Team 7, Final Presentation December 1, 2011. Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and.

Slides:



Advertisements
Similar presentations
Team K^3 + C Final Team Presentation Khin Oo, Kim Gleffe, Carlie Bolin, Katelyn Harder AEM /16/11.
Advertisements

Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
Matt Breihan, Jay Davis, Jack Gregory, Ashton Schrage, Sara Schuette, and Lydia Whitney October 14, 2008.
Space Debris Conceptual Design Review Cole Bostrom Corey Godwin Jonathan Kirchmaier Emily Logan Sean Murphy Seanna Renworth
Pegasus MSF SatElysium Jordan Burns, Brenden Hogan, Miranda Link, Cody Spiker, Chris Dehoyos, Hemal Semwal November 29, 2011 Final Presentation.
Team Six-Pack Launch Readiness Review Calder Lane, Courtney Ballard, Ian Thom, Thomas Green, Matt Cirbo, Janelle Montoya 11/29/11 Fall 2011 Rev A
Pegasus MSF SatElysium Launch Readiness Review Jordan Burns, Brenden Hogan, Miranda Link, Cody Spiker, Chris Dehoyos, Hemal Semwal November 1 st, 2011.
Team Space Jam Launch Readiness Review Paul Guerrie, Ben Azlein, Megan Scheele, Bridget Chase, Shane Meikle, Taylor King, & Jamie Usherwood November 2,
TEAM kkkkk Conceptual Design Review Saad Alqahtani, Charles MacCraiger, Alexa Warly, Connor Jacobson, Kyle Skjerven, Matt Busby 09/19/11 Fall 2011 Rev.
Team R3D3 Critical Design Review Kate Kennedy Greg McQuie Nicole Ela Henk Wolda Marisa Antuna Devon Campbell Tyler Smith 10/04/11.
Adam Archuleta Katie Cartee Logan Farley Patrick Klein Kamron Medina Catherine Villa TEAM INFINITY AND BEYOND LAUNCH READINESS REVIEW Fall 2011 Rev C
The Wright Stuff Conceptual Design Review Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata September 20th 2011 Fall 2011 Rev.
Team Poptarts Final Presentation Saad Alqahtani Kyle Skjerven Charles MacCraiger Connor Jacobsen Matt Busby Alexa Warly Corinne Desroches 11/29/11.
Brynn Larson Trey Karsten Terek Campbell Marcus Flores Marcell Smalley Shunsuke Miyazaki 2015/6/10 Team Ochocinco.
BalloonSat “Optimism Prime” Team “Thumbs Up” Conceptual Design Review Nick Lenk, Greg Nelson, Eddie Cyrus, Jake Varey, Chase Pritchett, Brian Inglis 9/23/08.
Team icarus Final Project Presentation AJ Knapp, Kyle Marek-Spartz, Lucas Chowen, Max Sjöberg, Mike Hill AEM 1905 – Nov. 24 th 2009.
Paul “Trey” Karsten Marcell Smalley Shunsuke Miyazaki Brynn Larson Terek Campbell Marcus Flores 11/25/09 Final Revision.
Team Name Final Presentation Team Members Date Fall 2010 Rev A
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn October 17, 2006.
Team R3D3 Final Presentation Devon Campbell Greg McQuie Kate Kennedy Henk Wolda Marisa Antuna Nicole Ela Tyler Smith 12/1/11.
Team Mate Launch Readiness Review Jason Schelz, Will Hakes, Emma Mossinger, Ethan Long, Brendon Barela, Amelia Weller 11/02/10.
Team T.E.N Final Presentation Nate Bolt Greg Frank David Maier Luke Pederson David Stagg Matthew Stephenson 12/05/2006.
Teamo Supremo Final Presentation Kristen Brenner Kim Fornall Ahna Isaak Nick Martinez Wes Roos Bart Tofany RevD
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata November 1, 2011 Team #7 The Wright Stuff Launch Readiness Review.
Team Cutthroat Critical Design Review Chris Alley Annie Frederick Josh Marshman Julie Price Lance Tokmakian Kent Welborn December 7, 2006.
Final Presentation Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani December 5, 2006.
Garlic Armageddon BioSat Lauren Persons, Ryder Whitmire, Lenny Komow, Kirstyn Johnson, Jon Pfohl, Dave Borncamp October 6 th 2009.
GONS Final Presentation Steven Benedict Jake Danser Josh Hecht Brock Kowalchuk Erik Shuttlesworth Matthew Zemel December 4, 2007 Steven Benedict Jake Danser.
1 Student Hands On Training I (2009) Additional AVR Modifications For BalloonSat Flight Additional AVR Modifications For BalloonSat Flight.
Team Name Final Presentation Team Members Date Rev
Colton Hall, Brendan Lee, David Thomas, Zak Collins, Eli Nelson, Devin Bazata October 6, 2011 The Wright Stuff Conceptual Design Review.
Critical Design Review Nick Hoffmann Miranda Rohlfing Geoff Morgan Miles Buckman Lauren Wenner Rahul Devnani October 17, 2006.
Team DSRO Critical Design Review Taylor Boe Andrew Buckner Andrew Gilbert Emily Howard Grace Harsha Bobby Stillwell October 14, 2008.
Team Hubble Jr. Final Presentation Rachel Small, Holly Zaepfel, Ryan Del Gizzi, Kyle Norman, and Evan Levy December 5, 2006.
Launch Readiness Review 11 Nov Brady Phillips, Elliot Guber, Brandon Campbell, Dushyant Dhundra, Joel Mendez, Cameron Trussell.
Critical Design Review Riley Pack, Sebastian Seeds, Greg Stahl, Paul Loeb, Nic Zinner, Pierce Edwards October 17, 2006 Project Frankenfine: A Near Space.
JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN TUCKER JAKE BINNEY JAMEY GRAHAM LOUISE MARTINEZ JACK OAKES MARCUS RAHIMPOUR ERIN.
CDR Presentation. - Team T.E.N.’s objectives are to fly Ralph with all the systems functioning properly. This includes the boom arm, radiation badge,
Space Debris Launch Readiness Review Seanna Renworth, Emily Logan, Corey Godwin, Sean Murphy, Cole Bostrom, Jonathan Kirchmaier November 11 th, 2008.
Conceptual Design Overview
SPIRIT of the Koala Project VOLT Critical Design Review Anthony Anglin, Colin Harkins, Dylan Cooper, Thomas Jefferies, Starteya Pais, Joao Mansur, Andrew.
Lucas Ibarra Alexis Sutker Evan Long Jack Oblack Jaevyn Faulk Dylan Anderson Devon Connor Eric Hardwick October 18, 2012.
Hang Seven Launch Readiness Review Lucas Migliorini, Becca Lidvall, Paul Smith Chase Goodman, Ethan Hollenbach, Nikhil Desai, Abby Caballero, Sierra Williams.
Team Victorious Secret Final Presentation Crawford Leeds Jacob Broadway Tanya Hardon Devan Corona Dylan Reed November 29, 2011.
Team Hang 7 Final Presentation Lucas Migliorini, Sierra Williams, Chase Goodman, Ethan Hollenbach, Becca Lidvall, Abby Caballero, Paul Smith, Nikhil Desai.
Hang Seven Critical Design Review Sierra Williams, Lucas Migliorini, Abby Caballero, Chase Goodman, Paul Smith, Becca Lidvall, Ethan Hollenbach, Nikhil.
Sam Bukowski, Emily Daugherty, Chris Lewin, Troy Hayes, Natalie Schaefer, Matt Vaninger November, 2011.
Zachary Cuseo, Andrew Fruge’, Tyler Knappe, Christopher Nie, Sydni Smith, and Shweta Maurya 5 November, 2009.
Space Monkeys Launch Readiness Review Project Curious George November 11, 2008 Project Curious George November 11, 2008.
Team Up, Up, and Away Final Presentation Trevor Arrasmith, Ty Bailey, Cameron Coupe, Samuel Frakes, Brandon Harris, Carolyn Mason, Soo Park, Peter VanderKley.
Team Honey Badger R.A.H.D. Final Presentation Team Members: Kyle Daniels, Logan Harrop, Annie Kelly, Gabe Frank Jason Leng, Karyn Perdue, Josh Whipkey,
Team Name Final Presentation Team Members Date. User notes –You may reformat to fit your design but make sure you cover the following points –You may.
Napoleon Connor Strait | Chris Gray | Chad Alvarez Akeem Huggins | Ashley Zimmerer Tucker Emmett | Ginny Christiansen |Caleb Lipscomb Conceptual Design.
Quinn Kostelecky, Vincent Staverosky, Gloria Chen, Roshan Misra, Jacqueline Godina, Raymond Auyeung Fall 2011 Rev C
Super 8 Conceptual Design Review Project “Morpheus” Fall Scott Wurst Jorge Cervantes Dan Nowicki Daniel Dewolf Evan Graser Anthony Lima Jonathan.
Junk in a Box Final Presentation Frank Becky, Kyle Cummings, Jordan Haines, Villiam Klein, Matt Peoples, Ryan Scott and Aaron Young 4 December 2007.
Team Hubble Jr. Critical Design Review Ryan Del Gizzi, Evan Levy, Kyle Norman, Chris Everhart, Holly Zaepfel, Rachel Small October 17, 2006.
PROJECT SCREAM PROPOSAL Josh Yeaton Kevin Dinkel Chris Kopacz Conrad Schmidt Chris Warren Dillon Thorse
S.H.I.E.L.D. CRITICAL DESIGN REVIEW Addison, Travis, Jared, Evan, Aaron, Matt 10/14/08.
Scott Luisi, Abe Fark, Trent Quick, Jack Szmanda, Tom Valkenberg AEM 1905, 11/20/2008.
Team S.H.I.E.L.D. Final Presentation
Skillz That Killz Team 3 Final Presentation
Team Go Go Gadgets Launch Readiness Review
Team Thumbs Up Final Presentation
S^3 Launch Readiness Review
Launch Readiness Review
Team Super 8: Sat Morpheus Final Presentation
Extremophile Collection and Identification
Team SCREAM Launch Readiness Review
Panoramic Rays Critical Design Review
Presentation transcript:

Team 7, Final Presentation December 1, 2011

Mission Overview Send up petri dishes containing bacteria Analyze the effects of temperature, pressure, and UV radiation on the bacteria Attempt to capture bacteria in tropopause in a sterile petri dish attached to a servo

Design Overview Petri dish attached to servo controlled by Arduino 3 other petri dishes HOBO, heater, camera Function Block Diagram Arduino Uno Parallax Standard Servo

Design Changes Funnel and holes added New petri dish seal Size reducedSpring added inside

Incubation of Bacteria Flight bacteria applied to LB (Luria Bertani) agar plate using sterile swab All dishes incubated for 5 days at 37 degrees Celsius Dish #1: Flight bacteria exposed to nothing Dish #2: Bacteria exposed to just UV Dish #3: Bacteria exposed to UV, low temperature, and low pressure

Dishes Before Incubation

Dishes After 1 Day of Incubation

Dishes After 5 Days of Incubation

Control Dishes Negative Control Positive Control

Bacteria Capture Dish Before Incubation Day 5 Day 1 No Growth

Analysis of Bacteria No bacteria collected from the tropopause o Broken seal o No bacteria growth due to dryness of agar Bacterial growth on all three flight dishes o Colonies for all three look different  Possibly not growing just E. Coli

Analysis of Bacteria Dish 3 looked similar to the control Dishes 1 and 2 had different color and shape o Sterile incubation techniques were used o Plates may still have been contaminated by bacteria in the air The negative control had no growth o Possibly because it was not exposed to the air long enough to be contaminated o Or because it was only incubated for 1 day

Predictions vs. Results Prediction: only the dish exposed to nothing would grow bacteria o All three dishes ended up growing bacteria Prediction: mission would successfully capture and grow bacteria from the tropopause o No bacteria grew in that dish

Sunrise Launch In tropopause during ascent Burst Times when petri dish was open In tropopause during descent Landing Black Line: External Temperature Blue Line: Altitude External Temperature and Altitude

Black Line: Internal Temperature Blue Line: Altitude Sunrise Burst Times when petri dish was open Launch Landing Near tropopause during descent Near tropopause during ascent Interior continues to warm after landing The satellite’s insulation caused interior temperatures to change after external temperatures; for instance, the coldest interior temperatures were recorded slightly after the satellite went through the tropopause. Note that the temperature dropped below the -10 degree mark due to failures in heating and insulation. Internal Temperature and Altitude

Black Line: Relative Humidity Blue Line: Altitude Relative Humidity and Altitude Launch Sunrise In tropopause during ascent In tropopause during descent Times when petri dish was open Burst Landing Satellite lying in moist grass in humid Nebraska (61% average humidity*). Relative humidity roughly increased as temperature decreased. *Source: state=NA&req_statename=NA

Pictures

Flight Recap Bacteria grew on all three flight dishes Broken seal and no growth for collection dish Insulation failure o Low internal temperature o Camera shut down

Failure Analysis Camera Failure o No pictures taken after first half of ascent  Caused by low temperature  Confirmed by cold test Structural Failures o Electronics dislodged  Faulty attachments  Lack of planning o Air Vent

Failure Analysis Continued Resealing Petri Dish Failure o Petri dish landed unsealed  Hard landing  Dish not supported by Foam Core underneath

Thermal Failure Insulation failure led to internal temperature of -50 degrees o Needed foam, not thermal blanket Results repeated in cold test o Showed problem was with insulation, not heater as in initial tests Test begins Test ends

Conclusions No bacteria were captured from the tropopause. We cannot conclusively state whether or not the bacteria we sent up survived due to some contamination. o The dish that was exposed to UV, vacuum, and low temperature had colonies that appeared similar to E. Coli so that bacteria apparently survived.

Lessons Learned: Improvements for Next Flight Use quartz glass petri dishes for the dishes exposed to UV o Plastic absorbs much of the UV that passes through it Use an agar selective to E. Coli to ensure only E. Coli is growing Find a way to prevent the agar exposed to the vacuum from drying out Secure petri dish more securely to prevent the seal from breaking Use foam for insulation in addition to a thermal blanket

Ready to Fly Again Payload preparation o Sterilize petri dishes o Fill dishes with agar o Put bacteria in three dishes Payload activation o Press button to activate camera o Flip switches to activate servo and heater o Insert pin connecting servo arm to petri dish after arm has twitched to confirm activation

RFP Requirement Compliance RequirementRequirement Met Mission: test if bacteria can survive in near space Bacterial growth on all three flight dishes Mission: capture bacteria in the tropopause Attempted but failed: no bacteria collected Control the servo for deployment in the tropopause. Arduino Uno program deployed the servo very near the tropopause Heat the interior to a temperature of -10 degrees Celsius Failed: the interior temperature dropped to -50 degrees Celsius Measure temperature and humidity during flight HOBO collected data on temperature and humidity Construct the BalloonSat out of Foam Core The BalloonSat was made out of Foam Core

Cost and Weight Budgets Final Budget: Total Money Spent: $ Budget Remaining: $24.32 Mass: Total Mass Used: 805 grams Total Mass Sold: 30 grams Mass Remaining: 15 grams

Message to Next Semester Think of a mission that truly interests your team. If you care about what you might discover, you will find it much easier to stay motivated. Fight through the work; it's worth it. You will miss this class when it is all over. Make sure you put a lot of effort into the proposal and the whole project. You will need to do a lot of work to actually do well on it. DRESS UP FOR YOUR PRESENTATIONS! It took our class half the semester to figure that one out.