DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014.

Similar presentations


Presentation on theme: "DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014."— Presentation transcript:

1 DUNLEITH LANE DRAINAGE SYSTEM Justin Lyle and Cody Binder Senior Design Advisor: Mohamed Zeidan Construction ET 10/08/2014

2 Objective  To understand what the drainage problem is on Dunleith Lane in Mandeville, Louisiana.  Once the problem is fully understood, formulate the most cost efficient way to correct the problem.

3 Overall Vision  Repair the drainage issue on Dunleith Lane  Reduce the amount of standing water in the ditches after storms  Prevent any flooding from happening in the streets or the back yards of the occupants

4 Research on Drainage Correction  Research different ways that different drainage issues are corrected  See how this particular drainage problem compares to other common drainage issues  Research flow rate formulas and how they will apply to the drainage on Dunleith Lane

5 Deliverables  Through the use of surveying and soil mechanics we will be able to understand and evaluate the drainage issue  Drafting will also be required in order to get the drawing on paper with proper dimensions and elevations applied, AutoCAD will be the tool we use to do our drafting  Some fluid mechanics will also be required in order to calculate the flow rates of the drainage system we plan to establish  Estimating the amount of land that will be need to be cut and filled will also play a role in this project  Lastly, project management skills will be required to go about the project in the most cost efficient manner.

6 Photos Main drainage that carries water out of the neighborhood to an external drainage system

7 Photos (continued) Photos show how shallow the drainage system in the neighborhood is in some spots compared to others (causing standing water to accumulate

8 Timeline (1 st Semester)  10/8- Proposal/Power Point  10/13- Receive Permission from Homeowners  10/19- If possible receive any existing drawings of the land  10/27-Take detailed pictures of area  11/2-Measure Dimensions of neighborhood  11/10-Create Preliminary drawings with dimension  11/17-Survey the Area  11/24-Analysis of the collected data/establish problem  12/1- Complete final presentation (first semester)

9 Timeline (2 nd Semester)  1/27- Proposal  2/5- Establish flow rate of current system  2/16- Research correcting similar drainage issues  2/26- Create ideal drainage system  3/5- Calculate how much will be cut and filled  3/18- Create drawing of new system and cut and fill diagram  4/1- Estimate cost of project options  4/15- Create schedule for project  4/29- Establish most cost effective option  5/10- Final Presentation