Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Electronics Review Review of cable procurement and installation Davide Piccolo INFN Napoli.
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Components Connection Jig Graph Paper (#4101) Mounting Blocks (#5902) Nails Tape Measure Pen Hammer Customer Coordinates.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
Walls crates cables gas chambers electronics CERN adb.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
December 2008 Geneva Proposed amendments to the UNECE Regulation No. 29 on truck cab safety Russian Federation Transmitted by the expert from the Russian.
TIB cables and optical fibers ______________________________________________________ 13/7/06 CMS-Pisa group.
FTOF – CABLE RUNS Joe Guerra. Terms/Definition FTOF – Forward Time of Flight PCAL – Pre-shower Calorimeter PMT – Photo Multiplier tube Panel 1A – Existing.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
Preparation of SPD Cabling Calo comissioning meeting – 19th July 2006 – CERN I.Status of cables II.Cable reels III.Labelling IV.Cabling inside a VFE box.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Some questions:  In which order cables will be put ?  Who, where will put PS signal cables in bundles ?  Which kind of cable binders: velcro or panduit.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
Booster LV Electrical Distribution: Schedule and Quantities Aims: Modernisation of Booster electrical infrastucture To install necessary infrastructure.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Positioning fork M. Ciappeti R. Vuillermet 29/09/20111.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
SPD cabling issues I.Cable status II.Cabling inside VFE box III.Cable through chains (Gael) IV.Data spare cables V.Control bundles VI.Information for cabling.
19 January 2006VELO installationEddy Jans 0 VELO-installation meeting CERN, January 17, 2006 preparation IP8-area SX8 moving SX8 -> IP8.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
GM sensor tests and installation A.Jeremie K.Artoos, D. Kudryavtsev, Y.Renier, R.Tomas-Garcia, D.Schulte.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
HIGH RADIATION TO MATERIALS: EXPERIMENTAL AREA HiRadMat Users meeting, 14/7/2011 Outline  Location  Test zone  Test tables geometry and position  Services.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
M1 Central Part Cable Routing R3 FAR R2 CLOSE R2 FAR + GEM A3 B From chain GEM R2 CLOSE R2 FAR A1 20 A1 A1 A2 A CHAIN Access Front Dané.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Single phase ProtoDUNE detector installation Plans and Constraints Jack Fowler Duke University 23-Feb-2016.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
Test beam check list Michael JECKEL EN-EA-EC. Content: Safety & Radiation Protection Arrival Access Installation Departure Michael JECKEL EN-EA-EC.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
FED Front Panel Hole Size Problem
Test beam check list Michael JECKEL EN-EA-EC.
St. George Infrastructure
Service channels between Tracker and PP1
Service channels between Tracker and PP1
Update of MVD services and requests
VELO-installation meeting CERN, January 17, 2006
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
RD51-WG X June test beam experience: useful information for October
Services – First Considerations Sigi Wenig / Nicolas Massol ATLAS Tracker Upgrade Workshop Valencia December 2007 Existing services (in cryostat.
NA62 RICH ELECTRONICS LOGISTIC Part 2 R. Ciaranfi 25/05/2011.
Endcap shielding senarios:
Chamber Design and Integration RE3/1 and RE4/1
Introduction Jason Tarrant – Integration Engineering Step IV Removal
Coordinate system for the GIF as defined for CMS RPCs
LS1 status 24/03/2014.
General wiring procedure for a new instrument
Neutron guide Shielding Concept
Rack Placement Chopper Workshop
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

Services in GIF++ A pictorial record of the work HV Cables LV cables DCS cables Signal Cables Ian Crotty 17 Dec 2014

Cables coming up through hole in floor Signal Cables (x38, Ø 10mm) HV cables (x1, Ø40mm) LV (x5, Ø10mm) I2C (x1, Ø10mm) Down stream Cabling Accepted by GIF++ coordination

Down stream Signal x 38 HV #1 DCS #1 LV 1

Up stream Cabling Accepted by GIF++ coordination Cables coming up through floor Signal Cables (x30, Ø 10mm) HV cables (x1, Ø40mm) LV (x5, Ø10mm) I2C (x1, Ø10mm)

Up stream cabling Signal x 30 HV #1 DCS #1 LV 1 Source Upstream beam entry and TGC

Cable numbering & layout Tables of cable destination are here; upscope/RPC/GIFPlusPlus/Services/CablesDestinationsGIFPPDec2014.xlsx

Routing under shielding wall and slack under GIF floor Access to rack zone HV slack and signal slack to down stream

Rack side cabling and slack Slack up against shield wall Passage thru rack floor Access to GIF under shield wall Front of Rack

Our Russian collegeaues and Michele

Cabling done so far HV, LV Signal and DCS(I2C) cables all laid from Rack to inside GIF++, Down Stream and Up Stream. HV, Signal and 4 LV have been connectorised The remaining LV & DCS have to be cut to length, connectors mounted and tested. Signal cables are all labelled, see table. LV, DCS and HV must be relabelled. The cabling to the preparation zone has to be done, all cables are available but all need connectors except for the 2 signal.

Preparation zone Signal Cables (x2, Ø 10mm) HV cables (x1, Ø40mm) LV (x1, Ø10mm) I2C (x1, Ø10mm)

Man power & logistics required The cabling was successful and rapid with 4 Russian cabling experts from P5, M. Franco, Silveriano and myself. The job was strenuous but rapid once the Russian cabling experts from P5 arrived. The heavy 220kg floor panels have to be removed for the cabling In all 3 zones. These are removed with a mobile device inside the GIF++ making access difficult. Those outside may be done with the hall crane. This has to be coordinated with the crane people. “IMPACT” and EDH documents are necessary. All colleagues need Helmets, safety shoes and dosimeter.

This presentation is available here; More photos upscope/RPC/GIFPlusPlus/Services/PhotosCableLay11to16Dec2014/ upscope/RPC/GIFPlusPlus/Services/ upscope/RPC/GIFPlusPlus/Services/PartialCabling11to16Dec2014GIFPl usPlus.pptx