1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.

Similar presentations


Presentation on theme: "1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008."— Presentation transcript:

1 1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008

2 2 BROOKHAVEN SCIENCE ASSOCIATES Outline Design & Construction Approach Site Plan Ring Building Design Overall Floor Plan Architectural Program Building Section Injection Building RF Building Accommodating Long Beamlines Utilities

3 3 BROOKHAVEN SCIENCE ASSOCIATES Design & Construction Approach Design is by HDR Architects & Engineers Vibration and Acoustic Consultant – Colin Gordon Associates Cost Estimating Consultant – VJ Associates Geotechnical Consultants – GEI Associates Fire Protection Consultant – NIKA Technologies Design Phase Construction Management - LiRo/Gilbane Construction Management will be by NSLS-II Team Construction will be competitive Lump-sum contracts to general contractors (see construction package list) Main Ring Building Contract out for bid – 9/26/08 Start Construction – Spring 09 Turnover Ring Bldg to ASD – 2/11 thru 4/12

4 4 BROOKHAVEN SCIENCE ASSOCIATES Construction Packages & Interfaces

5 5 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Siteplan Vehicle Access Tunnel Possible JPSI Locations NSLS CFN Injection Bldg NSLS II Service Bldgs (1 of 5) CHW Plant Bldg 603 Substation Future LOB ’ s & Parking RF Bldg HDR Preparing new graphic Paving in Base Scope Future Paving (w/LOB’s) LOB’s in Base Scope (2 nd pkg)

6 6 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview

7 7 BROOKHAVEN SCIENCE ASSOCIATES View of Entry Lobby

8 8 BROOKHAVEN SCIENCE ASSOCIATES Key Performance Parameters Designed to achieve key CF-Accelerator Parameters Storage Ring Tunnel vibration Storage Ring Tunnel temperature stability Primary Process DI Water load and temperature stability Process Chilled Water load and temperature stability Provide supporting utilities & required capacities –Electrical –Chilled water –LN2 & GN2 –Potable Water & Fire Protection –Data and Communication Assure overall beam availability >95%

9 9 BROOKHAVEN SCIENCE ASSOCIATES Overall Floor Plan Storage Ring & Booster Tunnel Experimental Floor Access Corridor Service Buildings LOB’s 1, 5, & 4 Base Scope Future LOB’s Earth Berm RF Injection Lobby LOB 1 Vehicle Tunnel LOB 5 LOB 4 LOB 3 LOB 2 Process Cooling Water Bldg

10 10 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Section

11 11 BROOKHAVEN SCIENCE ASSOCIATES Injection Building

12 12 BROOKHAVEN SCIENCE ASSOCIATES RF Building

13 13 BROOKHAVEN SCIENCE ASSOCIATES By-pass Corridor Extended Experimental Floor Std Access Corridor Stair, ADA Lift and Material Lift Ramp

14 14 BROOKHAVEN SCIENCE ASSOCIATES Section Through Access Corridor at Beamline Section Through Corridor At Beamline 2 ’ -6 ” 7 ’ -1 ” Beam Tube

15 15 BROOKHAVEN SCIENCE ASSOCIATES Overall Utilities Plan

16 16 BROOKHAVEN SCIENCE ASSOCIATES Central Process DI Water Plant Tower Water Treatment Area Process DI Water Treatment Area Process DI Water Supply & Return Process DI Water Pumps Cooling Tower Pumps Chilled Water Supply & Return

17 17 BROOKHAVEN SCIENCE ASSOCIATES Summary CF & ASD effectively coordinating requirements to assure design meets performance goals Regular & frequent coordination meetings Active ASD interaction with CF A/E (HDR) CF design on track for completion in late August to support bid and award for Spring 09 construction start Development of detailed commissioning plan for CF facilities to enable hand-off for ASD installation & commissioning is underway (CFAC Recommendation)


Download ppt "1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008."