Andy Blue WP3 - Glasgow Update Andy Blue. WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today.

Slides:



Advertisements
Similar presentations
Clean Room Plans Monday, August 23, Hybrids--- Frames--- SensorsModules.
Advertisements

MAGICON M2 (Android) Driver installation Guide. CASE 1: 1st install S350 usb Driver 32bit ver1.0 Connect thephone with the computer, if phone driver doesn’t.
ATLAS Module building at Glasgow
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Design Ash finished electric hybrid tracing to connector fields –Changes to allow for HCC-less and HCC running on one hybrid awaiting final confirmation.
SAKAI TUTORIAL Getting Started. Sakai is the new Learning Management System for Bethel University. It provides online classes in a format that is easy.
Project Perfect Pty Ltd Project Administrator Overview of Software.
My Test Plan Trevor Phillips. What I’ve Done Not much… Downloaded files I am testing Getting my tester over the weekend William’s code compiles and looks.
System for Engine Location Of a Web Train Paul Wimmer and Adam Weintrop Dr. Irwin and Dr. Schertz 4/3/06.
Molly, Gwyn, Sam, and Eric.  We had assumed that components should have a rated current no more than mA above the requirement.  Fred says that.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Control & Monitoring of DC-DC Buck Converters Satish Dhawan Yale University Power Distribution Working Group Meeting- Tuesday 24 February 2009 ATLAS Upgrade.
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting UV Glue In November, I sent UV Glue, hybrid panel + jig to Anglo Production Process LTD –UK supplier of.
Networks Am I hooked up?. What is a network? A network is a group of 2 or more computers that are linked together either by wires or by a wireless means.
Managing Monitoring Data from Many Sources A New Hampshire Experience Deb Soule Watershed Management Bureau New Hampshire Department of Environmental Services.
WP3 10 July 2014 QMUL/GAB 1 Status of Sensor Testing Setup at QMUL Re-structuring of QMUL Physics & Astronomy June/July 2013: Evacuated Physics building.
1 WP3 Bi-Weekly Meeting Activities at Liverpool 1.Evaluation of Compact DCDC converter Designed to match up to an ABC130 module 2.Status of FIB’d hybrid/module.
1 NTC/TCS Training Dallas 2009 modified by HMR for NY3 TaxWise Online (TWO) Why we should choose TaxWise Online.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Stave DAQ Updates. Testing two collobarative software websites Wiki 22ATLAS_Upgrade_- _Stave_DAQ%22#Code_Versions.
The Online Activity Module User Account and Contact Us June 5, 2013.
Stavelet Update Peter W Phillips 29/07/2011. Serial Powering with a Stavelet Module: Recent Results Whilst single SP modules in the “chain of hybrid”
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
NASAA EFD: Regulator Q&A THURSDAY, MARCH 05, 2015.
Andy Blue Glasgow Update. Andy Blue WP3 Meeting Summary ESD Protection –Part all arrived and installed Compressed Air Controls –New lines and panel being.
October 8, 2002P. Nilsson, SPD General Meeting1 Paul Nilsson, SPD General Meeting, Oct. 8, 2002 New tools and software updates Test beam analysis Software.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
MuTr Shutdown Work Rusty Towell for And JUNE 22, 2004 at the Muon Physics and Forward Upgrades Workshop.
Petalet-Stavelet; 13 July Birmingham Update Gluing to mechanical sensor with Epolite (as reported earlier). 1 st hybrid – too much glue on stencil.
Birmingham Update Module bonding (Sam and Simon) Great difficulty bonding on to patterned glass ASICs. (OK on sensor). After 1 st two rows of bonds, abandon.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Networks Am I hooked up?. Networks definition sizes of networks types advantages and disadvantages how data is sent transmission media business uses.
Stave Hybrid/Module Status. Modules Stave Module Building 2 Mechanical Chip Gluings Mechanical Wirebonding Electrical Chip Gluings Electrical Wirebondings.
JDS5 Training Guide. On Start Up you will see this screen click the OK button Click OK.
ATLAS UK Tracker Upgrade AIDA-2020 Transnational Access Facility
Peter W. PhillipsATLAS SCT Week, CERN, September/October 2002 Electrical Tests of SCT modules using RODs Peter W Phillips Rutherford Appleton Laboratory.
Strip Tracker Costing Analysis Status Carl Haber July 25, 2011.
Andy Blue Glasgow Update. Andy Blue WP3 Strip Meeting Environmental Chamber Installed into cleanroom –Working on controlling scans via Ethernet connection.
Module Assembly Jig Status Cambridge and DESY came to Liverpool Nov. 15 th -16 th for training on module assembly – A complete jig set was sent back with.
Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting, 9 th November Phil Allport, Matt Baca, Daniel Briglin, James.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
C. Haber / M. Gilchriese Integrated Stave Electrical/Mechanics/Cooling Update February 6, 2008.
Status report Pillar-1: Technology. The “Helmholtz-Cube” Vertically Integrated Detector Technology Replace standard sensor with: 3D and edgeless sensors,
Embedded C- Language Lets Learn fundamentals !!. An Embedded system is combination of computer hardware and software, and perhaps additional mechanical.
Short update from Glasgow R. Bates, A. Blue, T. McMullen.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Discrete logic processor
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Berkeley status Aug 10th, 2012.
Standardizing the Standards
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
ITK Strip Module Meeting; 12st October 2015
Constructional requirements from ITk-Strips
Database requirements from ITk-Strips for DAQ loads
ATLAS Upgrade Module Bonding Trials Using Glass Asics
Malwarebytes Installation Issues Number Facing error with Malwarebytes software is not something unusual as most of the users use to face.
Compiler Construction
USB Project (22nd July) Ian Coulter.
US Hybrid/Module/Rod Testing Model
Embedded System Development Lecture 13 4/11/2007
HP Printer Error State Issues in Windows 10 | Contact Today
HP Printer in Error State Windows 10 HPsupport247.
Presentation transcript:

Andy Blue WP3 - Glasgow Update Andy Blue

WP3 Meeting Update Module Building –2 nd Module (FZ1) wire bonded last week –Tested on Mon –Re-works yesterday/today QA –Hybrid bonding program for ABCn130 ATLAS 12 –analysis for v2 /64 bit compilation Shopping List –Needs/Wants…

Andy Blue WP3 Meeting 2 nd Module Since Last meeting –FZ1 sensor wire bonded –Received DC-DC converters end of last week (thanks Peter) –Issue with powering Noticed m shunts had not been disabled Also shorting of hybrid power bonds to sensor bonds –Happened on previous sensor –Bonds from Hybrid bonding too high and shorting sensor bonds –Should be fixed by today

Andy Blue WP3 Meeting QA – Bonding program Hybrid bonding program –V2 completed for ABCn130 –For now it has the bond numbers in order circling the 4 sides of 1 chip –When first program written by Mike I can update to all 20 chips possibly send round to bonding sites with Glass asic trials? Start Finish

Andy Blue WP3 Meeting ATLAS 12 Most of my work has been on analysis code for ALIBAVA CCE testing of ATLAS12 sensors –Code came from Ljubljana Doesn’t seem to “like” V2 style.dat files Or 64 bit compilation –Most issues sorted (modernising variables types in the main) –Began to look at data from Glasgow CCE test set up

Andy Blue WP3 Meeting Shopping List Short term (till April) –GPIB cables (bought) –Connecters for ATLAS 12 CCE setup (bought) Long Term –Thermal Shock Chamber ~£32k (commercial option) –Environmental chamber/Chiller ~£12k –Storage Cabinet ~£10k –Refurbished Scroll pump ~ £1.3k –N2/air automatic switchover unit £1k –RC code printer + software £500 * –Inspection microscope £?? * I have a few ideas on how to database parts for the assembly and the ability to track times and positions of scans (as well as links to online information)