Presentation is loading. Please wait.

Presentation is loading. Please wait.

Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient.

Similar presentations


Presentation on theme: "Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient."— Presentation transcript:

1 Campus Plan Roosevelt Island campus > Laboratory of innovation > Open and inviting to the public > Sustainable and energy-efficient

2 BLOOMBER G CENTER

3

4 Public Open Space > More than 20% of the Site > No Gates, Walls or Barriers > Public Programming

5 Public Open Space > Laboratory of innovation > State of the art technologies > Sustainable and energy-efficient Bloomberg Center > Collaborative Work Environment > Net-Zero Goal > Public Café, Art and Programming

6 The Bridge > Co-Location Space for Companies > Cornell Tech Studio Space > Common Spaces for Programming

7 Residential Building > First High Rise Passive House in the World > Housing for Students, Faculty & Staff

8 2017 Phase One

9 Project Schedule Start of DemolitionJanuary 2013 End of DemolitionJune 2015 Start of SiteworkDecember 2014 Start of Bloomberg Ctr.March 2015 Start of The BridgeMay 2015 Start of Residential June 2015 Phase I OpeningSummer 2017

10 December 2014

11 January 2015

12 February 2015

13 March 2015

14 April 2015

15 May 2015

16 June 2015

17 July 2015

18 August 2015

19 September 2015

20 October 1, 2015

21 Bloomberg Center

22 October 1, 2015 Bloomberg Center The Bridge (Co-Location)

23 October 1, 2015 Bloomberg Center The Bridge (Co-Location) Residential Building

24 October 1, 2015

25 Current & Upcoming Work Sitework Utility installation on East and West roads (closed to public) Utility installation on campus Completion of CUP structure & start of equipment installation North Road to re-open by the week of October 12 Bloomberg Center Steel structure started September Façade/enclosure to start in January 2016 The Bridge (Co-Location) Steel structure to start in early October Façade/enclosure to start in Winter 2016 Residential Superstructure to start in mid October Façade/enclosure to start in Winter 2016

26 September 2015 Utilities & Roadways

27 September 2015 Utilities & Roadways

28 September 2015 Bloomberg Center

29 September 2015 Bloomberg Center

30 September 2015 Bridge (Co-Location)

31 September 2015 Bridge (Co-Location)

32 September 2015 Residential

33 September 2015 Residential

34 Construction Commitments  Reduce truck traffic through largest voluntary barging effort in NYC history  Minimum 17% MWBE participation in construction  Union labor on all construction projects  On-site air monitoring for duration of the project  Extensive roadway & utility improvements  Close communication with Roosevelt Island stakeholders

35 Barging for Demolition Reduction of more than 12,000 truck trips on Main Street

36 September 2015 Barging for Demolition

37 Barging for Construction

38

39

40

41

42 September 2015 Barging for Construction 1 3 2 4

43 Upcoming Milestones Reopening of North Loop Road Relocation of West Road fence to facilitate road reconstruction Steel construction at Bloomberg Center & The Bridge Concrete superstructure at Residential Building Start of geothermal wellfield