Presentation is loading. Please wait.

Presentation is loading. Please wait.

ADO-PO / TC meeting 1st December 2016

Similar presentations


Presentation on theme: "ADO-PO / TC meeting 1st December 2016"— Presentation transcript:

1 ADO-PO / TC meeting 1st December 2016
Introduction Raphael Vuillermet Ludovico Pontecorvo 1st-Dec-2016

2 R. Vuillermet & L. Pontecorvo
Introduction Purposes of this meeting are : News in TC and in the Section Provide information about the EYETS for Organisation Schedule Activities during the EYETS 1st December R. Vuillermet & L. Pontecorvo

3 New in TC and ADO-PO section
Manpower New Team Leader for the CAT (Cern Atlas Team) is Christoph REMBSER replacing Giuseppe MORNACCHI from today. Giuseppe is remaining the ADO group leader. New comers : Joffrey Malaquin as a mechanical engineer in the ATLAS design office (since 1rst of October) Participating to the Atlas opening /closing operation ITK engineering activities Marco Ciapetti as the new EAM (Experimental Area Manager) starting on 1rst of March 2017 Follow cabling activities in Experimental infrastructure Follow civil engineering activities for SR1 Manage experimental areas Follow-up production of the nJD/nSW Martin Jaekel as starting on 1st of November Participates in the ID decommissioning studies and manages the GIF++ facility Ana Chrul as the support for project management starting on beginning of January Manage tool wizard Define and manage templates Miles-stone definition Define the tool to track the milestone and project progress Supervise software development on management tools for TC 1st December R. Vuillermet & L. Pontecorvo

4 R. Vuillermet & L. Pontecorvo
Pavel Malý as designer joining the design office 1rst of January to replace Vit Zahradnik Prepare the tooling review Extraction of BOS6 BOL6 for LS3 Michail Batsiolas as an engineer in training for 6 months in design office (since 21th of October) Engineering of the MicroMega spacer frame Paola Mazzotta as technical engineer for MicroMega project 1st December R. Vuillermet & L. Pontecorvo

5 R. Vuillermet & L. Pontecorvo
EDMS and CDD Project management News in EDMS and CDD structure Hardware configuration of the detector is now visible in CDD and soon it will be in EDMS. ATL (Phase 0) , AT1 (phase 1) and AT2 (phase 2) are now created and directories linked. Similar partition will be developed in EDMS for better clarification, better follow-up of the different phase of the detector development. This organisation will allow in particular to keep maintaining the current detectors while developing the upgrade ones (eg. SW and nSW or ID and ITK) 1st December R. Vuillermet & L. Pontecorvo

6 R. Vuillermet & L. Pontecorvo
Storage Database The database that was used during the sorting and storing of material was an excel file. This file is now over and the database is now in production on Infor-EAM This database has the advantage of : not being dependant of the MS program over the life time of the storage (at least until 2035 for ATLAS decommissioning) being supported by the CERN EN-ACE service Being a common with other installation at CERN Being accessible also with smartphone as the building is not covered by Wifi Being accessible by several identified users Cedric Sorde Didier BERTET Danilo GIUGNI Francisco LIMIA-CONDE Frederic Rosset Leboube Christian Georges Michel RAYMOND Philippe Benoit Louis Rose-Dulcina Raphael VUILLERMET The content of the our tooling could be share with other users for a better usage of tools and material CERN wild. 1st December R. Vuillermet & L. Pontecorvo


Download ppt "ADO-PO / TC meeting 1st December 2016"

Similar presentations


Ads by Google