FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.

Similar presentations


Presentation on theme: "FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland."— Presentation transcript:

1 FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland Blvd. DeLand Florida 32720 385 943 5145 Gene.Varano@dot.state.fl.usGene.Varano@dot.state.fl.us December 13, 2011 Public Information Meeting FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland Blvd. DeLand Florida 32720 385 943 5145 Gene.Varano@dot.state.fl.usGene.Varano@dot.state.fl.us December 13, 2011 Public Information Meeting

2 Americans with Disabilities Act This meeting is being held to afford all citizens the right to understand the project and comment on concerns to the Florida Department of Transportation. The meeting is being held to comply with Title VI of the Civil Rights Act of 1964, and Title VIII of the Civil Rights Act of 1968, as amended. Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status. Persons wishing to express their concerns relative to FDOT compliance with Title VI and/or Title VIII may do so by contacting the FDOT, District Five, Title VI and VIII Coordinator Lorie Matthews, 719 South Woodland Boulevard, Deland, Florida 32720 or the Florida Equal Opportunity Office, 605 Suwannee Street, Room 260, Mail Station 65, Tallahassee, FL 32399- 0450. All inquiries or complaints will be handled according to FDOT procedure and in an expeditious manner.

3 Central Florida Roads You may also view information on the project at: www.cflroads.com Select by county, or by FPID number, under Future Projects link.

4 Project Description/Overview  The project limits are from west of Old Kings Road to SR A1A. The improvements consist of removing old asphalt (milling), repaving the roadway and shoulders, when new pavement markings are applied, the roadway will accommodate bicycle lanes through right turn lanes at Old Kings Road and Roberts Road.  Other work includes improving pedestrian curb ramps, relocating the westerly midblock pedestrian crossing in Flagler Beach and installing signing and pavement markings.

5 Stakeholder/Public Involvement  Your input is very important during this process.  Public participation is solicited without regard to race, color, national origin, age, sex, religion, disability or family status.  Public involvement efforts with local agencies.  Flagler County  City of Palm Coast  City of Bunnell  City of Flagler Beach  Local Interest Groups (Friends of A1A)  Community Awareness Plan

6 Rural Typical Section Dashed lines ( ) = Existing Features Solid lines ( ) = Proposed Features Legend  From west of Old Kings Road to the Intracoastal Waterway

7 Urban Typical Section Dashed lines ( ) = Existing Features Solid lines ( ) = Proposed Features Legend  From west of Flagler Avenue to SR A1A

8 Project Details  Work Type: Resurfacing  Length: 3.27 miles  City: Flagler BeachFlagler Beach  County: FlaglerFlagler  Routine Resurfacing  ADA Compliance Curb Ramps  Pedestrian Improvements  Bicycle Lane connectivity  New Pavement Markings  New Signage  Business Access assured during Construction  No Right of Way is needed for the project.

9 Project Schedule Completion: 08/1/12 Letting: 10/24/12 Construction: Spring 2013  Design Schedule: ViewView  Production Date Summer 2012  Letting Date Fall 2012  Construction Begin Winter 2012/2013  Construction End Estimated Summer/Fall 2013 (6 months)

10 Project Schedule Completion: 08/1/12 Letting: 10/24/12 Construction: Winter 2012/Spring 2013

11 Project Cost  The current production date is August 1, 2012  Design Fees: $400,000  Construction Estimate: $3.62 million  The Project is on schedule and on budget

12 Comment Card Mail to: Ms. Ada Vargas Public Information Coordinator Burgess & Niple, Inc. 1800 Pembrook Drive, Suite 265 Orlando, FL 32810

13 Thank you! FOR MORE INFORMATION, YOU MAY CONTACT:  Gene Varano, FDOT Project Manager at (386) 943- 5145 or via e-mail at gene.varano@dot.state.fl.usgene.varano@dot.state.fl.us  Scott Perfater, Burgess & Niple at (407) 401-8527 or via e-mail at scott.perfater@burgessniple.comscott.perfater@burgessniple.com


Download ppt "FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland."