Group 1 Moderator: Mr. Biro Lucian (Romania) Reproter:
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Key outcomes of IRRS Mission in Finland Kirsi Alm-Lytz.
TM/WS 9-12 February GROUP 3: Bangladesh, Croatia, Egypt, Jordan, Montenegro, Namibia, Senegal, Syria, Vietnam and Yemen Moderator: Dr. I. Rotaru,
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Thailand’s Preparation for Starting a Nuclear Power Program Mr. Pricha Karasuddhi Technical Advisor Nuclear Power Program Development Office(NPPDO) Ministry.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
Technical Meeting on Milestones for nuclear power infrastructure development Radiation Protection Khammar Mrabit Head, Regulatory Infrastructure and Transport.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
LEGAL and REGULATORY FRAMEWORK for NUCLEAR and RADIATION SAFETY in BULGARIA General overview Dr. M. Mateeva – Chief Inspector R. Markova-Mihaylova – Chief.
IAEA International Atomic Energy Agency Nuclear Power Infrastructure Development Technical Meeting/Workshop on: TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT:
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
0 Safety Infrastructure Development for Introduction of Nuclear Power S.K. Sharma Chairman, Atomic Energy Regulatory Board, India IAEA Workshop on Evaluation.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
RER/9/096 Regional Planning Meeting “Strengthening National Infrastructures for the Control of Radiation Sources” (TSA-1), (Phase II) Country: ROMANIA.
23 January 2016 Gustavo C ARUSO Head, Regulatory Activities Section Division of Nuclear Installations Safety Department of Nuclear Safety and Security.
INDONESIA NATIONAL STRATEGY FOR NUCLEAR POWER PROGRAMME INFRASTRUCTURE AND STATUS OF IMPLEMENTATION Dr. A. Sarwiyana Sastratenaya Director, Center for.
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
CAPACITY BUILDING AND E-LEARNING IN VIETNAM Le Dai Dien Nuclear Training Center – Vietnam Atomic Energy Institute Technical Meeting on the Use of the Global.
JORDAN ATOMIC ENERGY COMMISSION (JAEC) Building of National Safeguards Capabilities in Jordan IAEA’s Technical Meeting/Workshop on National Infrastructure.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Safety Assessment Process. Plant Modification.
IAEA International Atomic Energy Agency TM/WS TOPICAL ISSUES ON INFRASTRUCTURE DEVELOPMENT: MANAGING THE DEVELOPMENT OF NATIONAL INFRASTRUCTURE FOR NUCLEAR.
Leading State Inspector Ivan Rovkach Department of Nuclear and Radiation Safety Ministry of Emergency Situations of the Republic of Belarus(GOSATOMNADZOR)
International Atomic Energy Agency Workshop on Topical Issues on Infrastructure Development: Managing the Development of a National Infrastructure for.
BCĐT-ĐHN-NT1 Institute of energy NUCLEAR POWER DEVELOPMENT PLAN IN VIETNAM OVERVIEW, PROSPECTS AND CONCERNS 12/2009.
Egyptian Nuclear and Radiological Regulatory Authority (ENRRA)
János Krutzler Hungarian Atomic Energy Authority
Office of Legal Affairs
THAILAND Training and Tutoring Feedback
SESSION 3 Policy Framework
SESSION 3 Policy Framework
AAEA Role in Improving EPR Coordination Interventions among Arab Countries Abdelmajid Mahjoub Arab Atomic Energy Agency
Perspective and Current Status of Introducing Nuclear Power in Poland
Establishing the Infrastructure for Radiation Safety Preparatory Actions and Initial Regulatory Activities.
Armenia Training and Tutoring Feedback
Nuclear Power in Jordan
Communication and Consultation with Interested Parties by the RB
RCF Plenary Session 21 September 2018
CAPACITY BUILDING AND E-LEARNING IN VIETNAM
Legal and Regulatory Framework for Nuclear Installations in IRAN
Mostafa El-Asiry Nuclear Power Plants Authority (NPPA), Cairo, Egypt
THE INTRODUCTION OF NUCLEAR POWER IN EGYPT AN OVERVIEW
VIETNAM AGENCY FOR RADIATION AND NUCLEAR SAFETY
Nuclear Energy Programme Implementing Organisation
Regulatory system in Hungary
Presentation transcript:

DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu Tan Vietnam Atomic Energy Commission 59 Ly Thuong Kiet, Hanoi, Vietnam Vienna, 5-9 November 2007 The IAEA Technical Meeting/Workshop on Milestones for Nuclear Power Infrastructure Development on Milestones for Nuclear Power Infrastructure Development

2CONTENTS I. Introduction of the nuclear power program of Vietnam II. Development status of the national infrastructure for nuclear power in Vietnam III. Keys concern about the national infrastructure for nuclear power in Vietnam IV. Assisstances required from the IAEA V. Conclusions

3 I. INTRODUCTION OF THE NUCLEAR POWER PROGRAM OF VIETNAM (1) Establishment of the national steering committee for development of nuclear power in Vietnam on 5 March 2002 as the Nuclear Energy Programme Implementing Organization (NEPIO) of Vietnam in order to conduct all preparation works for the national infrastructure related to development of nuclear power in Vietnam. Establishment of an independent regulatory body so called the Agency for Radiation Protection and Nuclear Safety Control (VARANSAC) on 19 May 2003.

4 I. INTRODUCTION OF THE NUCLEAR POWER PROGRAM OF VIETNAM (2) On 3rd January 2006, the Prime Minister approved the Long-term Strategy for Peaceful Utilization of Atomic Energy up to 2020, emphasizing the important goals for building the first nuclear power plant (NPP) in Vietnam and putting it into safe and effective operation and exploitation, and establishing the sound infrastructures for the long-term national program for nuclear power development.

5 I. INTRODUCTION OF THE NUCLEAR POWER PROGRAM OF VIETNAM (3) On 23 July 2007, the Prime Minister approved the Master Plan for Implementation of the Long-term Strategy. Also in 2007, the Pre-FS for the 1st NPP in Vietnam and the VI Electricity Development Plan up to 2025 have been approved by the Government, showing the planned nuclear power will reach to 8,000 MW in The Draft of Atomic Energy Law is being considered by the National Assembly.

6 I. INTRODUCTION OF THE NUCLEAR POWER PROGRAM OF VIETNAM (4) All issues related to energy planning, nuclear power technologies, nuclear safety, fuel supply and domestic uranium resources, radwaste and spent fuel management, nuclear human resource development, domestic industrial participation, national and international legal framework, etc. have been investigated according to the direction of the National Steering Committee.

7 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (1) Nuclear legal framework: In the process of development and update Nuclear regulatory body: Established with about 40 staffs, but experienced experts are limited. Technical support organizations: The nuclear safety center, the NDE center, Radiation protection and Environmental Radioactivity Monitoring center, the center for standardization and calibration in radiation and nuclear fields have been established, but still limited in human resources and technical capabilities.

8 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (2) Human resources development: some policies, programmes and activities on training and education have been done, but the national action plan for nuclear human resources development is not yet approved by the Government. Nuclear R&D activities and institutions: Many activities and researchers, but mainly in non-power applications.

9 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (3) Nuclear fuel and domestic uranium resource: In the process of investigation of policies for sustainable supply of nuclear fuel for nuclear power plants in Vietnam and for use of national uranium resources for the nuclear power program. Radwaste and spent fuel management: Accumulation of experiences for more than 20 years of operation of the Dalat reactor, some researches on policy and technical aspects for radwaste and spent fuel management have been done.

10 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (4) Site selections for NPPs and Radwaste Storage: Some research projects have been done. National Industrial Participation: One research project on evaluation of the national industrial capability for participation in the first nuclear power project and elaboration for development of national related industries has been done.

11 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (5) International cooperation: The technical cooperation with foreign partners has been promoted. Plan for participation in all related nuclear conventions has been studied. National action plan for nuclear emergency and preparedness: It has been prepared.

12 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (6) Investment and financial arrangement: It has been investigated in the Pre-FS study for the first NPP project. Public information: Many activities including exhibitions, TV propaganda, newspapers, organization of visits to nuclear facilities,…

13 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (7) General Evaluation: According to the guides of the IAEA Nuclear Energy Series No. NG-G-3.1 “Milestones in the Development of a National Infrastructure for Nuclear Power”, Vietnam has passed the milestone 1 in development of a national infrastructure for nuclear power and now in the stage to prepare for the milestone 2.

14 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (8) The IAEA Nuclear Energy Series No. NG- G-3.1 “Milestones in the Development of a National Infrastructure for Nuclear Power” is useful for a country preparing for introduction of nuclear power. It gives a guideline on what a country has to develop a national infrastructure for nuclear power. However, the difficulty for a developing country is how to develop it.

15 II. DEVELOPMENT STATUS OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (9) Besides, one of the most important thing in the infrastructure for a developing country is science and technology capability including establishment of national and private R&D institutes, institutes for standardization and calibration, higher educational institutes, professional training centres, scientific academies and professional associations, national industry has yet to take into account as one issue.

16 III. KEYS CONCERN ABOUT THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (1) Legal and regulatory framework: Clearance of procedure for licensing of a nuclear power project from the beginning to the decommissioning in which responsibilities of related organizations have to be determined clearly.

17 III. KEYS CONCERN ABOUT THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (2) Enhance of capability of technical support organizations: How to review, evaluate a safety analysis report and make safety inspection of a nuclear power project in all stages including design, site selection, construction, operation, maintenance,… Even in the case of using international consultancies, how can we develop minimum capability of technical support organizations in order for us to make decision on safety issues based on the international consultancy.

18 III. KEYS CONCERN ABOUT THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (3) Enhance of national science and technology capability: How to make decision on the NPP technology selection for the first NPP in Vietnam? How to absorb and master the transferred technology? and How to help the national industry to master the transferred technology.

19 III. KEYS CONCERN ABOUT THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM (4) Enhance of capability of the NPP owner: How to make the utility technical criteria for the NPP? How to make the international bid for the NPP project? How to built up national capabilities on the project management? Procurement? Construction? Operation? Maintenance?

20 IV. ASSISSTANCES REQUIRED FROM THE IAEA Expert services in development of legal and regulatory framework. Training staffs and provision of technical equipment for technical support organizations, nuclear R&D institutes and the NPP owner. Review the Feasibility Report of the first NPP project. Evaluation of the site selection.

21 V. CONCLUSIONS Vietnam Government has made a strong commitment on development of nuclear power with the important goals for building the first nuclear power plant in Vietnam and putting it into operation in the year of 2020.

22 V. CONCLUSIONS We have 13 years for preparation of all national infrastructure for nuclear power with milestone 2 and 3. It requests a big effort from national organizations and a wide international cooperation with the IAEA and advanced nuclear power countries.

23 V. CONCLUSIONS We highly appreciate the assistance from the IAEA so far to Vietnam and do hope to continue receiving the more assistances from the IAEA in preparation of a national infrastructure for nuclear power in Vietnam in years to come.

24 Thank you for your attention! Thank you for your attention!