1 New York Building Congress November 13, 2014 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM

2 NYCT Capital Program 2010-2014 Program Track $1.4 Rolling Stock (Rail & Bus Fleets) 21% Track 13% Bus Facilities 4% Stations 18% Infrastructure & Facilities 11% Signals & Communication 24% Other 9% $11.6B

3 NYCT Capital Program Proposed Program 2015-2019 Track $1.4 Rolling Stock (Rail & Bus Fleets) 18% Track 13% Bus Facilities 4% Stations 19% Infrastructure & Facilities 18% Signals & Communication 20% Other 8% $17.1B

4 3 Proposed Program 2015-2019 Track $1.4 Rolling Stock (Rail & Bus Fleets) 18% Track 13% Bus Facilities 4% Stations 19% Infrastructure & Facilities 18% Signals & Communication 20% Other 8% $17.1B Track $1.4 Rolling Stock (Rail & Bus Fleets) 21% Track 13% Bus Facilities 4% Stations 18% Infrastructure & Facilities 11% Signals & Communication 24% Other 9% $11.6B 2010-2014 Program NYCT Capital Program

5 Projected Capital Program Work 2015-2019 Carry over 2015-2019 Sandy

6 Program Areas Recovery & Resiliency Signals & Systems Infrastructure and Facilities Station Rehabilitation Systems & Security

7 Infrastructure & Facilities Sandy Recovery & Resiliency

8 7 1.Greenpoint Tube Brooklyn Crosstown G Line – Awarded 2013 - COMPLETED 2.Montague Tube Broadway R Line – Awarded 2013 - COMPLETED 3.Steinway Tube Flushing 7 Line – Awarded 2013 4.Cranberry Tube Fulton A/C Line – Award 2014 5.53 rd Street Tube Queens M/E Line – Award 2014 6.Joralemon Tube Lexington 4/5 Line – Award 2015 7.Canarsie Tube 14 th Street L Line – Award 2016 8.Rutgers Tube 6 th Av F Line – Award 2016 9.Clark Street Tube Clark Street 2/3 Line – Award 2016 Sandy: Addressing the Tunnels

9 8

10 9

11 10

12 11

13 12

14 13

15 Recovery Projects: Rockaway Park Yard-Power Cables2014 207 Street Yard-Power Cables 2015 148 th Street Yard-Power2015 Coney Island Yard-Power Cables2016 Resiliency Projects: 207 th Street Yard2015 148 th Street Yard2015 Coney Island Yard2016 Yards will be addressed in multiple contracts with varied schedule. We are providing near term protection at the yards. Coney Island Temporary parameter protection was awarded this year. Similar plans for 207 th Street and 148 th Street Yards in early 2015. Sandy: Addressing the Yards

16 15 Sandy: Coney Island Yard

17 Sandy: South Ferry Rehabilitation

18

19

20 Signals and Systems

21 20  Supports all Signal work in the Tunnels Rutgers and Cranberry Tubes which are planned for award in 2015; and the Canarsie Tube.  Signals will take the lead in the modernizing of the Yard Projects: 207 th St Yard (including 200 th St Interlocking) is planned for award for 2016. This will be the first major capital investment in the yard since the 1930s 148 th St Yard would follow next in 2017/18 Rockaway Park would be awarded in 2018 Coney Island Yard, the largest of the 4 yards would be done in a phased approach to minimize operational impact. (note Yard projects – over $1B in work) Sandy Restoration and Resiliency

22

23

24

25

26 Replace 11 Interlockings Flushing (Awarded) Culver (Awarded) Queens Blvd (2012 Award) Dyre Ave (2012 Award) 34th, W4th and York Sts Deploy CBTC Flushing (Awarded) Culver Test Track (Awarded) Equip Fleets w/CBTC Equipment #7 Line Fleet (Awarded) Queens Blvd Fleets CBTC Implementation Roadmap 2010-2014

27 Replace 13 Interlockings 8 th Ave(2) 6 th Ave(4) 63 rd Street(4) Culver(2) Broadway(1) Deploy CBTC Qns Blvd Line (QBL) CBTC 6 th Avenue Line CBTC (incl. 63 rd St) Culver Line CBTC Equip Fleets w/CBTC Equipment 6 th Avenue Line Fleet 8 th Avenue Line Fleet Based on Full 2015-2019 Program Projects Full Funded 2015-2019 CBTC Implementation Roadmap

28

29 Infrastructure & Facilities

30 29 Construct 3 new substations in Staten Island Support new technology trains Construct 3 new substations on Canarsie Line Support increased ridership demands Begin design for new substations in Manhattan (6 th and 8 th Ave Lines) Support CBTC Rollout Upgrading Traction Power system Address substations which are beyond useful life Rehabilitating four substations Substations and Power Upgrades

31 30 New Dorp Substation, Staten Island

32 31 Clifton Substation, Staten Island

33 Upgrade HVAC systems

34 Overcoat painting

35 Stations Rehabilitation

36 Number of Stations Category2010-142015-19 Component126176 Renewal3820 ADA Accessibility914 Elevators/Escalators1334 Total186244 35

37 Numbers of Projects20142015 SBMP-Tier 12420 SBMP Tier 21113 SBFP159 Small Business Mentoring Projects

38 225 Street – Broadway-7 th Ave Line Before After Platform Canopy 20

39 104 Street Jamaica Line Street stair and canopy

40 Hunters Point Avenue Flushing Line Station renewal

41 ADA Accessibility

42 Systems and Security

43 New Bus Command Center

44 Design, furnish, and install a new digital bus radio communications system for NYCT and MTA Bus. Design and construct a modern, secure command center for NYCT and MTA Bus operations.