UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS

Slides:



Advertisements
Similar presentations
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Advertisements

1 ESA Facts Over the past few months, we have reported on the actual and potential loss of schedule contingency (the IEC has reported that their analysis.
East Side Access Outreach
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Index The Region: East Tunnel 8 Av / Fulton St IND – Completed8 Av / Fulton St IND – Completed 8 Av / Fulton St IND – Service8 Av / Fulton St IND – Service.
Positive Train Control Benefits
Index The Region: Regional Transit West East North West Side Access Downtown: Transit Lines Catchment Areas BACKNEXT INDEXEND Lower Manhattan Transit.
Fill in Agency Name on Master
6 th Street Water Main And Street Reconstruction 2013.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
APRIL 2014 CPOC LIRR SANDY RESTORATION PROJECTS. Active LIRR Sandy Projects PROJECT EAC Traction Power Substations64.1M Long Beach Branch Systems 56.4M.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
Architect of the Capitol (AOC) Presentation to American Council of Engineering Companies of Metropolitan Washington February 16, 2012.
Index The Region: Newark to Pelham Downtown: Lex Av IRT – 4, 5, 6 PATH PATH & Lex Av IRT – 6 Fulton Street Basic Alignment 2.8 BACKNEXT INDEXEND PATH-Lex.
U.S. 33 Northern Connector Alternative
1 Corey W. Hill Chief of Public Transportation May 20, 2008 May 20, 2008.
New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM.
Major Construction Completed
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
PIONEER HIGH SCHOOL WEST STADIUM PHASE 1. EXECUTIVE SUMMARY Erickson Hall (EHCC) was the awarded the Pioneer High School Phase 1 Construction Contract.
January Transportation Economic Outlook.
1 November Accomplishments: Design and Construction Began sanitary sewer, gas, waterline and electrical relocations between 18th and 23rd Streets Continued.
Implementing aggressive PM reduction on non-road construction equipment in Lower Manhattan Transportation Land Use, Planning and Air Quality 2007 Metropolitan.
WORKING IN THE DARK: Citizens Budget Commission October 20, 2009 IMPLEMENTATION OF THE METROPOLITAN TRANSPORTATION AUTHORITY’S CAPITAL PLAN.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
Current Construction Projects Major Projects Pinellas County.
MTA Regional Commuter Rail System. Bringing the LIRR to Grand Central Terminal (GCT) - Route Map.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
September 26, East Side Access Status Report to CPOC September 26, 2011.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
Green Line Extension Environmental Impact Report Public Scoping Session Somerville High School October 19, 2006.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
July Accomplishments: Authority and Design Build Contractor staff conducted the 3rd Urban Design committee meeting. Committee members viewed proposed station.
CENF – Civil Engineering Extension B887 Status – 02 October 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
US 36 Commuting Solutions Northwest Rail Westminster Segment/Eagle P3 Oct. 14, 2014.
Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
PROJECT OVERVIEW. 2 Green Line Extension Project 3 College Ave Ball Sq Lowell St Gilman Sq Lechmere Union Sq Washington St.
CENF – Civil Engineering Extension B887 Status – 18 September 2014 Done: (1/2) Preliminary civil engineering drawing and Functional specification approved.
1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
New York MTA Opportunities for
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
1 Eagle P3 Project Update FasTracks Monitoring Committee September 1, 2015.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
Stage 2 Light Rail Transit Program “In the ground ready”
Turning Ideas into Reality Presentation to Build NYC
Proximity to Opportunity IAH New Terminal C North
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
FY 2012 Status Report on the North Mainland (Ormond Crossings CRA)
Long Island Rail Road Capital Program New York Building Congress Transportation & Infrastructure November 13, 2014.
New York Building Congress
Florida Transportation Commission FY 2009
A r d m o r e T r a n s i t C e n t e r
25th Avenue Grade Separation
25th Avenue Grade Separation
Central Corridor - Light Rail Transit Metropolitan Council
Harbour Island Force Main Replacement
A133 IPSWICH ROAD SCHEME COMMUNICATION UPDATE ( )
Los Angeles County Metropolitan Transportation Authority
Lafayette Airport Commission New Terminal Program Update
Presentation transcript:

NEW YORK BUILDING CONGRESS MEETING MTA Capital Construction NOVEMBER 13, 2014 MTA Capital Construction

UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS Presented by David K. Cannon Sr. Director and Chief Procurement Officer Law and Procurement Department MTA Capital Construction

FORECAST SOLICITATION SCHEDULE 2015 CM007 Manhattan GCT Caverns, ESA Project Contract Range: Over $100M Anticipated Solicitation Release : January 2015 Contract Duration 40 Months CH057 Harold Structures – Part 3A, Westbound Bypass and D Approach Tunnel, ESA Project Contract Range: $50M - $100M Contract Duration 24 Months CH058 Harold Structures – Part 3B, Eastbound Reroute and D Approach Tunnel, ESA Project Anticipated Solicitation Release : September 2015 2

MTA Capital Construction CH057 Harold Structures – Part 3A Eastbound Bypass and D Approach Tunnel East Side Access Project Scope of Work This Contract is for earth and site work, utility relocations, track realignment, drainage, hazardous material abatement, demolition of existing structures and construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens. The major scope elements include: Construction of the new Mainline 48th Street Bridge Installation of Retaining Walls Construction of the loop box structure extension and retaining wall Construction of the Tunnel D Pit and Approach Structure Construction of Catenary Structures Installation of monitoring devices for existing structures and ground conditions MTA Capital Construction

CM007 GCT Caverns East Side Access Project Scope of Work This Contract shall be responsible for the construction of final concrete structures and tunnel linings in the new LIRR Grand Central Terminal Caverns. The major scope elements include : Construction of the new LIRR GCT Concourse Intermodal Connections and Interfaces with MNR’s GCT including dining concourse, 45th street cross passageway, 47th street cross passageway 44th Street Ventilation Facility and 50th Street Ventilation Facility Fit-Out Installation of elevators and escalators using the designated VM014 subcontractor Local station testing of GCT concourse and caverns MTA Capital Construction

MTA Capital Construction CH058 Harold Structures – Part 3B Eastbound Bypass and D Approach Tunnel East Side Access Project Scope of Work Earth and site work, utility relocations, track realignment, drainage, hazardous material abatement, demolition of existing structures and construction of new heavy civil structures within the LIRR Harold Interlocking located in Queens. The major scope elements include: Hazardous material abatement, demolition and removal of an existing Substation Construction of a new underground East Bound By-pass Tunnel and approach structures for the new B/C and D Tunnels Extension of existing bridges and underpass structures Installation of new retaining walls, catenary/utility tower foundations and poles, access roads, and demolition and removal of abandoned utility structures New track structures shall include the installation of direct fixation track, traction power, lighting, stand pipe and fire protection systems MTA Capital Construction

MTA Capital Construction CM007 GCT Caverns Work was originally part of Contract CM012R which was split into several packages. This is the last of the CM012R work. Several Contractor Outreach Sessions were held. Based on industry input, several changes were made to the design The August 7, 2014 Outreach Presentation which provided an overview of the Contract and the revisions is available through a link on the MTACC Procurement Page at http://web.mta.info/capconstr/procurement/cc_solicitations.htm MTA Capital Construction

2015 – 2019 Proposed Capital Program East Side Access - $2.572B The proposed 2015-2019 Capital Program will complete the construction of ESA to enable revenue service by December 2022. Elements of project management, design, construction management, and insurance necessary to support construction as well as support to testing and commissioning are also funded. The program includes the following major construction elements: • Construction of Manhattan Caverns. • Reconfiguration of the Harold Interlocking and yard lead. • Construction of a mid-day storage yard in Queens for rolling stock. • Construction of a new entrance for LIRR customers at Grand Central Terminal. • Procure, fabricate, install, test and commission communication, controls, security, fire detection, tunnel. • Procurement and installation of traction power equipment. • Procurement of electric rail cars for opening day MTA Capital Construction

2015 – 2019 Proposed Capital Program Second Avenue Subway (Phase II) - $1.535B The proposed 2015-2019 Capital Program includes tunneling from the Phase 1 terminus north of 96th St. and Second Avenue to 125th St. and 5th Avenue. All elements of project management, design, construction management, insurance, and real estate necessary to support construction are also funded. The balance of the work necessary for operation will be funded in future capital programs. In its entirety, SAS Phase 2 will complete the full project’s East Harlem segment. Its alignment will run under Second Avenue to 120th St., then will turn west along 125th St., crossing Lexington Avenue and ending at 5th Avenue to accommodate storage tracks. SAS Phase 2 will utilize a tunnel section built in the 1970s from 110th St. to 120th St.and will be outfitted with tracks and other essential equipment. Three new stations will also be constructed at 125thSt.,116th St., and 106th St. The completion of SAS Phase 2 will support two major objectives of the Second Avenue Subway Master Plan: alleviate the passenger congestion of the Lexington Avenue Line and provide an intermodal connection with Metro-North Railroad at the 125th St. and Park Avenue Station. MTA Capital Construction

Where Can I find Information on Available Solicitations? MTACC solicitations that require advertisement are advertised on the MTA Website (http://www.mta.info), in the New York Post (usually Thursday edition), New York State Contract Reporter and Engineering News Record. MTA Capital Construction