To The For The. CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd.

Slides:



Advertisements
Similar presentations
City of Corvallis – 4 elementary schools: (1) Hoover Elementary School (2) Garfield Elementary School (3) Jefferson Elementary School (4) Lincoln Elementary.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Highway 61/147th Street Intersection Business Meeting April 20, 2010.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Maryland Avenue and Arkwright Street Nick Fischer, EIT Ramsey County Jerry Auge, PE Project Manager Ramsey.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Cudahy Packard Avenue Streetscape Project INFORMATIONAL MEETING #2 Prepared for the City of Cudahy Common Council Packard Avenue Businesses & Property.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
Steve Dittmer Supervising Engineer Curb Ramp Prioritizations Capital Improvement Planning.
Meeting Agenda Introduction of Project Team Connective Corridor Project Onondaga County Sewer Separation Project Civic Strip Project Syracuse University.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
6 th Street Water Main And Street Reconstruction 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
Michigan DOT Concrete Bus Tour August 13, Bill Miller, PE, Chief, Quality Assurance Division, West Bureau of Construction and.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
Montwood Street & Drainage Improvement Project Solicitation No November 26, 2012.
Going from 4 Lanes to 3 Lanes Jefferson City’s McCarty Street Project.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Project Update Colorado Esplanade Project.
East State Street (USH 12) Hanover Street to Pine Street Juneau County November 14, 2013 Public Information Meeting.
Downtown Project Scope Downtown Project Reality.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
STA Safety Project PID #76439 December 12, 2006.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
City of Madison Engineering Division Joylynne Drive and Douglas Trail Assessment District-2010 Pflaum Road to Tompkins Drive Joylynne Drive to Herro Lane.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
RECONSTRUCTION OF MONTGOMERY STREET Capital Improvements Budget Committee March 24, 2015 Hilary Holmes, Planning & Economic Development (PED)
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1. PUBLIC WORKS 2 Traffic in Synch  Synchronization of traffic signals began December 2007  2,300 signals synchronized as of June 2010  On track to.
Madison Avenue Reconstruction Department of Planning and Development.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Phoenix Grand Canalscape Kerry Wilcoxon, P.E., PTOE City of Phoenix Street Transportation Department 65 th Arizona Roads and Streets Conference March 24,
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
CITY OF GLENDALE, CA APRIL 2, 2015 BRAND BLVD, GARDENA AVE & ADJACENT STREETS – SEWER AND STREET IMPROVEMENTS, AND TYBURN SEWER TRUNK LINE AT RAILROAD.
MARCH 18, :00 A.M. CITY COUNCIL CHAMBERS 2016 TRAFFIC SUMMIT HOSTED BY: CITY OF LANSING DEPARTMENT OF PUBLIC SERVICE.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
NAME OF PROJECT: Construction and Maintenance of Bridges along National Roads-Rehabilitation/Major Repair of Permanent Bridges, Mandaue-Mactan Bridge.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
CITY OF GLENDALE, CA October 17, 2015 SAFE ROUTES TO SCHOOL – PHASE 3 PROGRAM IMPROVEMENT S ADJACENT TO BENJAMIIN FRANKLIN ELEMENTARY SCHOOL.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
March  Finish Joint Sealing on Highlands Ranch Parkway  Finish Grinding on Lucent and Plaza and then Complete Joint Sealing  Start in Late.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
PORT OF TACOMA Lincoln Avenue Grade Separation Lincoln Avenue Improvements Project Update.
Reconstruction of Beach Drive Reconstruction of Beach Drive National Park Service U.S. Department of the Interior Rock Creek Park National Park Service.
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Improvements to Stockton Street
2nd Street Drainage and Paving Improvements
City of Orinda 2017 Annual and Measure J &L Pavement Rehabilitation Projects City Projects No & 4115.
Village of east aurora sycamore street water improvements
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
DICKINSON AVENUE RECONSTRUCTION
PROJECT NO. T SE Adams Street - SE 29th Street to SE 33rd Terrace
Highway 169 Bridge Replacement & Pavement Resurfacing
SW Gage Blvd - Street Repair Project
Project Scope of Work Project Contacts
Walker Street Reconstruction Project 25% Design Public Hearing
Commissioners Presentation
Robincrest/Elmgate/ Linneman Improvements Welcome!
2019 Capital Program Title of Presentation
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

To The For The

CITY OF GLENDALE, CA Community Meeting, January 9, 2016 Ocean View Blvd. Looking South Intersection Verdugo Road and Ocean View Blvd. Intersection Broadview Drive and Ocean View Blvd. Intersection Sunview Drive and Ocean View Blvd.

ANTICIPATED CONSTRUCTION START DATE: Spring 2016 PROJECT DURATION: 115 Calendar Days barring any unforeseen conditions MEETING AGENDA MEETING AGENDA Project Scope of Work and Locations Sewer Point RepairsIntersection Improvements Concrete and Pavement Repairs Street TreesSignal ModificationsConstruction Phasing /Scheduling Public Notification Process Questions / Comments

RESOURCEFUL FACTS -R&R (Remove & Replace) -ARHM (Asphalt Rubber Hot Mix) -AC (Asphalt Concrete) -PCC - Portland Cement Concrete (for Sidewalks, Curbs, etc.) -ADA (Americans with Disabilities Act)

LOCATION MAP LOCATION MAP

Sewer Main Point Repair(Ocean View Blvd. and Side Streets) Repair of Damaged/Cracked Pipes at Various Locations 2-3 Day Work at Specific Locations Working Hours: 9am – 3pm

BUMP-OUT CONSTRUCTION AND TRAFFIC SIGNAL MODIFICATIONS AT OCEAN VIEW BLVD. AND BROADVIEW DRIVE

BUMP-OUT CONSTRUCTION AT OCEAN VIEW BLVD. AND SUNVIEW DRIVE

STREET ALIGNMENT IMPROVEMENTS AND TRAFFIC INSTALLATION AT OCEAN VIEW BLVD. AND VERDUGO ROAD

HONOLULU AVENUE AND MARKET STREET BUS STOP MODIFICATION

RUBBERIZED (ARHM) PAVEMENT OVERLAY Improves the Ride and Structural Integrity of the Roadway Place 1.5 ” ARHM Overlay Over Existing Base Pavement Eco Friendly (Uses Tires) Begins NEW Service Life for Pavement Quieter and Smoother Ride Better Road Friction

CONCRETE Remove and Replace Uplifted/Broken/Damaged: Sidewalks, Curb Ramps, Driveway Aprons Curb/Gutter, Cross Gutters

Trees Plantings (Possible 4 to 5) Pink Trumpet Tree (tabebuia impetiginosa) Removals Three Tree Removals at Verdugo Road Median

Public Notification Community Meeting (Today) City Website (Bid Advertisement) Director’s Letter (1-2 months ahead) Contractor’s Notification Letter (2~3 weeks ahead) 3-Day Door Hanger (Concrete/AC R&R) (3 days) City Website (Construction Progress)

For questions or general information, please contact: Armond SimonianYvonne Guerra PW Project ManagerPW Community Outreach (818) (818) or