ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel.

Slides:



Advertisements
Similar presentations
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
Advertisements

Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Atlas standard opening ATLAS Project Document N°: ATL-HT-OP-0014 EDMS id Created : January 13 th, 2009 Modified : Main document Overall view of.
10/11/03 TGC1 Design problem Muon Week, 10 th November 2003 R. Vuillermet on behalf of the Muon Design Team : E. Fernandez, D. Mladenov, P. Minginette,
1 Installation of Delphi Frame  ITS Installation.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Visit Gangway FromLHBIEP__0181 by Andre Coin ~ 2600 GANGWAY POSITION.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ATLAS EXPERIMENT INTEGRATION TASK: SPACE MANAGEMENT Tatiana Klioutchnikova 05/06/
ATLAS Endcap Muon System WBS 3.5 Frank Taylor MIT M&O Request FY06 Toronto August 3, 2005 V1.1.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
ATLAS Muon System WBS 3.5 DoE/NSF M&O Evaluation Group Review BNL 19-Jan-06 Frank Taylor MIT V1.3.
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
Technical Support Activities in PH-ADO-PO
ATLAS + NA62 DIRK MERGELKUHL. Dirk MERGELKUHL| SU pendant LS1 day| | EDMS | page 2 Quoi (quelles activités prévues pendant le LS1) The.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Michel RAYMOND – April 14 th, 2011 Technical Support Activities in PH-ADO-PO Goals for 2011.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
TAS at IP5 Present situation and plans François BUTIN TS/LEA.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Infrastructure activities planned on ATLAS during YETS 2015 Thanks to all the experts who contributed Bruno Saint Sulpice, Denis Dumas, Serge Deleval,
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
V. Bobillier1 Cable installation status.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Installation scenario, status on the installation tools.
TB Peter Glässel, Heidelberg1 Preparing TPC Installation.
Muon barrel cooling G. Aielli and J. Godlewski LS1 TC planning.
Project Office Activities R. Vuillermet 08/09/2015R. Vuillermet PH-ADO-PO1.
ICARUS Collaboration Meeting Dec A. Scaramelli.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Status on closing operations End cap calorimeter side A Forthcoming operations ATLAS – April 17th, 2009 Prepared by Michel RAYMOND.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
Michel RAYMOND – December 7 th, 2012 Technical Support Activities in PH-ADO-PO Statement of 2012 activities Schedule & Organization on LS1.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Atlas status report. LHC Cooldown Status LHC is proceeding with the cooldown and the hardware commissioning L.Evans is asking the experiments to close.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
Kitakami Side AHCAL Assembly or anywhere in any detector.
13-Aug-07 1 Coordination Activities around calo Barrel faces Aug 07) Meetings every Monday at 10:00 with team responsibles in UX15, 6th floor HO.
22/09/2011 ADO-PO section meeting ADO : Atlas Detector Operation PO : Project Office R. Vuillermet.
CBETA Technical Review
ADO-PO section meeting. ADO : Atlas Detector Operation
SBN Far Detector Installation & Integration
TAXS and TAXN ABSORBERS - OVERVIEW
Francois and Lau EATM 17 July 2012
Present status of the flux return yoke design
LHC Experimental Vacuum Systems Status October ‘07
Technical Support Activities in EP-ADO-PO
ATLAS ITk CO₂ Cooling pipe routing CO₂ Meeting, 28 June 2016
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
Initial BIS installation
Technical Support Activities in PH-ADO-PO
Installation plans from mid 2005
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

ATLAS closing scenario  Where we are  What is still be done before closing (ADO-PO support)  Closing scenario / Procedure / Schedule Prepared by Michel RAYMOND ADO-PO section meeting March 12th, 2009 March 12th, 2009

M. Raymond ADO-PO meeting – March 12 th, Where we are Side ASide C Side A Side C Atlas is in standard opening configuration Nominal gaps are granted except at a very few locations (Tile Extended Barrel) Access exist and are evolving depending on systems requests Most of them complies with expectations (2 sectors not reachable on BEE C side) No particular complain caused by the new layout of the Round scaffolding Current situation should be the baseline for future, including necessary improvements

M. Raymond ADO-PO meeting – March 12 th, Just to remind where the ADO-PO operation team is involved What is to be done before closing  EEL muon chambers installation in sector 5  Ring segments modification on JD  Shielding of LVPS on End Cap calorimeters  BOL6A11 and BOL6C15 repairs  Magnet preparation Only the main tasks that have to be done before the closing are mentioned To check all functionalities of the movement system A few improvements are on going (Traction control, Air distribution) Spare components have been ordered but will be partially here only, because of very long delivery time Done On going

M. Raymond ADO-PO meeting – March 12 th, Closing scenario : overview It will be the reverse scenario compare to the opening 1.Closing of side A 2.In parallel, fiber replacement on Big Wheels MDT chambers side A + closing of C side Octagonal shielding will be installed for the 1 st time 5 weeks Dismounting of platform Removing of BT Vacuum pump Chamber installation BT vacuum pump back Modification (?) and platforms back

M. Raymond ADO-PO meeting – March 12 th, Team activity All Barrel scaffoldings G.Akhperjanian I. Krasin S.Studenov S.Yukhimchuk Magnets P. Benoit M. Jeckel Magnets P. Benoit M. Jeckel BW movement + maintenance R. Vuillermet W. Andreazza C. Leboube V. Durastanti A. Yandyan BW movement + maintenance R. Vuillermet W. Andreazza C. Leboube V. Durastanti A. Yandyan Movement system M. Raymond D. Bertet F. Rosset A. Popov Movement system M. Raymond D. Bertet F. Rosset A. Popov L. Rose-Dulcina Supervision/operations M. Raymond P. Petit Supervision/operations M. Raymond P. Petit Barrel chambers + EE G. Spigo C. Leboube V. Durastanti A. Popov A.Yandyan Barrel chambers + EE G. Spigo C. Leboube V. Durastanti A. Popov A.Yandyan General support (team) General support (team) This is the main idea : detail will be decided according real time activity Follow up – ALARA O.Beltramello F. Pedrosa R. Vuillermet Follow up – ALARA O.Beltramello F. Pedrosa R. Vuillermet

M. Raymond ADO-PO meeting – March 12 th, Side ASide C Side A Side C Closing Side A (1) EBA closed 16/04/2009 Scaffoldings removal (JD, EB, then Barrel) Hydraulics connections EBA movement EIL4A11 replacement Air pads + hydraulics JD-A movement Fixed point on VA - Removing of temporary support of VT Installation of JD locking devices 30/03/ /04/2009 JD-A closed09/04/2009

M. Raymond ADO-PO meeting – March 12 th, Side ASide C Side A Side C Closing Side A (2) ECT-A closed 22/04/2009 ECT X-brackets removing Hydraulics connections ECT-A movement Support of VT-A AFT locking Hydraulics connection and truck movement Light truck to surface A-frame installation 15/04/ /04/2009 Truck to surface21/04/2009

M. Raymond ADO-PO meeting – March 12 th, Side ASide C Side A Side C Closing Side A (3) JFC1 installed 07/05/2009 Lowering of Compressed truck Lowering of JF table Hydraulics connection Lowering of JFC1 JFC1 positioning Beam pipe + Lucid Truck movement + lifting JFC2 installation + survey 23/04/ /04/2009 JFC2 installed06/05/2009

M. Raymond ADO-PO meeting – March 12 th, Fiber replacement – SIDE A Installation of JFC3 is delayed to give access to LUCID BW-A opening and decoupling – planned 4 days Tilt + 3 meters movement Columns installation MDT–TGC2 disconnection Load transfer to static columns Movement 1.5 meter toward IP Optical fibers replacement maintenance operations Using 1 lifting platform + 1 basket lifted by the crane Planned 6 days IP face opening Movement of chariot Load transfer Connection TGC2-MDT Movement to IP Disconnection MDT-TGC1 Load transfer Movement 1.5 meter Planned 3 days Optical fibers replacement + maintenance operations Using 1 lifting platform + 1 basket lifted by the crane Planned 6 days BW-A at closed position Closing the wheel Load transfer Connection TGC1-MDT Tilt Planned 1.5 day 07/05/ /06/ /05/ /05/ /05/ /06/200 9

M. Raymond ADO-PO meeting – March 12 th, Side A Side C Closing Side C 06/05/2009 Scaffoldings removal (JD, EB, then Barrel) Hydraulics connections EBC movement Air pads + hydraulics JD-C movement Fixed point on VA - Removing of temporary support of VT Installation of JD locking devices EBC closed19/05/2009 JD-C closed22/05/2005 ECT X-brackets removing Hydraulics connections ECT-C movement Support of VT-C AFT locking Hydraulics connection and truck movement Light truck to surface A-frame installation ECT-C closed28/05/2009 Truck to surface 02/06/ /05/2009 Lowering of Compressed truck Lowering of JF table Hydraulics connection Lowering of JFC1 JFC1 positioning Beam pipe + Lucid Truck movement + lifting JFC2 installation + survey JFC1 installed 08/06/2009 JFC2 installed 11/06/ /06/ /06/2009

M. Raymond ADO-PO meeting – March 12 th, Last activities 11/06/ /06/ /07/ /08/2009 Magnetic test 15/07/ /07/2009 EE side A EE side C Octagonal shielding side A Work on VJ beam pipe & LUCID Install JFC3 + plug Rails set up Lower compressed truck + JF table Truck positioning - hydraulic connection Lowering of JFS3 bottom part JFS3 bottom part positioning Air pads removal JFS3 top part installation - TAS survey Octagonal shielding side C Removing of all equipment and material from UX15 Shafts closing Activity in parallel on both sides need a very sharp organization

M. Raymond ADO-PO meeting – March 12 th, Improvement foreseen on closing/opening movement Improvements about the procedure close collaboration between Operation team and Safety team Follow up of the procedure and task durations Analysis of the procedure + Go to more details when necessary Add to the procedure the clear information on which material is removed and when Addition in the procedure of RPE intervention. Technical improvements on movement system Air flow panels have been lowered from top of the truck to the floor of the trench To monitor air will need one tech. instead of two Tech. will stand much further from activated area Many components duplicated to save not only time but also handling and access close to activated area Connection between Bcam and movement HMI is being developed will reduce the need of survey and make us more confident during movement

M. Raymond ADO-PO meeting – March 12 th, Plans for detectors positioning End Cap calorimeters Overall policy = do the same than during 1 st closing in 2008 Method and tooling is kept unchanged 1.Checking of the distances between Tile fingers and ITC 2.Adjustment of stoppers and electrical switches 3.To perform the movement until stoppers are touching What is our goal : nominal position or “previous run” position ? To be confirmed JD + Small wheels 1.Tilt back the JD to the nominal angle 2.Adjust the new ring segments accordingly Goal : be as close as possible from nominal position End Cap Toroid Big wheels So far, no change in requirements  no change in the procedure Goal : be as close as possible from “previous run” position ? To be confirmed Measurement done on C side after fibers replacement shows no relative movement between wheels. Last positioning will be reproduced Shielding Goal : place the various parts as they were, Final survey needed (for magnetic reason)