Presentation is loading. Please wait.

Presentation is loading. Please wait.

Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.

Similar presentations


Presentation on theme: "Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008."— Presentation transcript:

1 Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008

2 IRP1 Review - Y. Muttoni TS-ICC Summary Study inputs and limitations Equipment in place UJ14 Study implantation new equipment UJ14 Equipment in place RZ54-USC55 Equipment in place UJ56 Study implantation new equipment By-pass USC55 Conclusions 1/24/20162

3 IRP1 Review - Y. Muttoni TS-ICC Equipment (compared to existing solution). Add energy extraction (DQR-DQS). Electrical feed box outside beam. Cold D1 magnet. Limit Implantation studied around Pt1 in UJ14 (UJ16 symmetrical). Implantation racks studied inside by-pass near USC55. Electrical feed box like DFBL used. New electrical link. New DQR (mechanical or semiconductor). Study inputs and limitations 1/24/20163

4 IRP1 Review - Y. Muttoni TS-ICC Geographical location 1/24/20164

5 IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 5

6 IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 UJ14 IP1 UJ13 Space reserved for transport 1/24/20166

7 IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ14 1 st floor UJ14 1 st floor IP1 UJ13 UTA 1/24/20167

8 IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 8 Transport area

9 IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 DFBL 2x13KA 6x600A 2x120A 1/24/20169

10 IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 1 st floor 10

11 IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 Electrical link Routing link should be studied more in detail Existing holes through shielding wall 1 st floor 11

12 IRP1 Review - Y. Muttoni TS-ICC New equipment in UJ14 1/24/201612

13 IRP1 Review - Y. Muttoni TS-ICC New equipment in UL14 D1 cold Cryogenic link Electrical link 13

14 IRP1 Review - Y. Muttoni TS-ICC New equipment in US15 D1 cold Cryogenic link Electrical link 1/24/201614

15 IRP1 Review - Y. Muttoni TS-ICC New equipment in US15 D1 cold Cryogenic link Electrical link 1/24/201615

16 IRP1 Review - Y. Muttoni TS-ICC Geographical location USC55 1/24/201616

17 IRP1 Review - Y. Muttoni TS-ICC Equipment in place RZ54-USC55 17

18 IRP1 Review - Y. Muttoni TS-ICC Equipment in place UJ56 18

19 IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 New rack layout symmetrical for each side Routing link should be studied more in detail Transport area 19

20 IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 USC55 By-Pass Cross section 20 Transport area

21 IRP1 Review - Y. Muttoni TS-ICC New Equipment Point 5 1/24/201621

22 IRP1 Review - Y. Muttoni TS-ICC Conclusions New electrical link: Routing link should be studied in detail at point 5. Distance between DFB and Inner triplet is may be too far at point 5? New rack layout New cable (Control, power) routing required. New cooling water pipe routing required. Audit of rack use required with all owners (optimize space?). New position of control access is necessary at point 1. New energy extraction Required for space constraints Checking metallic structure in point 1. Electrical feed box New design or using DFBL? Implantation equipment Radiation issue. 1/24/201622


Download ppt "Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008."

Similar presentations


Ads by Google