(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and.

Similar presentations


Presentation on theme: "(1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and."— Presentation transcript:

1 (1/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger PS East Area Update Outline Layout updates of the facility Conveyer options Mock-up preparation and cable handling Other news

2 (2/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities 24 GeV/c proton beam

3 (3/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities IRRAD proton facility PH/DT 24 GeV/c proton beam LHC experiments 24 GeV/c proton beam

4 (4/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities Mixed Particle field facility R2E Project 24 GeV/c proton beam

5 (5/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities Ventilation system Both zones will be ventilated

6 (6/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities Technical local Connection to the radiation area 24 GeV/c proton beam

7 (7/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities Control room Dry run test 24 GeV/c proton beam

8 (8/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities Platform for the Dry Run test of heavy equipment e. g. UPS, Power converters

9 (9/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger East Area Facilities Platform for the Dry Run test of Heavy equipments e. g. UPS, Power converter This platform will be enlarged up to here 24 GeV/c proton beam

10 (10/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger Mixed Field Facility Target storage area Sliding Shielding door Test area for small object (components) Small conveyer path (Montrac rail) Loading area Local shielding door Cable path from the technical local to the radiation area Patch panel for connections Motors for the mobile shielding 24 GeV/c proton beam Mobile shielding Example of test locations

11 (11/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger Target storage area

12 (12/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger Conveyer systems MLR (auto-guided): We contacted the company For further iteration we would require the updated layout (incl. step-file) and sketch Costs will likely be high (~100kEUR) for 1t payload Other Options: SEAQX Motorized wheel (to integrate) Trailer system Damped lifting and transport Air cushion systems (to integrate) AEROGO TRANDLOG SMEYERS We will take contact with them

13 (13/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger Montrac conveyer o Montrac Rail  No load on the walls as the Montrac rail stands on under frames. o Montrac Rail:  Possibility to use a software + screen to control it Location of the control rack to be discussed Can be installed inside a 19’’ Rack

14 (14/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger Mock-up preparation and cable handling Mock-up  Mock-up of the Mixed field facility (Only radiation zone)  Ordering of cables (Power cables + control cables) of 20 m length to check their flexibility when used in the cable holder chain. (e. g. Test of a recent NE48 cable + a custom made to check their flexibility, flexible DC and 3-phase cable, ND26 etc…)  A Mock-up of the most large item to be tested will be done (UPS)  The weight of cables for the mock-up (ceiling) : 300 kg.  The mock-up will have a ceiling  No load on the wall as the montrac rail will stand on under frames.  Looking for a ball caster rail to be fixed on the ceiling to hang the cable holder chains  5 cables holder chain of 20 meters length have been ordered.  A lifting system option for the equipment to be tested has been found. Cable handling To avoid the storage of too many cables in the connection area:  Connection area will only provide a patch-panel for the full (maximum) cabling requirements (including services like pressurised air, water, etc.)  The required cabling will be prepared prior the test together with the flexible cable holders irradiated cables (and holders) will be stored in the internal/external storage area (to be defined) for later re-use

15 (15/15) 08/05/13 – RadWG meeting J. Mekki M. Brugger Other News  Target: Three fixed installed target for varying beam intensity Materials Aluminium (×2) and copper (×1) (allowing for intensity reduction of about 2.5 and 4)  Second aluminium target shall include longitudinal holes to allow for the largest reduction (/4)  1 empty slot (e.g. direct beam sample tests)  Expected operation with Beam-Parameters (first guess): standard operation (with one of the massive targets in place): any sigma between 5 to 25mm is ok for us reduced intensity operation (with aluminum target including ‘holes’): any sigma between 10-25mm is ok for us small component tests with target in place: sigma larger than 15mm required without target in place: largest possible sigma at small sample location  Name of mixed-beam facility (thanks to Ruben!): CHARM-PS (Cern High Energy Accelerator Mixed field/facility at the PS)