1 ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
13/09/2018 ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting 26 October 2016 C. Bortolin, D.Giakoumi, B. Verlaat, L. Zwalinski

2 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
13/09/2018 Presentation Outline Proposals for the locations for the PP2 manifold and the transfer lines routing into the Barrel region based on on-site investigation and discussion with ATLAS PO Manifold Zones space availability-Sectors 5 & 13 Pipe routing from barrel area to PP2 manifold Pipe routing from PP2 manifold outside the Barrel region Feed-throughs on IDEP Back-up slides: Alternative solutions Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

3 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Outline of on site investigation Visit to the ATLAS Cavern to identify possible manifold locations and piping passages Discussion of the proposed locations/routings with the Atlas PO Input from the PO on additional services and passages that cannot be used Visit of ATLAS Cavern with the Project Office representatives Retuning of the proposed locations after the last ATLAS visit and the PO recommendations The predominant proposals after the last discussion with PO are presented Details on the piping integration shall be defined by the PO (new engineer arriving to work on integration CATIA models) Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

4 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
13/09/2018 Manifold Zones – Space availability Itk manifold location IBL manifold location A. Sector 5 Platform on IBL manifold level (Strips) B. Sector 13 Platform between Muon BML-BIL (Pixel) A A B B Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

5 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Manifold Zones – Space availability in Sector 5 Platforms next to IBL manifold Sector 5 A Platforms next to IBL manifold C-side View B Sector 13 Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

6 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Manifold Zones – Space availability in Sector 13 Platform between Muon BML-BIL Space below metal bars Concern: Not to block access below floor because new cables are foreseen a Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

7 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Barrel → Sector 5 manifold: A. Gaps between IDEP fingers B. Gaps on Muon BIL on sectors 1, 3, 7 (150 mm) Gap similar as sector 3 Gaps through inner muon layer Sector 3 150 mm Sector 7 Sector 1 C-side View The large gaps between the muon chambers of S1, S3 & S7 give a very open path to the S5 platform proposed for the manifold. If use sectors 3&5 will have a symmetric system Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

8 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Barrel → Sector 5 manifold: A. Gaps between IDEP fingers B. Gaps on Muon BIL on sectors 1, 3, 7 (150 mm) Sector 3 Panoramic View Sector 7 Sector 1 Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

9 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 5 Manifold → external Detector Area Gap between IBL junction box platform-external gate (balcony level 7) IBL Junction box Pipe routing Towards C side Towards USA cavern Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

10 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 5 Manifold → external Detector Area Gap between IBL junction box platform-external gate (balcony level 7) 18x50mm OD lines can be fed through 350 mm 250 mm Magnet people to be asked if can go below or must only use the side gap Empty cable tray Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

11 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 13 Manifold to → IDEP A. From IDEP through 1st muon layer From Top From Bottom Some are covered with a ventilation pipe, can they be removed? From Below Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

12 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 13 Manifold to → IDEP B. From IDEP through 1st and second muon layer From Top From Bottom Muon chamber moves for opening Gap already contains vacuum hoses From Below Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

13 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
13/09/2018 Sector 13 manifold→ External detector area Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

14 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
13/09/2018 Gaps on IDEP – How many flex lines do we need to fit? Based on the layout presented by the detector groups a 5kW flex line is chosen as baseline for PP2 to PP1 distribution The total number of flex lines foreseen is 38 (Pixel)+36 (Strips)=74 lines (37 per side) The vacuum shielded diameter is estimated to be 50mm Source= Bart Verlaat Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

15 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
13/09/2018 Gaps on IDEP Gaps between fingers W:325mm D:100mm Feed-throughs C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

16 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
13/09/2018 Gaps on IDEP At present it looks feasible to route 37x 50mm flex hoses out of each IDEP IDEP finger gaps, 70 x 350mm each →5 flexlines 325 mm 70 mm 325 mm Calorimeter large gaps, 160 x 350 mm each →14 flexlines 160 mm IDEP Feed-throughs: 325 x 100mm 9 flex lines/feed-through 2 feed-through/sector 18 flexlines/sector* 325 mm 100 mm W:325mm D:100mm *Based on 50mm OD flex lines-Packing factor=1.2 Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

17 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Gaps on IDEP -37 lines must escape from the IDEP -Each feed-through can fit max 14 lines C Side IDEP feed-throughs Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

18 Gaps on IDEP C Side IDEP feed-throughs 13/09/2018
ATLAS CO2 Meeting, 28 June 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

19 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Backup Slides -Alternative proposals for sector 13 manifold space -Alternative proposals for routing from Sector 5 manifold to external detector area Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

20 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 13 Manifold B, C: Sector 13: Platform between Muon BIL-BML, over metal rack (0.4 x0.5 x2.5m) or on the area of existing PP2 box D: Sector 13 Platform between Muon BML-BOL Instead of existing PP2 box Sector 5 a b c staircase C-side View b, c d Sector 13 Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski 4

21 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 13 Manifold → external Detector Area Gap next to small Wheel muon layer Light on the end of the tunnel Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

22 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 5 Manifold → external Detector Area A. Gap between IBL junction box platform-external gate (balcony level 7) B. Replacing ventilation pipe exiting at level 7 C. Gap between Muon BML-small Wheel D. Free space on Sector 4 C-side View Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

23 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 5 Manifold → external Detector Area A. Gap between IBL junction box platform-external gate B. Replacing ventilation pipe exiting at level 7 C. Gap between Muon BML-small Wheel D. Free space on Sector 4 20cm Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski

24 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski
Sector 5 Manifold → external Detector Area A. Gap between IBL junction box platform-external B. Ventilation pipe exiting at balcony on level 7 C. Gap between Muon BML-Small Wheel D. Free space on Sector 4 gate C-side CATIA Cross Sections of Sector 4 Common Mechanics Meeting, 26 October 2016 C. Bortolin, D. Giakoumi, B. Verlaat, L. Zwalinski


Download ppt "ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting"

Similar presentations


Ads by Google