Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Kara Drolet Date: February 19, 2015 Research Administration Information Network.

Slides:



Advertisements
Similar presentations
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Kara Drolet Date: June 19, 2014 Research Administration Information Network.
Advertisements

USF Research Integrity & Compliance eIRB Comprehensive Training 10/07/2014.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Nancy Duncan Date: March 20, 2014 Research Administration Information Network.
Procurement.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Dave Holmgren Date: March 19, 2015 Research Administration Information Network.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Rachel Dresbeck Date: February 20, 2014 Research Administration Information Network.
Welcome to…RAIN (the meeting formerly known as SPIN) Presented by: the folks in RDA, with today’s emcee, Jennifer Crosby Date: March 15, 2012.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Dana Director Date: September 18, 2014 Research Administration Information Network.
Research Administration Forum June 17, Agenda Tuition Costs (David) Conflict of Interest Disclosures (David) Revised Division Approval Form (David)
Office of Research Integrity Office of Research Integrity Orientation Session November 8, 2012 ECSS
Working with DRDA NSF Career Development Workshop Division of Research Development and Administration Dave Plawchan Managing Project Representative, DRDA.
An Introduction to Grants.Gov Office of Sponsored Programs Virginia Commonwealth University Spring 2006.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Tracy Zitzelberger Date: January 15, 2015 Research Administration Information Network.
Cobb County School District After School Program Financial and Operational Training APS Directors Monday, July 13,2015.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Darlene Kitterman Date: July 17, 2014 Research Administration Information Network.
Working with Quorum Allina Health Megan Simpson, CIP Senior Study Manager Allina Account Manager.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Jennifer Crosby-Meurisse Date: April 16, 2015 Research Administration Information Network.
Indiana University East March 10, 2009 Teresa Miller, Manager Office of Research Administration – Grant Services.
CSBS Fourth Friday Faculty Workshop 1: Grant Management CSBS: Frances Solano ORSP: Stefanie Friesen TUC: Stacey Lord / Maryann Camarillo 1/23/
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Deborah Golden-Eppelein Date: January 16, 2014 Research Administration Information.
SPA Updates 1 st Quarter 2015 February 19, :30 – 4:00 pm SOP N103.
Introduction to Pre-award Research Administration Karen Hawkinson, Frances Spalding and Roger Wareham
Introduction to INSPIR OCR Seminar Series January 21, 2004 Mary Banks, RN Administrator, Office of the IRB.
Community Engagement Pilot Grants Program Orientation January 11 and 13, 2010.
Research Administration at Yale
New IRB Guideline Changes and Converting to eIRB - Suggestions for Maintaining Compliance. Ramesh Ghodgaonkar, BPHARM, MSITS, MSB, MBA Betsy Johnson, BA.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Darlene Kitterman Date: November 20, 2014 Research Administration Information Network.
POST-AWARD GRANT MANAGEMENT June 23, 2014 Presented by Arina V. Kramer Grants Management Specialist Office of Grants Administration, NCI.
Welcome to… RAIN Presented by: the folks in RDA with today’s emcee, James Trotter Date: November 15, 2012 Research Administration Information Network.
Office of the Vice Chancellor for Research 1 Update on PHS New Rule on Financial Conflicts of Interest (FCOI) Presentation to Business Managers January.
Sponsored Programs Services (SPS) PROPOSALS. What is the PI’s role in the proposal?  Contact the central pre-award center,
CSBS Faculty Workshop: The Proposal Process CSBS: FRANCES SOLANO ORSP: STEFANIE FRIESEN 9/16/15 1.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Aric Dutelle Date: May 21, 2015 Research Administration Information Network.
Financial Closeout Reminders OSR Post-award School of Medicine Team February 11, 2009.
Welcome March 2010 SPONSORED PROJECTS INFORMATION NETWORK.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Rachel Dresbeck Date: July 16, 2015 Research Administration Information Network.
The Fundamentals of Federal Grant Writing Friday, February 27, :00 a.m. – 1:30 p.m. Lower Dansbury “How To” at ESU Grant Writing Christina McDonald,
Office of Research & Sponsored Programs (ORSP) Darren McCants, Director David Azbill, Assistant Director Cindy Brown, Program Mgr, Corporate Research Robbie.
Welcome to…RAIN Presented by: the folks in RDA with today’s emcee, Dana Director Date: May 17, 2012 Research Administration Information Network.
Faculty coming aboard: Best Practices for PI Transfers.
Welcome to…RAIN Presented by: the folks in RDA with today’s emcee, Rachel Dresbeck Date: July 19, 2012 Research Administration Information Network.
Debra Murray, Georgetown University Tolise Miles, Children’s National Medical Center Clairice Lloyd, Georgetown University Medical Center Pre-Award and.
Electronic Submission: Update and Lessons Learned July ORA Third Tuesday July 15, 2008.
Rebecca Nickleson, MS, CRA Assistant Director Office of Research & Sponsored Programs.
Carilion Clinic, Office of Sponsored Projects Frequently Asked Questions Pre-Award Procedures For Principal Investigators.
Grants Assistance Unit. Ted Nelson, Director (213) Ronice White, Administrative Analyst (213)
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Jennifer Crosby-Meurisse Date: October 17, 2013 Research Administration Information.
AP Information for Parents AP Information for Parents Welcome!
Ver. 02/13/  Registration  New Studies  Continuing Reviews  Amendments  Reportable Events  Tips & Tricks  Questions 2.
HR Research Resource Faculty Tuition Policy Sub-awards in Cayuse Recent NIH & NSF Notices Brief Reminders & Announcements.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Simone Waddell Date: October 15, 2015 Research Administration Information Network.
Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Dana Director Date: November 19, 2015 Research Administration Information Network.
ADAPTIVE SPORT GRANT PRESENTATION To Access the Meeting: Code 49048# Online:
Lifecycle of an Award Reporting, Close-outs and Audits Michelle Vazin, Vanderbilt University Michele Codd, George Washington University.
1 Mission Impossible: Understanding the Pre-Award Grant Process Monique Foxx, MHSA Manager, Office of Sponsored Programs Stephanie Bair, MS Grants Management.
SPA 101 Nancy Duncan Award Analysis Supervisor Sponsored Projects Administration.
RCC Update ORS Quarterly Meeting April 28, 2016 Julie Cole, Director Research Costing Compliance.
© 2016 University at Buffalo Click Training IRB Module University at Buffalo Office of the Vice President for Research and Economic Development Electronic.
PROPOSAL REVIEW AND SUBMISSION FYAP May 5, 2016 Julie Wammack Sponsored Research Administration.
RESEARCH ADMINISTRATION LEARNING PROGRAM August 2012 MRAM.
AISL PI Conference February 29, 2016 Division of Grants and Agreements.
NIH/AHRQ/NIOSH UPDATES effective January 25, 2017
“SPEAR” Workshop May 18, 2017 Julie Wammack
New Faculty Orientation Office of the Vice President for Research
RAS Overview August 2017 Presented by: Kathleen Bienkowski
SPONSORED PROJECTS INFORMATION NETWORK
AURA Meeting May 23, 2018.
Post-Award Grant Administration
KSU Sponsored Projects Overview
USF Research Integrity & Compliance
Presentation transcript:

Welcome to RAIN! Presented by: the folks in RDA with today’s emcee, Kara Drolet Date: February 19, 2015 Research Administration Information Network

RAIN Agenda Introduction Updates & timely information: SVPR OIA: Export Controls TTBD OPAM RATE ORIO RFDS USR Research & Academic HR CTO OCTRI Q & A 2 Tracy Zitzelberger RAIN:

SVPR - Office of the Senior Vice President for Research 3 RAIN:

Research Week 2015: Call for abstracts –May 4-8, 2015 –Registration is now open on ConfToolnow open on ConfTool –Deadline for submission is March 17 4 SVPR: Office of the Senior Vice President for Research Bekki Witt RAIN:

Research Week skill development workshops –How to Give a Scientific Talk: Mar. 16 –Data Visualization: Apr. 7 –Preparing a Poster: Apr. 9 More information is available on Research NewsResearch News 5 SVPR: Office of the Senior Vice President for Research Bekki Witt RAIN:

6 Questions? Website: ohsu.edu/researchweekohsu.edu/researchweek SVPR: Office of the Senior Vice President for Research Bekki Witt RAIN:

7 Equipment Monitoring Coming soon to a lab near you! All equipment alarms connected to the Fire and Safety monitoring system will be replaced by Aeroscout Monitors. SVPR: Office of the Senior Vice President for Research Dana Director RAIN:

8 Aeroscout Monitor Highlights Data wirelessly sent to central database every 5 min. Custom temperature, humidity, voltage thresholds Alert notifications in 5 minutes of threshold breach , text, and phone call notifications Alert escalation – alert to second tier contacts if alarm state persists Reasonable cost, long-life, AA battery lasts 3 years Daily, Weekly, Monthly data trend reports SVPR: Office of the Senior Vice President for Research Dana Director RAIN:

9 Types of Monitoring Temperature (-200°C to +140°C) Humidity ( 5% to 95%rh ) Voltage (2.5V to 30V) Physical Location (all monitors track physical location) SVPR: Office of the Senior Vice President for Research Dana Director RAIN:

10 Pricing Depending on monitoring needs, all-inclusive prices range from $185 - $310. (This includes any licensing fees picked up by labs.) SVPR: Office of the Senior Vice President for Research Dana Director RAIN:

11 For more information, contact: Craige Mazur Watch Research News for more on equipment monitoring. SVPR: Office of the Senior Vice President for Research Dana Director RAIN:

OIA: Export Controls - Office of International Affairs: Export Controls 12 RAIN:

OIA: Export Controls International Travel All international travel needs to be pre-screened. Quick and easy. Located on the Office of Export Controls website under “International Travel”.Office of Export Controls website Jen McCaw 13 RAIN:

OIA: Export Controls International Travel System will protect travelers from unknowingly meeting with restricted parties. OHSU will process any needed export permits for travel, if required. Note: First time registration needed. Jen McCaw 14 RAIN:

Mobile Devices Know WHAT is on your device BEFORE travel. Information and data may carry restrictions. Encrypted information may still require export license. Be sure to complete the Certification Document and carry a signed copy with you when traveling. 15 OIA: Export Controls RAIN: Jen McCaw

16 Questions? Jen McCaw (503) Office of Export Controls OIA: Export Controls Jen McCaw RAIN:

TTBD - Technology Transfer & Business Development 17 RAIN:

TTBD: Technology Transfer & Business Development TTBD Lunch & Learn Presentation “An OHSU Licensing Case Study: Discovering new Human MR Imaging Biomarkers” Thursday, February 26, :00-1:00PM Mackenzie Hall 2201 Add to your Outlook Calendar Add to your Outlook Calendar or for an event invite. Andrew Watson 18 RAIN:

Winter TTBD Newsletter Look for late Feb release in Research News OHSU Conferences Aim to Bring Together Inventors, Investors and Industry What happened at the OHSU Startup Symposium? Commercialization of an MRI Breast Cancer Technology New TTBD Staff Members Subscribe today: Andrew Watson 19 TTBD: Technology Transfer & Business Development RAIN:

20 Questions? TTBD Office Website: Andrew Watson TTBD: Technology Transfer & Business Development RAIN:

OPAM - Office of Proposal & Award Management 21 RAIN:

OPAM: Office of Proposal & Award Management Effort Reminder Jul-Dec 2014 effort period is closed Forms distributed from OPAM on February 25 Class: Effort Certification/Salary Cap Refresher on March 10 – enroll via CompassCompass Policy & Compliance: Charlie Resare 22 RAIN:

OPAM: Office of Proposal & Award Management New Participant Support Cost Policy Clarifies Uniform Guidance Requirements: How to use cost category What types of costs qualify Prior approval requirements Link to Policy Policy & Compliance: Charlie Resare 23 RAIN:

OPAM: Office of Proposal & Award Management NIH Interim Grant Conditions Uniform Guidance Pre-Award Changes Waived Prior Approval for Fixed-Price Subawards 8% F&A for Foreign Subawards NIH source here.here Grants Management: Nancy Duncan 24 RAIN:

OPAM: Office of Proposal & Award Management NIH Interim Grant Conditions Uniform Guidance Post-Award Changes Administrative and Clerical Staff as Direct Costs: Integral to Project Allocable Not Recovered as Indirect Costs Included in Budget or Prior Written Approval Grants Management: Nancy Duncan RAIN:

OPAM: Office of Proposal & Award Management NIH Applications Zip + 4 Applications without zip code + 4 for non-OHSU performance sites and non-OHSU key personnel (as required) are encountering submission errors. Be sure to check! Pre-Award: Aric Dutelle RAIN:

OPAM: Office of Proposal & Award Management NIH Applications NIH Biosketch New format allows applicants to include URL link to a full list of their published work. When including that link, spell the URL out in full, beginning with ‘ (e.g., Do not use hyperlinked text (e.g., NIH Grants Web page). eRA system processing will not retain the active link in the assembled application image in eRA Commons. NIH Grants Web page Pre-Award: Aric Dutelle RAIN:

OPAM: Office of Proposal & Award Management NIH Applications Special Characters NOT-OD NOT-OD NIH announced that Unicode characters such as Greek letters are functional in Grants.gov as of 2/17/15. However, OHSU investigators should NOT use these codes yet. Grants.gov is accepting them, but most other systems still can not. InfoEd and many other federal grant submission systems and reporting databases (e.g., usaspending.gov) cannot currently support special characters. Pre-Award: Aric Dutelle RAIN:

OPAM: Office of Proposal & Award Management NIH Applications More on Special Characters NOT-OD NOT-OD Adobe forms may seem workable for InfoEd but place extra burden on PIs and staff. A generic InfoEd record would still be required and would need to be thoroughly reviewed by department staff and OPAM to ensure accuracy in translation of special characters. More details on this are available in Research News.Research News Pre-Award: Aric Dutelle RAIN:

OPAM: Office of Proposal & Award Management Grants.gov Submissions Grants.gov Recommends Submission Hours PRIOR TO DEADLINE Institutionally, the average is nearly hours for submissions to clear Grants.gov to non-NIH sponsors. Please take this into consideration when assembling and routing proposals requiring Grants.gov submission. Pre-Award: Aric Dutelle RAIN:

OPAM: Office of Proposal & Award Management Uniform Guidance Changes Closeout Deadlines Payment Management System (PMS) 90 days from award end date Final Financial Report (FFR) 120 days from award end date for NIH and NSF awards only. No further draws or FFR revisions are possible past this time frame. Post Award: Pat Cloteaux 31 RAIN:

RAIN: Questions? OPAM Central: OPAM Online OPAM: Office of Proposal & Award Management

RATE – Research Administration Training & Education 33 RAIN:

RATE: Research Administration Training & Education Margaret Gardner 34 Upcoming Classes  Effort Certification/Salary Cap Refresher March 10  Oracle Grants Accounting March 11  Training Grants & Fellowships March 24  RDA 101: Intro to Research Administration April 9 Enroll through Compass. Compass RAIN:

RATE: Research Administration Training & Education Margaret Gardner 35 Website refresh Changes to RATE and RAIN pages Big thanks to all who helped with photos! Navigation issues being addressed. Find help at RAIN:

ORIO –OHSU Research Integrity Office 36 RAIN:

ORIO CoI: Conflict of Interest Update to eCoI Disclosure System  Managers can now use eCoI to generate department compliance records.eCoI  Multiple signature notices Every 14 days for disclosures awaiting signatures. Kara Drolet 37 RAIN

38 Questions? Kara Drolet, ORIO Associate Director Conflict of Interest site. RAIN ORIO: OHSU Research Integrity Office

ORIO IRB: Institutional Review Board Upcoming Changes: IRB Reporting Requirements Unanticipated Problems (UPs) and Protocol Deviations (PDs) Reportable New Information (RNI) Andrea Seykora 39 RAIN:

Upcoming Changes: IRB Reporting Requirements New policy will roll out concurrently with new eIRB system. RNI submission pathway. Studies report per new policy upon transition to new system. ORIO IRB: Institutional Review Board Andrea Seykora RAIN

Differences in reporting requirements ORIO IRB: Institutional Review Board Andrea Seykora Will no longer be reportable New reportable items (sort of) Deviations not due to any action or inaction of the researchers AND did not increase risk to subjects Audit and monitoring reports with any deficiencies RAIN

Rationale for Changes “PD versus UP” is not a regulatory distinction. No need to know about things that were “out of your control” – unless increased risk of harm. Audit and monitoring reports help identify Continuing Noncompliance early. Submitting an audit/monitoring report as a single RNI submission streamlines reporting. ORIO IRB: Institutional Review Board Andrea Seykora RAIN

Reportable New Information (RNI) still NOT required for: “Minor” protocol deviations (though the term is going away). Adverse events that were expected. Adverse events that were unrelated to the study. Monitoring reports and DSMB/C reports with no findings or recommended changes. We’ll ask about these at continuing review. ORIO IRB: Institutional Review Board Andrea Seykora RAIN

ORIO IRB: Institutional Review Board Andrea Seykora Specialized Training There are lots of changes heading your way!! IRB staff is happy to attend your regular department meeting or set up a separate session for specialized training. Please contact Dave Holmgren or the analyst assigned to your department to schedule a visit.Dave Holmgren RAIN

IRB Brown Bag Special Series eIRB Upgrade – Mods & CRQs Thursday February 26 th 11:30 a.m. to 1:00 p.m. in UHS 8B60 This Brown Bag will provide an overview and demonstration of the modification and continuing review submission process in the new eIRB system. You will see the new modification and continuing review questionnaires and learn how the new system improves upon the current process. Andrea Seykora 45 RAIN ORIO IRB: Institutional Review Board

IRB Brown Bag Special Series eIRB Upgrade – RNIs Tuesday March 10 th 2:00 p.m. to 3:00 p.m. in UHS 8B60 The new eIRB system will handle reporting of Unanticipated Problems and Protocol Deviations through a single pathway called “Reportable New Information (RNI).” In addition, we are revisiting the policy on what items will require investigators to submit a report. This brown bag will introduce you to the new reporting requirements and the process for submitting RNIs via the new eIRB system. Andrea Seykora 46 RAIN ORIO IRB: Institutional Review Board

IRB Classroom Training 11:30 to 12:30 p.m. in CHH 3178 Introduction to IRB February 19 (Today!) April 16 IRB Q&A March 19 May 21 Register through Compass.Compass 47 Andrea Seykora ORIO IRB: Institutional Review Board RAIN:

48 Questions? Andrea Seykora, Assistant Research Integrity Officer RAIN ORIO: OHSU Research Integrity Office

Wrap Up Q & A Next RAIN Meeting: March 19, 2015, 9:30 – 11:00 a.m. Send agenda item requests to: Or use the RAIN Feedback FormRAIN Feedback Form Everyone 49 RAIN: