Presentation is loading. Please wait.

Presentation is loading. Please wait.

Turning Ideas into Reality Presentation to Build NYC

Similar presentations


Presentation on theme: "Turning Ideas into Reality Presentation to Build NYC"— Presentation transcript:

1 Turning Ideas into Reality Presentation to Build NYC
Overview of ongoing and upcoming projects September 2017

2 Build NYC - AECOM Company
No. 1 Global Design Firm No. 3 Water No. 1 General Building No. 3 Sewer and Waste No. 1 Transportation No. 3 Environment No. 1 Hazardous Waste No. 4 Power No. 1 Program Management No. 4 Construction Management-at-Risk No. 2 International Markets No. 6 Top 400 Contractors

3 Build NYC - AECOM Organization
Five Business Lines Energy Buildings and Places Environmental PM/CM Transportation Highway/Bridge Transit Rail Marine Aviation

4 Build NYC - AECOM Provides Full range of services
Full range of services, from concept through construction and operations: – Planning, environmental analysis, and financial studies – Design (all phases) – Construction management – Program management – Systems – Startup, testing, commissioning, and operations support – Design-build/alternative delivery

5 Build NYC - AECOM M/W/DBE Philosophy
AECOM is committed to a robust and active M/W/DBE Program where we team with best-in-class firms in order to complement our service offerings and to support our clients’ missions. Our goal is to consistently expand the number of M/W/DBE firms qualified to work with AECOM as subcontractors, subconsultants and suppliers Larger pool of qualified M/W/DBE subs creates competitive pricing for commodities and services Diversity in our projects creates a platform where new perspectives and ideas can be generated Investing and creating opportunities in the communities we serve can be a strategic advantage

6 Build NYC -AECOM Highway & Bridge Sector
New York Department of Design & Construction Selected Queens Blvd Vision Zero Project, Queens Select Bus Service Requirements Contract, City Wide E. 92nd St. Ramp, Manhattan Green Infrastructure - Gravesend Bay, Brooklyn Tide Gate Bridge (Porpoise Bridge), Queens General Requirements Contracts, Non Federal/Federal Upcoming Retaining Walls/Step Street Requirements Contract Green Infrastructure Requirements Contract

7 Build NYC -AECOM Presentation Highway & Bridge Sector
New York City Department of Transportation Selected BQE Triple Cantilever, JV Engineering Service Agreement Upcoming Transportation Planning Service Agreement Rehabilitation of Williamsburg Bridge Total Design 49th Ave Bridge over LIRR/AMTRAK, Queens Total Design Henry Hudson Pkwy at 79th Street, Manhattan Total Design E. 156th Street Bridge over Access to Housing, Bronx Total Design Grand Street Movable Bridge over Newtown Creek, Brooklyn

8 Build NYC -AECOM Highway & Bridge Sector
New York State Department of Transportation Selected Bruckner Sheridan Expressway JV Region 10 RDSA Region 11 Design of Cross Bronx Expressway Upcoming Opportunities Van Wyck Expressway/JFK Airport Design/Built Nassau Expressway Design/Built Region 8 Replacement of 3 Bridges

9 Build NYC -AECOM Highway & Bridge Sector
MTA Bridges & Tunnels Upcoming RFK Bridge: FDR Ramp Rehabilitation/Replacement Hugh Carey Tunnel, Manhattan Plaza Rehabilitation Verrazano Narrow Bridge: Belt Parkway Ramps Widening TNB Replacement of Approach Roadways PANYNJ GWB Rehabilitation of Trans Manhattan Expressway Overpasses Ph1 Outerbridge Crossing Structural Rehabilitation

10 Build NYC - AECOM Transit Rail Sector
MTA NYCT Current Task Order Contracts NYCT A/E Design IQ CM yr contract NYCT Independent Safety Assessment IQ 5-yr contract NYCT ISIM-B, Module 3 NYCT Sandy IQ CM 1530 / 1535 / 1411 – 5 yr contract NYCT CM 1506 / 1507 Capital Security IQ – 5 yr contract NYCT A/E Design IQ CM1356 – 5-yr contract

11 Build NYC - AECOM Transit Rail Sector
MTA LIRR 3rd Track Expansion Program $2B program Prepared the EIS and D/B package that is currently in procurement. Next phase -anticipated construction scheduled 4 years.

12 Build NYC - AECOM Transit Rail Sector
MTA Enhanced Station Program NYCT 33 Stations D/B Team LIRR and MNRR Enhanced Stations LIRR Penn Station Critical Improvements

13 What does AECOM look for in M/W/DBE businesses
Ability to: Provide current and valid professional licenses Adhere to insurance requirements Ensure that your company is capable of fulfilling the project requirements Make sure what you are bidding on: Fits your business plan M/W/DBE certification codes reflect the scope of work which you are bidding Communication Keep checking in. Follow-up with our team Keep us abreast of any changes to your organization (new services, new contact information, etc.)

14 AECOM M/W/DBE Contacts
Doreen Taveras M/W/DBE Compliance Manager Torronce Addison M/W/DBE Coordinator

15 Thank you


Download ppt "Turning Ideas into Reality Presentation to Build NYC"

Similar presentations


Ads by Google