TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.

Slides:



Advertisements
Similar presentations
Rods Schedule and Issues J. Incandela University of California Santa Barbara for the TOB Rod Group Tracker Integration Meeting October 27, 2005 Slides.
Advertisements

Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
1 Hybrid & Module Testing Status Week of 4/25-4/29.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the TOB Group Tracker General Meeting December 7, 2005 Slides.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
Status of the Tracker Outer Barrel J. Incandela University of California Santa Barbara for the illustrious TOB Group Tracker General Meeting October 26,
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 Hybrid & Module Testing Status Week of 6/6-6/10.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
3 May 2005Claudio Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last two weeks Reporting for: Dan Callahan Susanne Kyre Stephen.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
28 June 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Slide 1Susanne KyreTracker week, October 2005 TEC/TOB bias bonds Susanne Kyre University of California, Santa Barbara.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Radiation Laboratory Meeting
FNAL Production Experience
Hybrid & Module Testing Status
Update of US Testing Status
Hamburg Bonding Report
Results from module testing
Vienna Module Production
FNAL Module Testing Status
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
FNAL Module Testing Status
Hybrid & Module Testing Status
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
Hybrid & Module Testing Status
Operations/Failure Analysis
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Failures on Rods
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Presentation transcript:

TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A. Affolder, C. Bloch, C. Campagnari, A. Dierlamm, E. Shabalina, A. Onnela, D. White… and others for sure.

September 21, J. Incandela- TOB Status – CERN, CMS Week 2 Module Assembly Issues TOB module production was slowed due to concerns about HV Bias Long term performance instability of the conductive epoxy led us to backside wirebonding for each sensor on all modules. Treatment of new TEC and TOB modules underway Procedure for previously completed TOB modules understood. Retrofit of all stored modules to start next week complete before rod production starts again in November No impact on TEC schedule is expected. TOB module production now back up to high rates Rod assembly on hold awaiting for replacement Inter-connect Cards. Must now store a much larger than planned number of modules. Preparations for TEC at FNAL UCSB R7 plate designs have been adapted to FNAL gantry Manufacture of parts to start soon

September 21, J. Incandela- TOB Status – CERN, CMS Week 3 Production so far…

September 21, J. Incandela- TOB Status – CERN, CMS Week 4 US ARCS Testing Results 2675 Total Tested 2945 Grade A 11 Grade B 26 Grade F This week: 111 of channels bad (0.14%) WIEN BOX: 3 modules have failed in LT

September 21, J. Incandela- TOB Status – CERN, CMS Week 5 All Modules Total Production: 1248 of channels bad (0.065%)

September 21, J. Incandela- TOB Status – CERN, CMS Week 6 Completed fractions

September 21, J. Incandela- TOB Status – CERN, CMS Week 7 Backplane bias issues UCSB study showed evidence for decreasing conductivity with time in sensors with backside scratching and extra Ag epoxy points. FNAL Confirmed with lower stats From previous measurements the problem was understood to be the contact between the Ag epoxy and the aluminized sensor backside (and not the Ag-Au connections).

September 21, J. Incandela- TOB Status – CERN, CMS Week 8 U.S. Module Production For new modules we solder gold- Kapton tabs to the gold rings on the unused vias and wirebond to sensor backplanes. Still apply Ag epoxy to standard pads. And also use it to adhere extension pads to the backplane. 15 wirebonds per sensor Encapsulate with Sylgard 186 Extension pads don’t affect sensor positioning during module assembly. UCSB has bonded to an existing pad on the frames of over 200 TEC modules and has ARCS tested these. No evidence of any damage.

September 21, J. Incandela- TOB Status – CERN, CMS Week 9 Backside Bonding – TEC Modules Bonds height average 0.30 mm. 20 modules wirebonded < 1h Bond pull strengths have all been over 7 grams. The encapsulant height can be close to the frame thickness. To make sure we do not go outside this envelope, we will squeegee off any excess to constrain to 0.80 mm height.

September 21, J. Incandela- TOB Status – CERN, CMS Week 10 UCSB Existing Module Modifications This Week A B F Cumulative A B F A or B L12pu % L12pd % L12su % L12sd % L34p % L56p % R5N % R5S % R % R % Total % No evidence for additional noisy channels or pinholes.

September 21, J. Incandela- TOB Status – CERN, CMS Week 11 Existing Module Modifications (FNAL) At FNAL we are planning on soldering an insulated wire from the HV point on the top side to a pad bridging the two sensors on the backside. Situation different due to extra silver epoxy point and Gantry assembly plate style. Does avoid the use of silver epoxy in the electrical connection. Needs to be checked that rods built with such modules do not have additional noise. UCSB will use this in cases where silver epoxy has completely covered the via ring.

September 21, J. Incandela- TOB Status – CERN, CMS Week 12 Module Storage Modules are stored on aluminum plates in commercial cabinets. ESD shelving Dry air circulation 200 modules per cabinet We are currently storing 2400 modules ! We will need to add storage for >600 modules while waiting for rod assembly to restart

September 21, J. Incandela- TOB Status – CERN, CMS Week 13 Rod Production Mostly on hold awaiting new I2C cards Building DS rods now for CRACK Start sustained production exercise (40 rods per site) very soon Internal workshop in August to converge on remaining loose ends Minutes Some of the issues discussed Agree on default long term standard scenario: 2 day, go cold 4 times "Finalize" cuts to flag bad channels Module grading: Same as ARCS Rod grading - Pass if: Only A or B modules ≥ 1 out of 3 non-DCU thermistors OK I(leak) for all groups < 20  A XML file for DB Went over it line-by-line

September 21, J. Incandela- TOB Status – CERN, CMS Week 14 I2C Errors All indications are that the problem is completely solved with the new IC cards. However… In US test stands, we still have some occasional ones (64,68,72…) Do not really affect testing Much progress done at CERN – Now believed to be completely understood and will be eliminated. We agreed to stop I 2 C studies in US. Concentrate on production readiness. New ICC Cards About to have enough in hand for 20+ rods to start final rod installation in early November! Focus now on preparation for high rate Rod production in US. Need: Shake out last kinks in production cycle (40 rod exercise). Definition of Digital tests. Some DB details to be sorted out.

September 21, J. Incandela- TOB Status – CERN, CMS Week 15 Developments at CERN Tests performed on rods at CERN indicate that residual I2C problems are negligible. Another change with the IC card is the potential to change the rod grounding. The new design of the Interconnect-Cards allows an additional ground connection (power return to cooling pipe). Tests performed with Cosmic Rack were performed to understand if the additional ground connection is to be implemented or not.

September 21, J. Incandela- TOB Status – CERN, CMS Week 16

September 21, J. Incandela- TOB Status – CERN, CMS Week 17 Rods Acceptance at CERN Number of tested rods: 25 Rod types: SS4_H: 6 x Type 3 SS6_L: 4 x Type 3 SS6_H: 2 x Type 1, 2 x Type 2, 11 x Type 3 NO rod rejected ! Test of 3 rods takes ~ 6h

September 21, J. Incandela- TOB Status – CERN, CMS Week 18 TST-TOB integration test, July 2005 The TOB fits! … even if clearances reduced from nominal 10 mm to 2-3 mm at thermal screen connections. Further clearance losses must not happen.

September 21, J. Incandela- TOB Status – CERN, CMS Week 19 TST-TOB integration test, July 2005 A perfect match inside the TST!

September 21, J. Incandela- TOB Status – CERN, CMS Week 20 TST-TOB integration test, July 2005 Final TIB layer 4 backward + mock-up TID inside the TOB. Inner Rails function as required, clearances ok.

September 21, J. Incandela- TOB Status – CERN, CMS Week 21 Rod to Wheel insertion Selecting the Rod. Helium leak test of the Rod cooling pipe and Connection of the optical ribbon Optical ribbon attached to installation fork.

September 21, J. Incandela- TOB Status – CERN, CMS Week 22 Rod to Wheel assembly Rod installation tool aligned with a “Pre-Rod” Rod attached to the installation tool at comfortable height and orientation. Installation tool supported from the Wheel

September 21, J. Incandela- TOB Status – CERN, CMS Week 23 Alignment tube prototype Alignment tubes supplied by Aachen.

September 21, J. Incandela- TOB Status – CERN, CMS Week 24 To do Test insertion and pipe soldering of a Double-Sided rod Prepare of lab 186 (upstairs) for present integration work He, dry air, C6F14 lines, He leak detector Assembly of the Cooling segment with 19 FNAL “Pre-Rods” Pipe soldering, Cabling, Functional tests (power, ctrl, read-out) Development and testing of work platforms, tooling, etc. Get ready (by end of October) to start final Rod assembly Dismount pre-assembled Cooling segment 2.6.2, Production and testing of all cooling manifolds (88-2) Cable supports for the Wheel and for the Thermal Screen Prepare equipment for Wheel transport to downstairs 186 Solve all unforeseen…

September 21, J. Incandela- TOB Status – CERN, CMS Week 25 Schedule FIRST RODS FOR FINAL INTEGRATION AT CERN: rods finished and shipped to CERN by Oct. 14 SS6-H type 1,2,3: 1,1,15+1 US to study ICC swap in-line with production US Rod production ramp and rates Agreed today on ramping up to 4 rods per day at each site starting in November With 20% contingency, the rate is 130 rods per month delivered to CERN. MonthTOB+TOB- Buffer or Deficit at 3/d/site Buffer or Deficit at 4/d/site Oct020 Nov Dec Jan Feb Mar Apr Totals

September 21, J. Incandela- TOB Status – CERN, CMS Week 26 In summary, things are going well

September 21, J. Incandela- TOB Status – CERN, CMS Week 27 Backup slides

September 21, J. Incandela- TOB Status – CERN, CMS Week 28 Hybrid Testing (as of Sep. 10) WeeklyCumulative PassFailPassFail% Pass L12su % L12sd % L12pd % L34p+L12pu % L56p % R2N % R2S % R5N % R5S % R % R % Total %

September 21, J. Incandela- TOB Status – CERN, CMS Week 29 US Module Assembly (as of 9/16) TOB 45% complete Will be 48% by end of this week ~650 TEC complete TOB 45% complete Will be 48% by end of this week ~650 TEC complete