ADO-PO section meeting. ADO : Atlas Detector Operation

Slides:



Advertisements
Similar presentations
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Advertisements

INDUSTRIAL & SYSTEMS ENGINEERING
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Design Office meeting Design office meeting.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
Page 1 BaBar IFR Mechanical, Schedule Cost Review Outbriefing (1) Excellent job on preparing and presenting review Overall, the Committee feels that the.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
WG3 Insertion/Extraction Testing Program R. Vuillermet 11/04/20111.
1 Safety and Database Subsection ADO - PO - SA Safety achievement and future activitiesSafety achievement and future activities Database (see K. Pommes.
Technical Support Activities in PH-ADO-PO
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
ADO-PO Section Meeting Safety Group LS1 Shutdown Safety Organization.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
1 Safety and Database Subsection ADO - PO - SA Main safety projects / activities Main safety projects / activities RP issues RP issues Patrols Patrols.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Section Meeting: TC overview. Outline TCn organization TCn activities – Maintenance and new installations Short term priorities Mid Term priorities Long.
ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
WG1 Decommissioning Kickoff Workshop WG1 Decommissioning Kickoff Workshop Long term Storage & ID tooling management R. Vuillermet on behalf of TC team.
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
Rad. Shield 2 Feb. 06D.LACARRERE1 IP8 POINT 8 – RADIATION SHIELD – UX85 Introduction  History (in brief)  Conceptual Design  Why installation shifted.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
Straw man layout for ATLAS ID for SLHC
ATLAS Safety – EYETS 2016/2017 EP-ADO-PO Section Meeting 
ADO-PO / TC meeting 1st December 2016
ADO–PO/TC Meeting Safety Activities
ADO-PO / TC meeting NJD/NSW Assembly Raphael Vuillermet.
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
IBL project for DT Science-Techno Tea
LBNF CAD models, Drawings and Component list
TC activities.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Francois and Lau EATM 17 July 2012
INSTALLATION SEQUENCE
Software Subcontractor
LHC Experimental Vacuum Systems Status October ‘07
Technical Support Activities in EP-ADO-PO
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
Upgrade Strategy for the Experimental Vacuum Systems
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Initial BIS installation
Insertable B Layer Cooling System
Technical Support Activities in PH-ADO-PO
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Installation plans from mid 2005
Update on ATLAS insertable B-layer
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

ADO-PO section meeting. ADO : Atlas Detector Operation ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet 14/04/2010

Content of the meeting Engineering activity in the design office for 2011 (Raphael) Technical support activities (Michel) Safety activities (Olga) 14/04/2010 R. Vuillermet

Cars reduction cost Currently in the section we have the following cars : 3729 in building 26 3549 in building 582 3116 in building 108 2793 in building 108 3049 in building 108 3346 at point 1 Each car cost 3.300 CHF/year, for 6 cars it is a budget of 19.800 CHF/year paid by the group. The group leader ask us to make an effort in reducing this budget Proposal is to keep 3 cars How to compensation During shut down period we can hire more cars for shift activities and for outside reinforcement teams During the year we propose to use Atlas pool cars (at point 1)  contact C. Potter Hertz Pool cars (for building 26 and 108)  every body with CERN car authorisation (EDH request is mandatory with a scan of your driving licence) will receive a access card.  contact H. Poirel For emergency need, PH service can loan a car for maximum ½ day for free )  contact S. Yebbou To share the work shop (108) cars with PH/DT, agreed with Hans Danielson – (4 cars and 1 truck available) To use bicycles, (2 available at build 26/602)  contact S. Yebbou 14/04/2010 R. Vuillermet

2011 Design office activities 3 main activities Provide the technical and engineering support for the ATLAS technical coordination Provide the technical support for operation task Provide engineering support for upgrade activities development Current resources in the design office : Tatiana Gevorg Denis Alexander Giancarlo Erik Sebastien Wim Marco Dimitar Raphael 14/04/2010 R. Vuillermet

1- Engineering support for ATLAS TC JFC1 lifting tool (Denis & Dimitar) The purpose of this tool is to install/remove the JFC1 shielding faster than currently. The consequence would be a time saving in the schedule a activation dose saving for the operation a minimisation of risk by less crane operation The design is currently under progress to check the feasibility. Production of such a tool will be subcontracted 14/04/2010 R. Vuillermet

1- Engineering support for ATLAS TC ECT top platform (Wim) Purpose of the job : Preparation of production drawings and technical specification for the fabrication of an additional ECT top platform. The design is based on the existing ECT top platform. This platform will be a duplication of the existing one to be able to have access on both side of the experiment in the future. 14/04/2010 R. Vuillermet

1- Engineering support for ATLAS TC Define access path inside the toroid following the installation of EE Chambers – (Alexander, Tatiana, Michel, Giancarlo, Olga) Purpose of the job : Organise the access platform required to allow the correct access inside the toroid and the correct emergency exit according to safety recommendation. 14/04/2010 R. Vuillermet

1- Engineering support for ATLAS TC EES installation (Alexander, Erik, Giancarlo) Purpose of the job : Design the necessary tooling and access for the installation of EE chamber Prepare the detailed installation sequence with the management of the access platform 14/04/2010 R. Vuillermet

1- Engineering support for ATLAS TC Big Wheel Basket (Alexander, Dimitar, Raphael) Purpose of the job : Design access means to change TGC chambers on TGC wheels This access means should be able to inserted in between 2 Big Wheels when separated. Demonstrate the feasibility of such an access, design and prepare production drawings. 14/04/2010 R. Vuillermet

1- Engineering support for ATLAS TC CAD model organisation Finish the creation of simplified and detailed models of the following items, position them into the ATLAS coordinate system (under the supervision of Tatiana) Warm structure (Denis) HS structures (Denis) Muon chambers and muon alignment system (Gevorg, Wim) End Cap Calorimeter (Denis) Services, gas piping, racks at Z=0 (Denis) Big Wheels models (Alexander, Erik) HF truck (Gevorg) Access bridge and scaffolding (Gevorg) With simplified model create the ATLAS assembly for presentation and representation (Tatiana, Denis) All this Engineering support will represent about 40% of our working time 14/04/2010 R. Vuillermet

2- Technical support for operation task Participation to the winter opening/closing Provide supervision manpower (Dimitar, Giancarlo, Raphael) Participation to the operation services (all personal) Safety shifts Alara shifts Participation to the technical stop Patrol (all personal) Participation to the yearly operation of the detector when needed Slimos (Tatiana, Marco, Sebastien, Giancarlo, Dimitar, Raphael) RPE (Giancarlo) All this operation task activities are estimated to represent about 15% of the design office activities. 14/04/2010 R. Vuillermet

3- Upgrade activities Small Wheel – new concept (Alexander, Tatiana, Giancarlo Spigo) Purpose of the job : Prepare supporting concept of the new muon chambers Prepare new shielding disk concept Work in partnership with the muon community and shielding expert. A new small wheel is not foreseen before upgrade phase II 14/04/2010 R. Vuillermet

3- Upgrade activities nSQP (Sebastien, Erik) Purpose of the job : Design the new service quarter panel Integrate the services routing inside the nSQP Design and integrate the new optobox Integrate the services on the face of the Inner Detector 14/04/2010 R. Vuillermet

3- Upgrade activities IBL mock-up construction and exploitation (Francisco, Louis, Marco, Erik, Raphael) Purpose of the job : Assemble a scale one mock-up for testing the extraction/insertion tooling and procedures. (under good progress) Operate the tooling, propose modification and/or develop new concept. Test the tooling and the procedure Demonstrate by the end of the year the feasibility of such an operation 14/04/2010 R. Vuillermet

3- Upgrade activities Shielding (Marco, Tatiana, Olga) Purpose of the job : Add additional layers of shielding on : HO face of ECT USA 15 wall 14/04/2010 R. Vuillermet

3- Upgrade activities IBL integration activity (Raphael, Franck Cadoux UniGe) Purpose of the job : Coordination of the integration of the IBL package (Christophe Bault, Didier Laporte LPNHE) Coordination of the tooling development (LPSC, Brandeis, Washington, Erik) Coordination of the service routing integration (Erik, Tatiana, Alexander, Bart, Jan) The upgrade activity will represent about 45% of our working time 14/04/2010 R. Vuillermet

LCD activities Integration of the tail catcher on the tungsten absorber (Erik) Purpose of the job : Design, integrate and follow the construction of the installation of the tail catcher on to the tungsten absorber. Pixel detector layout (Erik) Provide drawings of the pixel detector layout, including first sketches of suspension, service routing and cooling principles. 14/04/2010 R. Vuillermet