AEEC Meeting Brussels 23.11.2009 Tomasz Jackowski, Poland Department of Nuclear Energy Ministry of Economy Perspective of Nuclear Energy in Poland.

Similar presentations


Presentation on theme: "AEEC Meeting Brussels 23.11.2009 Tomasz Jackowski, Poland Department of Nuclear Energy Ministry of Economy Perspective of Nuclear Energy in Poland."— Presentation transcript:

1 AEEC Meeting Brussels 23.11.2009 Tomasz Jackowski, Poland Department of Nuclear Energy Ministry of Economy Perspective of Nuclear Energy in Poland

2 Electrical energy consumption in European Union per capita Tomasz Jackowski, Ministry of Economy Poland 2699 kWh/y per capita UE27 5707 kWh/y per capita Eurostat 2006

3 Sources of electrical energy supply Poland EU World Tomasz Jackowski, Ministry of Economy Electricity in 2005 – IEA 2008

4 Tomasz Jackowski, Ministry of Economy 1.7% 0.3% 58.7% 0.1% 2.0% 2.2% 35.0% Hard coal power stations and CHPs Lignite power stations Gas power stations Hydro power stations (included pumped-storage) Wind power stations Biogas and biomass power stations Other fuels Fuel Structure of Electricity Generation in Poland 4

5 Tomasz Jackowski, Ministry of Economy Age Structure of the Existing Power Plants in Poland 6% 7% 5% 16% 17% 44% to 5 years 5-10 years 10-15 years15-20 years 20-25 years25-30 yearsover 30 years 5

6 Energy Policy in Poland till 2030 adopted 10 November 2009 Priorities Raise of energy effectiveness Safe energy supply Implementation of nuclear power as the element of energy diversification Development of renewable sources of energy including bio fuels Creation of competitive market of energy Limitation of environmental influence of power production Tomasz Jackowski, Ministry of Economy

7 Sustainable development Improvement of energy supply security taking into account energy supply for future generations Climate preservation Limitation of environmental influence of power production Development of electrical, gas and oil transportation infrastructure Tomasz Jackowski, Ministry of Economy

8 GOVERNMENT RESOLUTION ON THE MEASURES UNDERTAKEN IN THE AREA OF NUCLEAR POWER DEVELOPMENT On January 13 2009, the following resolution has been adopted by the Government of the Republic of Poland : To ensure the national energy security, and taking into account the economic development, a Polish nuclear power program shall be developed and implemented. Tomasz Jackowski, Ministry of Economy

9 GOVERNMENT RESOLUTION ON THE MEASURES UNDERTAKEN IN THE AREA OF NUCLEAR POWER DEVELOPMENT –cont. The draft of such program shall be developed and submitted to the Council of Ministers by the government commissioner; this program shall determine the nuclear power plants' number, size and possible sites. Moreover, the government obligates the National Treasury Minister to ensure that PGE Polish Energy Group SA shall cooperate on the program's development and implementation. Tomasz Jackowski, Ministry of Economy

10 Government Information Center added the following comment: In connection with the government resolution of January 13, 2009 on starting the work on Polish Nuclear Power Program, at least two nuclear power plants will be built. The work will be conducted simultaneously, and the operation of at least one of these nuclear power plants should be started by 2020. Nuclear power plant construction in Poland does not preclude Polish involvement in similar investments abroad. Tomasz Jackowski, Ministry of Economy

11 Comment by the Government Information Center – cont. Government's Plenipotentiary for Polish Nuclear Power Program shall be charged with the coordination and supervision of the measures for the preparation of the regulatory and institutional environment, necessary for the nuclear power plant commissioning in Poland. Responsibility for the plant's construction rests with PGE Polish Energy Group SA. Tomasz Jackowski, Ministry of Economy

12 Government Commissioner responsibilities 12 May 2009 Governmental decree concerning responsibilities of the Plenipotentiary of Polish Government for the development of Nuclear Power Role of the pleniptentiary –infastructure building and coordination of the programme of nuclear power implementation in Poland Support from the Polish Energy Group Tomasz Jackowski, Ministry of Economy

13 19 May 2009 – Appointment of Mrs. Hanna Trojanowska to the post of Plenipotantiary of Polish Government for the Development of Polish Nuclear Power and Undersecretary of State in Ministry of Economy Tomasz Jackowski, Ministry of Economy

14 Nuclear energy in energy policy - 1 Activities leading to establishing Nuclear Energy Program Implementing Organisation supervised by Minister of Economy Defining necessary changes in Polish law to implement nuclear power program Human Resources Development for Nuclear Power Program Tomasz Jackowski, Ministry of Economy

15 „Framework time schedule for nuclear power activities” acknowledged by the Council of Ministers on 11 August 2009 I until 31.12.2010 preparation and approval by the Council of Ministers of the Polish Nuclear Power Program II2011 – 2013 NPP site selection and conclusion of a contract for construction of the first NPP III2014 – 2015preparation of technical design and obtaining all required decisions and permits IV2016 – 2020construction of the first NPP in Poland Tomasz Jackowski, Ministry of Economy

16 NEPIO In February 2009 creation of Nuclear Energy Department having 9 employees In 2009 plan to have 20 person In 2010 plan to reach 44 person and take the promotion and coordination activities from National Atomic Energy Agency Tomasz Jackowski, Ministry of Economy

17 Law adaptation Analyses of existing systems of regulations in EU countries and some OECD countries The development of draft regulations till the end of 2009 and government approval planned till June 2010 Tomasz Jackowski, Ministry of Economy

18 Human resources development stage 1 Educating and training HR for technical universities, NEPIO, Nuclear Regulatory and investors 6 months in existing NPP and training center 6 months in corresponding institution abroad – more than 100 persons Tomasz Jackowski, Ministry of Economy

19 Human resources development - stage 2 MSc II-nd stage studies or post graduate studies partially abroad - 300 persons Graduates from the above mentioned studies – 6 month training in NPP and training center Tomasz Jackowski, Ministry of Economy

20 Human resources development – stage 3 Reactor Engineering Departments at Technical Universities and other specializations needed for nuclear power implementation 6 month training in foreign NPPs and training centers Tomasz Jackowski, Ministry of Economy

21 Nuclear energy in energy policy - 2 Information and education campaign concerning nuclear energy program Site selection analyses for first NPPs Site selection design and construction of the Low and Intermediate Level Radioctive Waste Repository Reinforcement of human resources and competences of Nuclear Regulatory Institution Tomasz Jackowski, Ministry of Economy

22 Nuclear energy in energy policy - 3 Building nuclear R & D infrastructure on the basis of existing research institutions Development of Fuel Cycle Solutions ensuring long-term and safe access to nuclear fuel, recycling of spent fuel and reposition of high level radioactive waste for Poland Tomasz Jackowski, Ministry of Economy

23 Public information Professional PR Department of NEPIO Teachers education Information about nuclear power in education programmes Widely available web database concerning nuclear facilities Tomasz Jackowski, Ministry of Economy

24 Site selection for NPPs Lack of site selection criteria in Polish regulations Site selection based on geology, tectonics, hydrology, demography, meteorology, grid infrastructure and power demand performed 20 years ago for 8 sites Necessary verification of performed analyses Public consultations Tomasz Jackowski, Ministry of Economy

25

26

27

28 Building Low and Intermediate Radioactivity Waste Disposal Site analyses Project of the LIRW Disposal Public consultation Construction of the new disposal Closure of the Różan disposal Tomasz Jackowski, Ministry of Economy

29 Thank you for your attention!