How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Hoop House Construction. Parts of the hoop house Frame Hoops Braces Plastic cover.
Engineered Wall Panels by: Slide show will advance automatically. At any time, you may use the left arrow to back the slide show up, or the right arrow.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Optimum Round Pool Instructions. Prepare the pool site Remove all the grass on a surface 2’ wider than the size of the pool Level the ground.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
How to Build a Hovercraft October Patrick Wenzell How to Build a Hovercraft A Cobb County Technology-Based Integration School Special Thanks to.
Competency: Draw Wall Sections
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Installing a double Dreamscreen. Check measurement Left.
Kwikset Rekey Ultramax Rekeying the Ultramax by Kwikset this presentation is designed for beginners.
Split Sole 45 Degree Raker
Typical Walk-in Closet with elfa® décor
Stable Rise –Pull and Swivel Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
The Little Nikki Assembly Instruction By Laser Dollhouse Designs.
Installing Fences and Walls Ms. Gripshover Landscaping Unit 19.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Foundation Systems.
Gable, Gambrel, and Shed Roofs
Building with PolySteel. #1Footings Install standard (level) footings with rebar placed at the intervals required by your building design, as outlined.
By:Gord Darling Construction Technology
Solid Sole 60 Degree Raker
SANUS SYSTEMS THE UNION OF FORM AND FUNCTION Sanus Systems 2221 Hwy 36 West. St. Paul, MN
Floor Systems and Foundation Support
How to build a small inexpensive low-tunnel hoop house.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
CONSTRUCTING A FIVE CABIN LATRINE
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
COMMERCIAL SERIES TRI-POINT ANCHORING SYSTEM
Constructing Homes and Other Buildings
SHED CONSTRUCTION A Visual Guide. C.A.D. Example.
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
Installation. Indoor Unit Installation Typical Installation.
Balloon Frame North-American invention, 1833
Chapter 35 Section Layout.
RESIDENTIAL CONSTRUCTION UNIT Grade 10 Construction Technology TCJ200.
1. b. Rip Saw 2. d. Used for cutting with the grain.
Hand Tools, Fasteners, and Hardware
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
Ag Construction Studs Vertical framing boards are called.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Definitions of terms associated with concrete masonry units A.Masonry Units: Blocks made from concrete, cinders, or other aggregates. B.Laying Block:
How to Build a Divider Wall By Charysse Roberson.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
BLUEPRINT READING The ability to do basic drawing and read blueprints are valuable skills needed in all areas of construction. Students do a simple sketch.
House Construction.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
COMPONENT IDENTIFICATION AND INSTALLATION GUIDELINES FLOODBREAK, AUTOGATE FloodBreak, L.L.C Post Oak Blvd., Suite 5850 Houston, Texas
Floor Systems and Foundation Support
Footings & Foundation Prepared By: (Vanani Sanket) Department of Civil Engineering B.H.Gardi College of Engineering & Technology.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Rotating Compost Barrel Construction
Mezzanine Build Plans.
VIEW SERIES with Sliding Door
Leads Institute of Technology & Engineering
Installation Walkthrough Image Guide
Concrete Lesson 2: Site Preparation
Foundation – jay Desai.
Objectives Describe the fasteners, anchors, and adhesives used in construction and explain their uses. f. Identify various types of mechanical anchors.
Objective 6.02 part 1: Recognize components of construction
How to Build a House.
Mounting a BalanceBox®650 to a brick wall
Think About it….. Jot down everything you think you know about residential wall framing. Hint: think about what you already know about floor framing.
Presentation transcript:

How to Build Your Playhouse. September 08, 2006 By Kay Adams, Tamecha Buck, Janet Herron & Lisa Weston “Click on pictures”

Introduction Building a playhouse for your children should be both fun and easy. We have designed all of our kits to contain everything you need with minimum assembly. Here are a list of the tools and site preparation you will need for a smooth process:

Building Construction All kits are already cut and finished to your package specifications. Railing, steps, trim, posts and roof vents are sent separate from the building kit. Sill plates are pre-drilled to allow anchor bolts to be attached to the slab.

Required Tools Power Drill #2 Phillips head drill bits ½” Concrete drill bit Square Chalk line Ruler Shims Hammer Pry bar ½” Socket wrench (4) 2”x4”x12” studs 4’ Level – used to plumb Hardware package included with kit

Building a Playhouse First, gather directions listed under the “lessons” tab of this Web site Look at the list of “required tools” and make sure you have them Obtain “hardware package” –included with kit

Building a playhouse (con’t) First prepare site playhouse will be built upon-remember twice as large as the house Slab preparation Plumbing Electrical

Building a playhouse (con’t) Build form for slab. Make sure corners are square and that apron will have a ¼” drop per foot away from the building. Position 6x6 10/10 WWM. (Woven Wire Mesh) where slab will be poured

Slab Preparation Excavate 12” deep around entire building site Place electrical hook-ups and rough plumbing where desired Lay drainage pipe around perimeter-at least 12” away from building for drainage Cover drainage tile with roofing felt to prevent clogging of drainage holes Cover entire site with peas gravel 6” deep Place 2” of sand on top of gravel, level and compact Use 4 mil plastic to cover compacted area Use 2x4’s to form slab – make sure there is at least ¼” fall per foot Spread wire mesh within the formed area Pour 4” of concrete over wire mesh

Assembly Use ruler and chalk line to mark wall placement – make sure they are square. Start assembly with back wall - Mark pre-drilled holes on slab – Drill holes at least 3” deep – place wall over drilled holes and screw in the 6” anchor bolts provided – screw temporary studs high on each end of the wall and anchor them to the ground for support. Place either the left or right wall on the inside of the back wall and mark and drill the holes as above. After wall is in place, hand tighten the anchor bolts. Check for plumb and square before attaching wall completely. Repeat process for other wall.

Assembly (con’t) Place front wall to match up with side walls. Mark and secure wall as above. Remove all support studs and replace all trim if applicable. Temporarily place railings on slab as indicated in drawing. Square them to the building and mark the slab where posts are to go. Drill holes and secure anchor bolts. Secure railings to anchors and attach with provided screws. Lift half of roof into position ensuring the notched rafters are resting on the top of the double top plate on one of the side walls. Toe nail the roof section and repeat same process with other half of roof. Attach ridge vent to peak of roof and secure.

Assembly (con’t) Anchor posts to slab. Place front steps between opening in railing at the front of the slab if needed and secure in place. Backfill site if needed. Remove all packing from windows and doors. Complete any optional features. Playhouse is complete and ready to be used.

Conclusion Please contact us at with any questions you may have. We appreciate your business and hope you are satisfied with the craftsmanship and quality of your new playhouse.

E-Assessment How do you like this site?_____ Is this site informative?_____ Is this site user friendly?______ Do all navigation buttons function?______ Do most pictures have some sort of animation that works?____ Do you have any suggestions?_____ Thank you for viewing this site!