Multistory Office Building

Slides:



Advertisements
Similar presentations
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Advertisements

MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Skyscraper Construction
Robert Adkins Et 494 Instructor: Dr. Cris Koutsougeras Advisor: Mr. Rode 12/04/2013.
ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’
Larrison Pavilion Deming Park Terre Haute, Indiana.
A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Steel Building Apartment- Design and Build Sutton Yanosky ET494 – Dr. Cris Koutsougeras Advisor –Mr. Rode.
Rocky River Design and Engineering Academy Drafting Technology Related Course Offerings Instructor: J. S. Gretsuk.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Architectural Design Construction of a Wall Section Upon completion of this assignment, you will be able to accurately and neatly draw, to scale and limits,
Steel Fabrication & Erection of Belle Chasse Primary School Belle Chasse, LA Derek Duhon ET Instructor: Chris Koutsougeras Advisor: Edward Rode’
By: Brian Toomer ET-494 Senior Design Dr. Cris Koutsougeras Advisor: Mr. Rode’
Jacob Ruiz W# ET Senior Design Instructor: C. Koutsougeras Advisors: R. Rode May 9, 2014 Jacob Ruiz W# ET Senior Design Instructor:
Reading Structural Drawings
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Syllabus Faculty of Applied Engineering and Urban Planning Civil Engineering Department Lecture - Week 1 2 nd Semester 2007/2008 UP Copyrights 2007 Introduction.
WRIGHT ENGINEERING BY: CHAMPION HEIGHTS COMMERCIAL BUILDING ERIC BEALS RYAN KRAUSE CAMERON MILLER RANDY RODRIGUEZ HORACIO MONTEJANO.
State of Virginia’s Adoption Uniform Statewide Building Code –Adopts model codes by reference Family of I Codes 2003 edition NEC 2002 edition –Statewide.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Senior Design Project Et 493 Design of a Two-story Office/Apt For: Dr. Cris Koutsougeras Advisor: Mr. R.E. Rode Prepared by Joshua Price.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
HUNTING CAMP FACILITY BY: Ryan Fremin ET 493 Senior Design Construction Engineering Technology Professor: Dr. Koutsougeras Advisor : Mr. Rode.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
T IMOTHY H P ARK – S TRUCTURAL O PTION. Building Summary Current Systems Proposal Description Gravity Lateral Other Structural Factors Breadth Options.
Design Development Code analysis Partition types.
Senior Project 24’x24’ structure By: Andrew LeBlanc ET-493 Fall 2013-Spring 2014 Advising by: Rudolph Rode and Byron Patterson.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Codes.
 Presented by: Stephen DeMatteo  Engineering Technology, Construction  ET- 494 Fall 2014  Advisors: Ed Rode Cris Koutsougeras.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
ET 493: Senior Design Design of a New Hammond Head Start Center By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras Advisor: Mr. R. Edward.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design II.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
ET 493 – Senior Design Design of a Multi-Office Building BY: WOODROW WILSON INSTRUCTOR: DR. C. KOUTSOUGERAS ADVISOR: MR. R. EDWARD RODE.
Senior Design Project Office Building By: Heath Yeager ET – 493 Spring 2014 Advisor: Mr. Rudolph Rode.
Final team building Presentation
Upon completion of this module, you will be able to:
Construction Documents
Design of a Commercial Shopping Center
Commercial Office Building
Multistory Office Building
Designing a Commercial Shopping Center
Commercial Office Building
Design of a Commercial Shopping Center
Floating Semi-Self Sustaining Housing Unit ET494
Drawing Interpretation
ET 494: Senior Design Design of a New Hammond Head Start Center
Commercial Office Building
Total Fitness Gym By Student Architect Jhonatan Rubio
Outline Introduction Structural Redesign Gravity System
Instructor: C. Koutsougeras
Carleton College Summer 2018 Science and Campus Construction Plan
1 Semester Project Design A Multi Story Office Building
Senior Design Project Office Building
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
10 The Cost Approach—Part I: Reproduction/Replacement Cost
By: Cody Menard and Taylor Bishop Instructor: Dr. C. Koutsougeras
Commercial Office Building
NEW MEDICAL FACILITY BUILDING
New Medical Facility Building
Multi-Family Fourplex Apartment
Civil Engineering and Architecture
Senior Design Project Prepared for: Dr. Koutsegeras Advisor: E. Rode
Presentation transcript:

Multistory Office Building ET 494 Professor: Dr. Cris Koutsougeras Advisor: R. Edward Rode’ Students: Michael Rebstock and Zac Venable Construction Concentration

Objective The purpose of our project is to display skills learned throughout the ET curriculum specifically dealing with: Surveying Scheduling/Planning (Primavera) Estimating Engineering Calculations Design Building w/ AutoCAD

Introduction The goal is to design-build a multistory commercial office building The building will have specific design requirements The investigation of a LEED certified building will be analyzed

Selected Location More land for a cheaper price Centered in an Industrial area Close to US 190, I-12, I-55

Site Layout

Building Codes International Code Council 2012 Permits Occupancy Classification High-Rise Buildings Means of Egress Accessibility Interior Environment Exterior Walls Roof Assemblies and Rooftop Structures Structural Design Soils and Foundation Glass and Glazing Electrical Mechanical Systems Plumbing Systems Elevators Special Construction (Awnings/Canopies) Concrete Steel

Building Materials Building will be constructed using: Steel Beams/Columns/Joists Concrete Columns Precast Concrete Wall Panels Composite Metal Flooring Deck (2nd,3rd,Roof Slab) Constructed using Autodesk Revit

LEED Investigation Precast Concrete Panels for Exterior/Interior Walls Metal Stud Crete (MSC) Benefits Conventional Panels 100-140 lbs per square foot MSC Panels 35-40 lbs per square foot Lighter Dead Loads on Beams/Columns Exterior Concrete/ Interior Steel in one assembly

LEED Investigation Aluminum Door Framing/Assembly Benefits Exterior/Interior Doors Curtain Walls Interior Office Partitions Benefits Optimize Energy Performance Recycled Content Regional Material

Elevation of Building

Overview of Building Room Type 1st Floor 2nd Floor 3rd Floor Total Lobby 1 Reception Conference Room 3 General Office 25 34 93 Men's Restroom Women's Restroom Machine Room Maintenance Room 2 Electrical Storage Lounge

Floor Plan 1st Floor

Floor Plan 2nd Floor

Floor Plan 3rd Floor

Deliverables Spring 2016 Complete Load Calculations Finalize Working Drawings Quantity Take-Off Complete Project Estimate Complete Project Schedule (Primavera)

Timeline Week Date Description of Task Week 1 January 18 - January 22 Determine Tasks/Goals for Spring Semester – Venable/Rebstock Week 2 January 25 - February 5 Work on Proposal Presentation – Venable/Rebstock Week 3 Week 4 February 15 - February 26 Complete Load Calculations – Venable/Rebstock Week 5 Week 6 February 29 - March 4 Finalize Working Drawings - Venable Week 7 March 7 - March 18 Quantity Take-Off - Rebstock Week 8 Week 9 March 21 - April 8 Complete Project Estimate – Venable/Rebstock Week 10 Week 11 April 11 - April 22 Complete Project Schedule(Primavera) – Venable/Rebstock Week 12 Week 13 April 25 -April 29 Overview of Project / Present Final Project to Advisor and Make Adjustments Accordingly Week 14 May 2 - May 6 Prepare Final Report and Presentation for ET 494

Any Questions?