Presentation is loading. Please wait.

Presentation is loading. Please wait.

By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras

Similar presentations


Presentation on theme: "By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras"— Presentation transcript:

1 ET 494: Senior Design II Completion of the Design of a New Hammond Head Start Center
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward Rode

2 Overview Objective: Design - AutoCAD Estimate - Microsoft Excel
Analyze - Primavera

3 Site Location 20368 E. Highway 190 Hammond, La. 70401
2.63 acres of cleared land Priced at $399,900 Ideal location Multi-family Homes Highway 190

4 Site Location Aerial View

5 Elevation Point 1 – 33.2 ft Point 2 – 35.0 ft Point 3 – 36.4 ft
Base Flood – N/A Finished Elevation – 36 ft

6 Ground Work Existing ground only Leveled to a height above flood zone
Slope away from building

7 Building Codes Hammond Zoning Ordinance booklet.
Part 1: Principles and Objectives Part 3: Schedule of District Regulations Adopted Part 5: Off-Street Parking and Loading Requirements

8 Fire Codes NFPA 101: Life Safety Code booklet 1994.
Chapter 26: New Building Occupancies Section General Requirements Section 26-2 – Means of Egress Requirements Section 26-3 – Protection

9 L.E.E.D. Look into L.E.E.D. improvements for our building.

10

11 Working Drawings Base Floorplan Electrical Plan Foundation Plan
With Details Ceiling Plan Final Elevation Site Plat Plan

12 Floor Plan

13

14

15

16

17

18

19

20

21 Any Questions?


Download ppt "By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras"

Similar presentations


Ads by Google