Introduction Jason Tarrant – Integration Engineering Step IV Removal

Similar presentations


Presentation on theme: "Introduction Jason Tarrant – Integration Engineering Step IV Removal"— Presentation transcript:

1 Introduction Jason Tarrant – Integration Engineering Step IV Removal
Cooling Demo Preparation Cooling Demo Installation March 2016

2 Most change in this region
Dismantle Step IV Most change in this region

3 Preparation PRY Base design Removal of these panels for RF access
Change to only 3 leg + trimming of current parts New ~As-is (but 3 leg) As-is New Changes As-is

4 RF devices removed on moving platforms
Preparation Partial Return Yoke (PRY) – RF Access Recent decision to remove this upper middle panel for major south side experimental access to increase safety RF devices removed on moving platforms

5 Additional ramp cut for PRY bases & Tracker Cryo units
Preparation Concrete ramp cutting S W E N Beam Direction Additional ramp cut for PRY bases & Tracker Cryo units SSU & PRY not changing

6 Preparation False Floor & Sub Structure
Sub floor supports to be changed for compatibility with PRY interfaces (& current underlying services in this area)

7 Cuts & supports for RF Amplifiers & Coax
Preparation North Mezzanine Changes Cuts & supports for RF Amplifiers & Coax

8 Hinged front edge to be removed Sub-structure & services changes
Preparation South Mezzanine Changes Holes for RF H2 removed Hinged front edge to be removed Sub-structure & services changes

9 Preparation Moving Platform Baseplates (G Stokes, N Collomb) New New
Altered New New Moved As-is

10 Sub floor plates, levelled & fixed
Preparation False Floor & Sub Structure Sub floor plates, levelled & fixed

11 Preparation Moving Platform Install fitting & dry run (G Stokes, N Collomb) Moved New New New Moved As-is

12 Preparation Services management fixings
Preparations for services management for: Magnet power & instrumentation (DL) High pressure compressor hoses (P Barclay) RF Coax (A Muir) Vacuum (M Tucker, P Barclay) Etc…

13 Preparation RF – X-Ray Shielding Review & Actions MICE-ISIS
RF Working Group: M Keelan, T Stanley, K Ronald, A Moss… = Review of x-ray shielding requirements - Document - Design - Agree etc.

14 Preparation Deep Clean

15 Installation Moving Platform Install (G Stokes, N Collomb)

16 Installation MICE Cooling Demo Experiment Compensating bellows?

17 Secondary absorber (N Collomb)
Installation MICE Cooling Demo Experiment – New devices & components Primary Absorber RF Device (A DeMello, T Loew, A Lambert) Secondary absorber (N Collomb)

18 Installation Partial Return Yoke (PRY) – H Witte, S Plate

19 Installation RF System

20 Magnet cables, compressors hoses etc.
Installation …& other Services Vacuum Magnet cables, compressors hoses etc.

21 Installation PRY North Side Access Platform

22 Layout, Design, Review, Tender Manufacture, Acceptance
Schedule Schedule Longer Lead Items e.g. Primary Absorber Vessel (not standard m/c contractor = longer tender?) PRY Bases (large no. of components ready to go from mid -2016) Layout, Design, Review, Tender Manufacture, Acceptance Prep Step IV running Install Step IV running Integration Engineering – Working Schedule

23 Design

24 Conclusion Engineering changes from Step IV to Cooling Demo
Majority of engineering changes based on existing Step IV systems e.g.: Most services, PRY, PRY interfaces, Moving platforms ... ‘New’ work mostly related to RF system, e.g.: RF devices, RF coax routing, Amplifiers, X-Ray shielding… A lot of work already completed for Cooling Demo engineering All of the above ‘owned’ and design progressing well (most detailed / released, incl. analysis & even manufacture e.g. PRY support wedge system) System interactions being managed (Integration Engineering) Long lead items being identified for more immediate work, e.g. Absorber vessel (outstanding vacuum interactions) PRY interfaces (outstanding vacuum interactions & RF access) Both these = drawings complete, final analysis / review being undertaken


Download ppt "Introduction Jason Tarrant – Integration Engineering Step IV Removal"