HUNTING CAMP FACILITY BY: Ryan Fremin ET 494 Senior Design II Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.

Slides:



Advertisements
Similar presentations
2014 State Data Center and Census Information Center Steering Committee Meetings An Update on the 2012 Economic Census March 5, 2014 Chuck Brady Customer.
Advertisements

WILDLIFE WATCHING A National Trend Presented by Wildlife Watch © Copyright Wildlife Watch Inc. 2008/2009.
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
Robert Adkins Et 493 Dr. Kris Koutsougeras Advisor: Dr. Rodi.
Helping Business Owners Leverage LinkedIn For Profitable Business Growth By Mark D. Yates Operations Director at Link Business Marketing Ltd © Dr. Mark.
Economics 101: How to Measure Indirect Values Benjamin S. Rashford Agricultural and Applied Economics University of Wyoming.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
1 David Saenz 1 Hutch Construction in FEH June 08, 2009 Hutch Construction in Far Experimental Hall David Saenz – Project Manager.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
EE496A Senior Design Project I Dr. Jane Dong Electrical and Computer Engineering.
Yield-management pricing Tickets for games that are in higher demand will cost more in order to maximize profit. For playoff games or finals customers.
ET 493 – Senior Design Southeastern Louisiana University Jarrett Johnson Mechanical Engineering Technology Instructor: Cris Koutsougeras Advisor: Mohammad.
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Market Research Stage 6 Business Studies. Success depends on a lot of things, but when you have information about a particular market segment, a geographic.
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder ET 493- Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1Spring Quarter Project Management Week 2 Day 2.
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Wind Turbine Support Structure
Jacob Ruiz W# ET Senior Design Instructor: C. Koutsougeras Advisors: R. Rode May 9, 2014 Jacob Ruiz W# ET Senior Design Instructor:
The Steps to “Auto Aftermarket” The Steps to “Auto Aftermarket” An example of how ad spending estimates in Borrell Associates’ Compass service are derived.
DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.
ET 493 Senior Design Spring 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Dr. Cris Koutsougeras Advisor: Edward Rode.
ET 494 Senior Design II Fall 2013 By: Justin Cifreo, Benjamin Gabriel, Nathan Taylor Instructor: Dr. Cris Koutsougeras Advisor: Dr. Junkun Ma Mechanical.
Patrick Roach Robert Arena ET-493 Fall 2014 Instructor: Cris Koutsougeras Advisor: Edward Rode.
Water-saving Shower Faucet By: LaJerrika Carney & Ryan McDaniel Advisor: Dr. Mohammad Saadeh Class Professor: Dr. Cris Koutsougeras ET Senior.
Senior Design II proposal A step-by-Step review. What is Senior Design?  Senior Design is a sequence of two courses during two consecutive semesters.
Vertical Axis Wind Turbine Simulation
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
BUSINESS ACCOUNTING U23348/U20431/U21076 LECTURE 1 Introduction to Business Accounting, cash budgets.
Network (traffic) Planning Cross country and local traffic planning.
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
October 15, 2007 Smart Card. Smart Travel. TransLink ® Card Procurement Study Update Presentation to the TransLink Operating Group.
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
Steel Fabrication & Erection of Belle Chase Primary School Proposal – Fall 2015 ET 494 – Senior Design II Derek Duhon Instructor: Dr. Koutsougeras Advisor:
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
ET 494 – Senior Design II Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
ASHLAND TOWN HALL May 10, Ashland Town Hall  Dedicated April 12, 1955  Plan for the next 50+ years  Strategic Plan:  Initiative – Develop.
Contract and Tender form Phases of Designing Phases of Implementation VIA / TCU 4th semester workshop S2016 Contract and Tender form S2016 VIA University.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
Design of a Commercial Shopping Center
Commercial Office Building
Designing a Commercial Shopping Center
Commercial Office Building
Design of a Commercial Shopping Center
Multistory Office Building
ET 494: Senior Design Design of a New Hammond Head Start Center
Commercial Office Building
Instructor: C. Koutsougeras
Redesign of a Safety Syringe
Coppin State University
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
Water-saving Shower Faucet
NEW MEDICAL FACILITY BUILDING
Contract and tender form Phases of designing Phases of implementation
01 DRAW YOUR TIMELINE HERE JAN. MAR. JAN. MAR. FEB. APR. FEB. APR.
New Medical Facility Building
Multi-Family Fourplex Apartment
Bob's Burgers, Hammond Louisiana
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

HUNTING CAMP FACILITY BY: Ryan Fremin ET 494 Senior Design II Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode

PURPOSE  Perform complete theoretical construction process of hunting camp facility  Research Needed  Location Selection  Giving Structure Options  Rough Drawing and Estimates  Design Selection  Complete drawings, schedule, and estimate

WHY HUNTING  In 2011 there was a total of 13.7 million hunters in the United States  23 % of all wild-life recreation is found in hunting  (US Census Bureau)  $564,385,000 Was spent in 2011 for trip–related hunting in Louisiana  $315,763,000 Was spent in 2011 for trip-related hunting in Mississippi  Louisiana-16 %  Mississippi- 36 %

RESEARCH  The given statistics show that this can be a lucrative business.  Current pricing for pay hunts  Lodging $1000-$2000  Hunting-----Min------$ 4,000 (8-Point)  Mississippi is in the top 15 places that hunters like to hunt  Shows profitability and demand

DESIGN OPTIONS  LOG CABIN  Will give the owner and customers a more luxurious feel with all of the necessities.  Less cost effective  PRE-ENGINEERED METAL BUILDING  Will give the owner and customers all of the necessities with the option of adding luxuries after design and pricing is completed.  Cost Effective (Key for this build)

LOG CABIN Example ( Gile’s Island)  Nice facility to conduct business  Most need separate buildings for lodging (Total sq.ft.)  Lodging takes up possible land and reduces amount of huntable property  Popular but expensive to construct

PRE-ENGINEERED METAL BUILDING Example ( Converted Metal Building)  Cost effective  Fast Construction  Combines facilities into one location  Gives added space for possible upgrades  40’x80’( total – 7200 sq.ft.)

ROUGH DRAWING – LOG CABIN

ROUGH DRAWING – METAL BUILDING

DESIGN DECISION  Pre-Engineered Metal Building $456,264  Log Cabin $507,400  Difference $ 51,136 or 10% cheaper

DETAILED DRAWINGS  The detailed drawings will be done from the last week of the semester into the break. They will be continued while doing a material takeoff at the same time.  This will allow sufficient time to complete drawings and estimate.

TIMELINE Jan 21-Jan 24First Week Back to Classes Jan 27-Jan 31Update Powerpoint for Semester Feb 3 –Feb 7Continue Drawings/Material Takedown Feb 10 – Feb 14Continue Drawings/ Material Takedown Feb 17 –Feb 21 Continue Drawing/ Material Takedown Feb 24– Feb 28Finish drawings Mar 3–Mar 7Complete Survey of Location Mar 10–Mar 14Determine Foundation Plan Mar 17– Mar 21Begin Estimate Mar 24- Mar28Cont. Estimate

TIMELINE (CONT.) Mar 31– April 4Produce Final Estimate April 7- April 11Begin Planning and Scheduling April 14 – April 18Cont. Planning and Scheduling April 21– April 25Complete Planning and Scheduling April 28– May 2Begin Finalizing Project May 5– May 9Complete Final Project